18 m² (6×3m)28 work items5 sectionsToronto, Canada
About This Project
Cost estimate for building a 36 m² detached single-car garage. Includes concrete pad foundation, masonry or timber frame walls, sectional overhead door, personnel door, pitched roof with shingles, electrical supply and lighting, concrete floor slab, and exterior finish matching the main house.
Data Source:DDC Pricing DB — English·55,719 items·CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%
Cost Breakdown
iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$19,813.86Direct Cost
Labor (31%)C$7,817.74
Materials (30%)C$7,423.95
Equipment (18%)C$4,572.17
Overhead (12%)C$2,972.07
Profit (9%)C$2,278.60
Cost / m²
Labor
C$434.32
Materials
C$412.44
Equipment
C$254.01
Overhead
C$165.12
Profit
C$126.59
Grand Total
C$1,392.47
Materials / Labor
0.95
Direct Cost %
79.1%
18 work items across 17 categories, 74 resources
Cost Flow
17iVisual flow of the total budget through work categories, showing proportional cost distribution
Building type not detected; using 'office' template. Use --type to specify.
Categories
17iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
Category
Cost
Cost / m²
Share
HVAC
C$1,297.24
C$72.07
5.2%
Doors
C$330.72
C$18.37
1.3%
Facade
C$8,351.22
C$463.96
33.3%
Ceiling
C$1,807.81
C$100.43
7.2%
Roofing
C$110.68
C$6.15
0.4%
Windows
C$1,101.79
C$61.21
4.4%
Flooring
C$2,265.78
C$125.88
9.0%
Painting
C$370.59
C$20.59
1.5%
Plumbing
C$500.17
C$27.79
2.0%
Earthwork
C$4.28
C$0.24
0.0%
Structure
C$1,547.38
C$85.97
6.2%
Electrical
C$289.29
C$16.07
1.2%
Foundation
C$647.00
C$35.94
2.6%
Plastering
C$1,465.84
C$81.44
5.8%
Landscaping
C$179.70
C$9.98
0.7%
External Walls
C$2,451.87
C$136.22
9.8%
Internal Walls
C$2,343.13
C$130.17
9.3%
Top Items
Description
Total
Repair of plaster on external straight slopes on stone …
C$8,351.22
Masonry of external and internal brick walls with an ai…
C$2,451.87
Installation of partitions made of gypsum tongue-and-gr…
C$2,343.13
Installation of two-color cement mortar coatings made o…
C$2,265.78
Installation of a load-bearing suspended ceiling for cl…
C$1,807.81
What-If Scenarios
iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$22,558.08
↓ C$2,506.45 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$25,064.53
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$28,824.21
↑ C$3,759.68 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor0%
Materials0%
Equipment0%
Custom Scenario Total Cost
C$25,064.53
Clicking Apply will update PPP coefficients and recalculate all line items
Project Schedule
≈4 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
Construction PhasesAI
Site PreparationSite clearing, temporary facilities setup, utilities connection8d
MEP Finish WorkElectrical fixtures, plumbing fixtures, HVAC units and controls8d
Interior DoorsInterior door installation, hardware, access control systems8d
Flooring InstallationCarpet, tile, hardwood, and other finish flooring systems8d
Painting and Final FinishesInterior painting, final wall finishes, trim work8d
Final Systems and TestingSystem commissioning, testing, safety systems, elevators8d
Landscaping and Site WorkExterior landscaping, parking areas, site cleanup8d
Final Inspection and HandoverFinal inspections, punch list completion, project handover8d
4
months
126
days
19
phases
15
Critical Path
6
Peak workers
310
Labor Hours
Site PreparationEarthworkFoundation WorkStructural FrameworkRoofing SystemExternal EnvelopeWindows and External DoorsMEP Rough-inInternal Walls FramingInsulationDrywall and PlasteringCeiling SystemsMEP Finish WorkInterior DoorsFlooring InstallationPainting and Final FinishesFinal Systems and TestingLandscaping and Site WorkFinal Inspection and HandoverCumulative Cost
Labor Hours by Phase
External Envelope
129 hours
Internal Walls Frami
50 hours
Insulation
50 hours
MEP Finish Work
50 hours
Final Systems and Te
50 hours
Final Inspection and
50 hours
Flooring Installatio
43 hours
Structural Framework
35 hours
Site Preparation
30 hours
MEP Rough-in
28 hours
Ceiling Systems
14 hours
Drywall and Plasteri
11 hours
Painting and