Fence Construction Cost Estimate — 50 m length, 1.8 m high

50 m length, 1.8 m high 17 work items 5 sections Toronto, Canada

About This Project

Cost estimate for installing 200 metres of perimeter fencing. Covers post foundations, steel or aluminum fence panels, gates (pedestrian and vehicular), post caps, anti-climb features, and painting or galvanizing finish. Suitable for residential, commercial, or institutional perimeter security.

Scope of Works

Site Preparation (3)Posts & Foundations (5)Panels & Rails (3)Gate (4)Finishing (2)

Get a Personalized Estimate for Your Project

Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.

Calculate Cost for My Project →
Full Professional Estimate
0 items changed

Overview

iKey project metrics at a glance — total cost per m², labor and material shares, and estimated duration
Source: Text Query
C$1,242.38
Cost / m²
23.6%
Labor
31.4%
Materials
74 days
Est. Duration

Project Context

iInput parameters, location adjustment factors, and detection confidence for this estimate
Source
General
50 m² · 15 items
SourceText Query
Work Items15 items · 5 Categories
CurrencyC$ CAD
LanguageEnglish
Date05 Apr 2026
Fence Construction 50 m length, 1.8 m high Toronto Canada
Cost / m²
C$1,242.38
50 m²
Est. Duration
2 months
74 days
Overhead
15%
C$7,365.92
Direct Costs
79%
C$49,106.11
Location
Toronto, Canada
Americas
×1.07
Estimate Overview
C$62,119.23
C$1,242.38 / m² · 2 months (74 days)
Labor 24% Materials 31% Equipment 24% Overhead 12% Profit 9%
Contingency (P80)
+8%
C$5,218.02
Budget (P80)
C$67,337.25
recommended
Resources
68
40 mat · 4 lab · 24 equ
Overhead + Profit
12% + 9%
C$13,013.12
Pricing Methodology
Data Source: DDC Pricing DB — English · 55,719 items · CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%

Cost Breakdown

iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$49,106.11Direct Cost
Labor (24%)C$14,689.43
Materials (31%)C$19,514.88
Equipment (24%)C$14,901.80
Overhead (12%)C$7,365.92
Profit (9%)C$5,647.20
Cost / m²
LaborC$293.79
MaterialsC$390.30
EquipmentC$298.04
OverheadC$147.32
ProfitC$112.94
Grand TotalC$1,242.38
Materials / Labor
1.33
Direct Cost %
79.1%
15 work items across 5 categories, 68 resources

Cost Flow

5iVisual flow of the total budget through work categories, showing proportional cost distribution
Total CostC$62,119.23Gate: C$6,236.57 (10.0%)Finishing: C$286.79 (0.5%)Panels & Rails: C$24,282.29 (39.1%)Site Preparation: C$3,778.41 (6.1%)Posts & Foundations: C$27,535.15 (44.3%)Gate10.0%Finishing0.5%Panels & Rails39.1%Site Preparation6.1%Posts & Foundations44.3%
  • Complete BOQ: 17 work items for Fence Construction
  • 2 work item(s) not found in pricing DB for language 'en'.

Categories

5iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
CategoryCostCost / m²Share
GateC$6,236.57C$124.7310.0%
FinishingC$286.79C$5.740.5%
Panels & RailsC$24,282.29C$485.6539.1%
Site PreparationC$3,778.41C$75.576.1%
Posts & FoundationsC$27,535.15C$550.7044.3%

Top Items

DescriptionTotal
Installation of prefabricated reinforced concrete non-s…C$21,562.37
Installation of single non-separable supports without s…C$19,080.15
Installation of single-post road signs on prefabricated…C$6,261.34
Installation of fences: wire multi-rowC$3,327.00
Segmented gate (without support hinges): balanced (full…C$2,814.89

What-If Scenarios

iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$55,907.31
↓ C$6,211.92 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$62,119.23
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$71,437.11
↑ C$9,317.88 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor 0%
Materials 0%
Equipment 0%
Custom Scenario Total Cost
C$62,119.23

Project Schedule

≈2 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
2
months
74
days
7
phases
4
Critical Path
6
Peak workers
758
Labor Hours
M1 M2 M3 Crew/Float Site Preparation Site Preparation: 8d, Crew 2, Float 0d 8d 2 / - Earthworks Earthworks: 8d, Crew 2, Float 0d 8d 2 / - Foundation Work Foundation Work: 34d, Crew 2, Float 0d 34d 2 / - Structural Framework Structural Framework: 24d, Crew 2, Float 0d 24d 2 / - Painting and Finishes Painting and Finishes: 8d, Crew 2, Float 58d 8d 2 / 58d Landscaping and Site … Landscaping and Site Work: 11d, Crew 2, Float 55d 11d 2 / 55d Testing and Commissio… Testing and Commissioning: 8d, Crew 2, Float 55d 8d 2 / 55d Workers 62K 50% (49d)
Site PreparationEarthworksFoundation WorkStructural FrameworkPainting and FinishesLandscaping and Site WorkTesting and CommissioningCumulative Cost
Labor Hours by Phase
Foundation Work
353 hours
Structural Framework
247 hours
Landscaping and Site
110 hours
Testing and Commissi
50 hours
Site Preparation
38 hours
Painting and Finishe
8 hours
Earthworks
2 hours

Monthly Cash Flow

3 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
31%
M1
71%
M2
100%
M3
MonthdaysMonthly Cost%Cumulative%
M11–30C$19,103.9730.8%C$19,103.9731%
M231–60C$25,198.1240.6%C$44,302.0971%
M361–74C$17,817.1228.7%C$62,119.21100%

Daily Cash Flow

11 weeks
2%
D1
14%
D8
17%
D15
23%
D22
30%
D29
37%
D36
44%
D43
51%
D50
65%
D57
80%
D64
94%
D71
100%
D74
WeekdaysWeekly Cost%Cumulative%
W1D1–D7C$7,525.7812.1%C$7,525.7812%
W2D8–D14C$2,830.054.6%C$10,355.8317%
W3D15–D21C$3,135.925.0%C$13,491.7522%
W4D22–D28C$4,365.067.0%C$17,856.8129%
W5D29–D35C$4,365.067.0%C$22,221.8836%
W6D36–D42C$4,365.067.0%C$26,586.9443%
W7D43–D49C$4,365.067.0%C$30,951.0050%
W8D50–D56C$8,259.4913.3%C$39,211.4963%
W9D57–D63C$8,908.5614.3%C$48,120.0577%
W10D64–D70C$8,908.5614.3%C$57,028.6192%
W11D71–D74C$5,090.618.2%C$62,119.21100%

Line Items

15 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
Site Preparation 2 items C$3,778.41
#CodeDescriptionQtyUnitUnit PriceTotal
1RILI_KADX_KAKAME_KALIInstallation of fences: wire multi-row50.0
50 m(Site Preparation)
mC$52.60C$3,327.00
C$2,630.04 +15% C$394.51 +10% C$302.45
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 118.59hrsC$23.10C$429.60
Technical gaseous oxygen0.60m3C$37.06C$22.43
Crushed stone from dense rock for construction work M 1000, fraction 20-40 mm0.34m3C$569.85C$196.60
Low-carbon galvanized steel wire for various purposes, diameter TO.KA mm0.05tC$18,125.98C$906.28
Oil paint MA-011-0, MA-011-1, MA-011-1N, MA-011-2, MA-011-2N0.01tC$27,829.58C$139.15
Enamel HV-1610.01tC$32,685.37C$163.41
Combined drying oil for interior finishing works0.01tC$18,807.91C$282.12
Drilling and crane machines on a truck chassis, drilling diameter up to 800 mm, drilling depth up to 5 m1.41Machine hoursC$127.58C$179.89
Personnel: 1 person-hour/machine-hour1.41Machine hoursC$15.67C$22.09
Mobile cranes, lifting capacity 16 t2.92Machine hoursC$75.08C$219.25
Personnel: 1 person-hour/machine-hour2.92Machine hoursC$18.31C$53.48
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t0.02Machine hoursC$77.92C$1.56
Personnel: 1 person-hour/machine-hour0.02Machine hoursC$15.67C$0.31
Flatbed trucks, load capacity up to 5 tons0.32Machine hoursC$29.16C$9.33
Personnel: 1 person-hour/machine-hour0.32Machine hoursC$13.63C$4.36
Gas welding and cutting equipment0.70Machine hoursC$0.25C$0.17
2NEVO_KATO_KAKAPU_KAMEDismantling of metal fences up to 1 m high50.0
50 m(Site Preparation)
mC$7.14C$451.41
C$356.84 +15% C$53.53 +10% C$41.04
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average workload TO.KA14.77hrsC$23.73C$350.33
Electricity1.81kWhC$0.30C$0.54
Flatbed trucks, load capacity up to 5 tons0.15Machine hoursC$25.57C$3.84
Personnel: 1 person-hour/machine-hour0.15Machine hoursC$14.17C$2.13
Posts & Foundations 5 items C$27,535.15
#CodeDescriptionQtyUnitUnit PriceTotal
3PULI_KARI_KATODX_MEME
Mechanized digging of holes with dimensions: 1.0x0.6 m on medium soils
18.0
18 pcs(Posts & Foundations)
pcsC$3.17C$72.08
C$56.98 +15% C$8.55 +10% C$6.55
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 12.05hrsC$19.19C$39.37
Hydraulic diggers0.44Machine hoursC$1.51C$0.66
Pneumatic-tired tractors, power 59 kW (80 hp)0.44Machine hoursC$26.06C$11.45
Personnel: 1 person-hour/machine-hour0.44Machine hoursC$12.52C$5.50
4RILI_KADX_KAMEKA_KATO
Installation of single-post road signs on prefabricated reinforced concrete foundations and reinforced concrete posts wi
1.0
1 m³(Posts & Foundations)
m3 of racksC$4,949.68C$6,261.34
C$4,949.69 +15% C$742.45 +10% C$569.21
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 156.79hrsC$20.18C$1,145.99
Natural sand for construction works, class II, medium1.65m3C$927.83C$1,530.84
Forgings from square billets, weight ME.SA-PU.SA kg0.01tC$87,443.98C$874.45
Drilling and crane machines on a truck chassis, drilling diameter up to 800 mm, drilling depth up to 5 m1.25Machine hoursC$114.73C$143.40
Personnel: 1 person-hour/machine-hour1.25Machine hoursC$13.69C$17.11
Mobile cranes, lifting capacity 16 t14.68Machine hoursC$67.52C$991.17
Personnel: 1 person-hour/machine-hour14.68Machine hoursC$15.00C$234.83
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t0.11Machine hoursC$70.07C$7.70
Personnel: 1 person-hour/machine-hour0.11Machine hoursC$13.69C$1.51
Flatbed trucks, load capacity up to 5 tons0.07Machine hoursC$26.22C$1.84
Personnel: 1 person-hour/machine-hour0.07Machine hoursC$11.91C$0.84
5SADX_KAME_KAKAVO_KAMEReinforcement of metal fence posts18.0
18 pcs(Posts & Foundations)
pcsC$8.82C$200.85
C$158.77 +15% C$23.82 +10% C$18.26
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 14.33hrsC$25.82C$111.77
Ready-mixed masonry mortar, cement, M1000.01m3C$202.26C$2.55
Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes0.01tC$6,155.57C$44.32
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.01Machine hoursC$2.54C$0.02
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$12.31C$0.11
6KADX_KAVO_KAKAME_KAPU
Installation of metal posts over 4 m high: with immersion in concrete foundation
18.0
18 pcs(Posts & Foundations)
pcsC$84.35C$1,920.73
C$1,518.37 +15% C$227.75 +10% C$174.61
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average workload TO.KA6.98hrsC$17.04C$118.89
Planed softwood bars (pine, spruce), dimensions 50x50 mm, grade AB0.03m3C$38,931.06C$981.15
Drilling and crane machines on a truck chassis, drilling diameter up to 800 mm, drilling depth up to 5 m2.32Machine hoursC$115.70C$268.64
Personnel: 1 person-hour/machine-hour2.32Machine hoursC$11.70C$27.17
Concrete mixer trucks, drum capacity 6 m32.01Machine hoursC$46.09C$92.66
Personnel: 1 person-hour/machine-hour2.01Machine hoursC$11.70C$23.53
Flatbed trucks, load capacity up to 5 tons0.17Machine hoursC$26.44C$4.57
Personnel: 1 person-hour/machine-hour0.17Machine hoursC$10.18C$1.76
7RIVO_KARI_KAKARI_KADX
Installation of single non-separable supports without support plates: with 2 beds "from the field" on the section or at
18.0
18 pcs(Posts & Foundations)
pcsC$837.95C$19,080.15
C$15,083.13 +15% C$2,262.47 +10% C$1,734.56
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1232.20hrsC$16.70C$3,877.43
Bulldozers, power 79 kW (108 hp)10.26Machine hoursC$51.93C$532.78
Personnel: 1 person-hour/machine-hour10.26Machine hoursC$13.99C$143.56
Mobile cranes, lifting capacity 16 t14.76Machine hoursC$66.19C$976.90
Personnel: 1 person-hour/machine-hour14.76Machine hoursC$13.99C$206.52
Machines for digging pits for contact network supports when working "from the field"41.58Machine hoursC$160.59C$6,677.28
Personnel: 1 person-hour/machine-hour41.58Machine hoursC$14.93C$620.89
Tractor trailers, load capacity up to 2 tons38.52Machine hoursC$0.63C$24.20
Crawler tractors, power 79 kW (108 hp)38.52Machine hoursC$40.56C$1,562.35
Personnel: 1 person-hour/machine-hour38.52Machine hoursC$11.97C$461.22
Panels & Rails 3 items C$24,282.29
#CodeDescriptionQtyUnitUnit PriceTotal
8TOTO_KAME_KAKAME_KAPU
Installation of prefabricated reinforced concrete non-separable footboards: for supports with braces with a volume of up
17.0
17 pcs(Panels & Rails)
m3C$1,002.67C$21,562.37
C$17,045.35 +15% C$2,556.80 +10% C$1,960.22
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 182.45hrsC$21.64C$1,784.14
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm30.60kgC$90.00C$2,754.11
Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm0.34tC$30,330.56C$10,312.40
Mobile cranes, lifting capacity 16 t20.06Machine hoursC$69.53C$1,394.87
Personnel: 1 person-hour/machine-hour20.06Machine hoursC$16.34C$327.71
Special-purpose all-terrain vehicles, load capacity up to 8 tons5.27Machine hoursC$70.23C$370.10
Personnel: 1 person-hour/machine-hour5.27Machine hoursC$16.34C$86.09
Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 13.40Machine hoursC$4.69C$15.93
9KALI_KAME_KASAPU_KATO
Installation of reinforced concrete fences made of panels with a length of: PU.VO m with a column spacing of RI.PU m
17.0
17 pcs(Panels & Rails)
mC$39.61C$851.72
C$673.30 +15% C$100.99 +10% C$77.43
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 112.75hrsC$17.33C$220.96
Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m30.17Machine hoursC$41.71C$7.09
Personnel: 1 person-hour/machine-hour0.17Machine hoursC$12.21C$2.07
Mobile cranes, lifting capacity 16 t4.98Machine hoursC$66.69C$332.31
Personnel: 1 person-hour/machine-hour4.98Machine hoursC$14.27C$71.08
Flatbed trucks, load capacity up to 5 tons0.46Machine hoursC$25.90C$11.80
Personnel: 1 person-hour/machine-hour0.46Machine hoursC$10.62C$4.84
Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 10.45Machine hoursC$4.49C$2.03
Installation of reinforced concrete fences made of panels with a length of: PU.V17.00mC$1.24C$21.11
10NEKA_KAME_KAMEDX_KAMEReplacement of caps on chimneys for one channel18.0
18 pcs(Panels & Rails)
pcsC$82.05C$1,868.20
C$1,476.84 +15% C$221.53 +10% C$169.84
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average workload TO.KA47.38hrsC$23.93C$1,134.14
Construction nails0.00tC$189,001.94C$340.30
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.04Machine hoursC$2.37C$0.09
Personnel: 1 person-hour/machine-hour0.04Machine hoursC$12.71C$0.51
Flatbed trucks, load capacity up to 5 tons0.04Machine hoursC$25.66C$1.16
Personnel: 1 person-hour/machine-hour0.04Machine hoursC$14.30C$0.65
Gate 4 items C$6,236.57
#CodeDescriptionQtyUnitUnit PriceTotal
11RIKA_KAME_KATOVO_KARImCombined power supply installation panel: transformer1.0
1 pcs(Gate)
setC$1,280.78C$1,620.19
C$1,280.78 +15% C$192.12 +10% C$147.29
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 134.04hrsC$25.28C$860.39
Polyethylene tapes with adhesive layer, transparent, width 20 mm, thickness KA.KAVO mm0.78kgC$44.52C$34.72
Bolts with nuts and washers for construction0.45kgC$8.47C$3.81
Nylon cable ties, non-opening, TO.NE x 250 mm1.69100 pcsC$3.76C$6.35
Permanent markers, black, line width KA.TO mm0.0310 pcsC$37.78C$1.13
Tinned copper cable sleeves for crimping to connect wires and cables with copper conductors with a cross-section of 10 mm2, inner diameter 5 mm3.20100 pcsC$87.50C$280.00
Heat-shrinkable polyethylene tubing, wall thickness ME-ME.SA mm, inner diameter 20-60 mm1.60mC$2.24C$3.59
BM polystyrene marking tags, dimensions 50x25 mm0.53100 pcsC$4.84C$2.57
Mobile cranes, lifting capacity 16 t1.05Machine hoursC$65.16C$68.42
Personnel: 1 person-hour/machine-hour1.05Machine hoursC$18.86C$19.80
12KALI_KAME_KASASA_KAMEInstallation of swing gates with posts: metal2.0
2 pcs(Gate)
pcsC$708.97C$1,793.70
C$1,417.94 +15% C$212.69 +10% C$163.06
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 135.60hrsC$26.72C$951.23
Welding electrodes for welding low-alloy and carbon steels ANO-6, E42, diameter 6 mm0.00tC$48,384.47C$29.02
Bolts with nuts and washers for construction3.20kgC$71.25C$227.97
Ready-mixed masonry mortar, cement, M250.00m3C$1,523.47C$0.93
Single solid ceramic brick, dimensions 250x120x65 mm, grade M1000.001000 pcsC$7,015.99C$15.40
Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m30.13Machine hoursC$42.37C$5.62
Personnel: 1 person-hour/machine-hour0.13Machine hoursC$16.06C$2.13
Mobile cranes, lifting capacity 16 t2.04Machine hoursC$67.76C$138.55
Personnel: 1 person-hour/machine-hour2.04Machine hoursC$18.77C$38.38
Deep vibrators0.48Machine hoursC$0.56C$0.27
Flatbed trucks, load capacity up to 5 tons0.18Machine hoursC$26.32C$4.75
Personnel: 1 person-hour/machine-hour0.18Machine hoursC$13.97C$2.52
Welding machines for manual arc welding, welding current up to 350 A0.81Machine hoursC$1.46C$1.18
13RIRI_KARI_KAPUPU_KARIm
Segmented gate (without support hinges): balanced (full-turn)
1.0
1 pair(Gate)
tC$2,225.21C$2,814.89
C$2,225.21 +15% C$333.78 +10% C$255.90
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 131.60hrsC$29.93C$945.80
Rectified technical ethyl alcohol, grade I0.02kgC$34.86C$0.70
Technical gaseous oxygen1.53m3C$6.21C$9.50
Propane-butane technical mixture0.23kgC$2.72C$0.62
Electricity8.53kWhC$0.28C$2.38
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm22.50kgC$5.75C$129.46
Bolts with nuts and washers for construction0.11kgC$8.06C$0.88
Sanding paper0.43m2C$11.65C$5.01
Calendered rubber mixture made of SKMS-30ARKM15 rubber, hardness 80-100 Shore A units, thickness ME.SA mm0.03kgC$13.43C$0.40
I-beams with parallel flanges, steel grades St3sp, St3ps, No. 10B-18B0.02tC$4,013.93C$80.27
Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mm0.01tC$2,524.63C$25.25
Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 180-200 mm, shelf thickness 11-30 mm0.02tC$2,369.04C$47.38
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade II0.02m3C$560.84C$11.22
Adhesive, brand 88-NP0.03kgC$22.59C$0.67
Tower cranes, load capacity 50 tons1.30Machine hoursC$145.69C$189.40
Personnel: 1 person-hour/machine-hour1.30Machine hoursC$20.45C$26.59
Gantry cranes, lifting capacity 50 t2.27Machine hoursC$224.08C$508.66
Personnel: 2 man-hours/machine-hour2.27Machine hoursC$33.31C$75.62
Crawler cranes, lifting capacity 25 t1.30Machine hoursC$90.69C$117.90
Personnel: 1 person-hour/machine-hour1.30Machine hoursC$17.95C$23.34
Tractor units, load on the fifth wheel coupling up to 15 t0.02Machine hoursC$43.25C$0.87
Personnel: 1 person-hour/machine-hour0.02Machine hoursC$15.36C$0.31
Heavy-duty semi-trailers, load capacity up to 40 t0.02Machine hoursC$13.83C$0.28
Welding machines for manual arc welding, welding current up to 350 A13.92Machine hoursC$1.34C$18.64
Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min0.14Machine hoursC$15.54C$2.17
Personnel: 1 person-hour/machine-hour0.14Machine hoursC$13.36C$1.87
14KADX_KASA_KAKATO_KARIBolt placement: high-strength1.0
1 set(Gate)
pcsC$6.16C$7.79
C$6.16 +15% C$0.92 +10% C$0.71
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 10.16hrsC$34.65C$5.58
Technical gaseous oxygen0.06m3C$8.48C$0.51
Dry moisture-resistant gypsum-based putty mixtures with polymer and hydrophobic additives, aggregate size no more than KA.RI mm, flexural strength not less than ME.SA MPa0.01kgC$2.83C$0.04
Flatbed trucks, load capacity up to 5 tons0.00Machine hoursC$27.51C$0.01
Personnel: 1 person-hour/machine-hour0.00Machine hoursC$18.38C$0.01
Gas welding and cutting equipment0.06Machine hoursC$0.24C$0.01
Finishing 1 items C$286.79
#CodeDescriptionQtyUnitUnit PriceTotal
15NESA_KARI_KAKALI_KANE
Repair of gate valves with a diameter of: up to 200 mm with removal from the site
1.0
1 set(Finishing)
pcsC$226.71C$286.79
C$226.71 +15% C$34.01 +10% C$26.07
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 18.42hrsC$24.14C$203.36
PMB brand paronite sheet (PON-A, PON-B), thickness from KA.PU to 5 mm1.94kgC$5.71C$11.08
Grease, solid, fat-based, type Z0.14kgC$4.86C$0.69
Gland packings, AP grade0.06kgC$12.61C$0.80
Steel bolts with hexagonal heads, complete with hexagonal nuts and flat round washers, thread diameter M16, bolt length 25-200 mm0.00tC$7,162.85C$10.75
Flatbed trucks, load capacity up to 5 tons0.00Machine hoursC$27.51C$0.02
Personnel: 1 person-hour/machine-hour0.00Machine hoursC$14.24C$0.01
Cost Summary
Direct Cost79%C$49,106.11
Overhead+15%C$7,365.92
Profit+10%C$5,647.20
Grand TotalC$62,119.23

Resource Summary

68 resourcesiAggregated materials, labor, and equipment needed for the entire project
Materials to Order (40)
ResourceUnitQtyUnit PriceCost
Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mmt0.34C$30,330.59C$10,312.40
Welding electrodes for welding low-alloy and carbon steels UONI 13/45,kg53.10C$54.30C$2,883.57
Natural sand for construction works, class II, mediumm31.65C$927.78C$1,530.84
Planed softwood bars (pine, spruce), dimensions 50x50 mm, grade ABm30.03C$38,934.52C$981.15
Low-carbon galvanized steel wire for various purposes, diameter TO.KA t0.05C$18,125.60C$906.28
Forgings from square billets, weight ME.SA-PU.SA kgt0.01C$87,445.00C$874.45
Construction nailst0.00C$189,055.56C$340.30
Combined drying oil for interior finishing workst0.01C$18,808.00C$282.12
Tinned copper cable sleeves for crimping to connect wires and cables w100 pcs3.20C$87.50C$280.00
Bolts with nuts and washers for constructionkg3.76C$61.88C$232.66
Crushed stone from dense rock for construction work M 1000, fraction 2m30.34C$569.86C$196.60
Enamel HV-161t0.01C$32,682.00C$163.41
Oil paint MA-011-0, MA-011-1, MA-011-1N, MA-011-2, MA-011-2Nt0.01C$27,830.00C$139.15
I-beams with parallel flanges, steel grades St3sp, St3ps, No. 10B-18Bt0.02C$4,013.50C$80.27
Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 180t0.02C$2,369.00C$47.38
Auxiliary metal structures predominantly made of thick-gauge steel or t0.01C$6,155.56C$44.32
Polyethylene tapes with adhesive layer, transparent, width 20 mm, thickg0.78C$44.51C$34.72
Technical gaseous oxygenm32.19C$14.78C$32.44
Welding electrodes for welding low-alloy and carbon steels ANO-6, E42,t0.00C$48,366.67C$29.02
Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mt0.01C$2,525.00C$25.25
Installation of reinforced concrete fences made of panels with a lengtm17.00C$1.24C$21.11
Single solid ceramic brick, dimensions 250x120x65 mm, grade M1001000 pcs0.00C$7,000.00C$15.40
Edged softwood boards, natural moisture content, length RI-NE.SA m, wim30.02C$561.00C$11.22
PMB brand paronite sheet (PON-A, PON-B), thickness from KA.PU to 5 mmkg1.94C$5.71C$11.08
Steel bolts with hexagonal heads, complete with hexagonal nuts and flat0.00C$7,166.67C$10.75
Nylon cable ties, non-opening, TO.NE x 250 mm100 pcs1.69C$3.76C$6.35
Sanding paperm20.43C$11.65C$5.01
Heat-shrinkable polyethylene tubing, wall thickness ME-ME.SA mm, innerm1.60C$2.24C$3.59
ElectricitykWh10.35C$0.28C$2.92
BM polystyrene marking tags, dimensions 50x25 mm100 pcs0.53C$4.85C$2.57
Grand TotalC$19,514.86
Labor Requirements (4)
ResourceUnitQtyUnit PriceCost
Worker Category 1hrs518.99C$20.38C$10,575.62
Personnel: 1 person-hour/machine-hourMachine hours168.20C$14.48C$2,434.83
Average workload TO.KAhrs69.13C$23.19C$1,603.36
Personnel: 2 man-hours/machine-hourMachine hours2.27C$33.31C$75.62
Grand TotalC$14,689.43
Equipment Requirements (24)
ResourceUnitQtyUnit PriceCost
Machines for digging pits for contact network supports when working "fMachine hours41.58C$160.59C$6,677.28
Mobile cranes, lifting capacity 16 tMachine hours60.50C$68.13C$4,121.47
Crawler tractors, power 79 kW (108 hp)Machine hours38.52C$40.56C$1,562.35
Drilling and crane machines on a truck chassis, drilling diameter up tMachine hours4.98C$118.81C$591.93
Bulldozers, power 79 kW (108 hp)Machine hours10.26C$51.93C$532.78
Gantry cranes, lifting capacity 50 tMachine hours2.27C$224.08C$508.66
Special-purpose all-terrain vehicles, load capacity up to 8 tonsMachine hours5.27C$70.23C$370.10
Tower cranes, load capacity 50 tonsMachine hours1.30C$145.69C$189.40
Crawler cranes, lifting capacity 25 tMachine hours1.30C$90.69C$117.90
Concrete mixer trucks, drum capacity 6 m3Machine hours2.01C$46.09C$92.66
Flatbed trucks, load capacity up to 5 tonsMachine hours1.40C$26.75C$37.32
Tractor trailers, load capacity up to 2 tonsMachine hours38.52C$0.63C$24.20
Welding machines for manual arc welding, welding current up to 350 AMachine hours14.73C$1.35C$19.82
Welding units with internal combustion engines for manual arc welding,Machine hours3.85C$4.66C$17.96
Single-bucket diesel excavators on pneumatic wheels, bucket capacity KMachine hours0.30C$42.00C$12.71
Pneumatic-tired tractors, power 59 kW (80 hp)Machine hours0.44C$26.07C$11.45
Universal front-end pneumatic wheeled single-bucket loaders, nominal cMachine hours0.13C$71.23C$9.26
Mobile screw compressors with internal combustion engines, pressure upMachine hours0.14C$15.50C$2.17
Tractor units, load on the fifth wheel coupling up to 15 tMachine hours0.02C$43.50C$0.87
Hydraulic diggersMachine hours0.44C$1.50C$0.66
Grand TotalC$14,901.79

Material Alternatives

iAlternative materials with approximate price difference. Percentages show material cost change relative to the current specification.
Installation of prefabricated reinforced concrete non-sC$13,066.51
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Installation of single-post road signs on prefabricatedC$2,405.29
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Installation of metal posts over 4 m high: with immersiC$981.15
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Reinforcement of metal fence postsC$46.87
Galvanized rebar+35%Fiber reinforcement-15%Stainless steel rebar+110%
Installation of reinforced concrete fences made of paneC$21.11
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%

Risk Analysis

Monte Carlo · 10KiMonte Carlo simulation (10,000 iterations) showing completion probability at different confidence levels
81days
P50
50% probability the project finishes within this timeframe. Median scenario based on Monte Carlo simulation.
88days
P80
80% probability — recommended planning basis. Accounts for common delays and uncertainties.
95days
P95
95% probability — conservative estimate. Covers nearly all risk scenarios including severe delays.
+14days
Buffer
Recommended time buffer to add to the deterministic schedule. Covers typical construction uncertainties.
Base Cost (P50)
C$62,119.23
Budget (P80)
C$67,548.79
Maximum (P95)
C$72,752.11
Contingency
+8.7%
Recommended cost reserve based on schedule risk analysis — C$5,429.56
Recommended Budget: C$67,548.79
Deterministic 74 days
P50 81 days
P80 88 days
P95 95 days
P50 P80 P95
Based on Monte Carlo simulation with 10,000 iterations using PERT distribution for each phase duration.
Peak: 6
759 man-hours
4 crit. phases

Cost Risk Analysis

Monte Carlo · 10,000 iterations

Monte Carlo simulation of construction cost uncertainty

Cost Percentiles

C$76,431.57
P10
C$77,897.32
P25
C$79,675.21
P50
C$81,947.67
P80
C$83,076.66
P90

Cumulative Probability (S-Curve)

+2.9%
Recommended Contingency (P80 − P50)
Reserve to cover likely cost overruns with 80% confidence — C$2,272.45

Top Risk Drivers

CategoryWork ItemRisk Share
Posts & FoundationsInstallation of single non-separable supports with
51.0%
Panels & RailsInstallation of prefabricated reinforced concrete
40.4%
Posts & FoundationsInstallation of single-post road signs on prefabri
5.4%
Site PreparationInstallation of fences: wire multi-row
1.0%
GateSegmented gate (without support hinges): balanced
0.7%
Posts & FoundationsInstallation of metal posts over 4 m high: with im
0.5%
Panels & RailsReplacement of caps on chimneys for one channel
0.3%
GateInstallation of swing gates with posts: metal
0.3%

Sensitivity Analysis

±10%iImpact of ±10% change in each cost component on the total project cost

This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.

Decrease ← → IncreaseImpact
Materials31% of total
±C$1,951.49±3.1%
Equipment24% of total
±C$1,490.18±2.4%
Labor24% of total
±C$1,468.94±2.4%
Overhead12% of total
±C$736.59±1.2%
Profit9% of total
±C$564.72±0.9%

Cost Summary

iFinal cost breakdown with direct costs, overhead, profit, and grand total
LaborC$14,689.4324%
MaterialsC$19,514.8831%
EquipmentC$14,901.8024%
Direct CostC$49,106.11
OverheadC$7,365.9212%
ProfitC$5,647.209%
Grand TotalC$62,119.23100%
EUR equivalent€38.751,86
USD equivalent$44,661.52
GBP equivalent£33,812.16

Estimate Classification

AACE 18R-97

AACE International Recommended Practice 18R-97

3
ClassClass 3
Typical PurposeBudget Authorization
Expected Accuracy Range: -20% / +30%
Project Definition Level: 10–40%

Cost Benchmark

Office · North America

Comparison of estimated cost/m² against market reference ranges

Low
1,800
▲ Typical
2,500
High
3,800
▼ Your Estimate
791 EUR/m²
Significantly below range · 0.32x ratio to typical

Methodology & Assumptions

iCalculation methodology, data sources, and key assumptions underlying this estimate
Data SourceDDC Pricing DB — English
Confidence Level50%
Overhead Rate15%
Profit Rate10%
Items Matched15
Assumptions
  • Costs adjusted by location-specific labor, material, and equipment factors
  • Exchange rates are offline reference rates and may differ from market rates
  • All amounts exclude VAT / sales tax
  • This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
  • All labor, materials, and equipment per defined scope
  • Overhead and profit margins as specified
  • Location-adjusted pricing factors applied
Excluded from Estimate
  • VAT / sales tax
  • Permits, licenses, and legal fees
  • Temporary works and site facilities
  • Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied

Frequently Asked Questions

How much does Fence Construction cost?
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 17 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 17 work items covering Site Preparation, Posts & Foundations, Panels & Rails, Gate, Finishing. Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Fence Construction take?
Duration depends on project size and complexity. A typical 50 m length, 1.8 m high project takes approximately 2 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a fence construction include?
Cost estimate for installing 200 metres of perimeter fencing. Covers post foundations, steel or aluminum fence panels, gates (pedestrian and vehicular), post caps, anti-climb features, and painting or galvanizing finish. Suitable for residential, commercial, or institutional perimeter security.

Get a Personalized Estimate for Your Project

Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.

Calculate Cost for My Project →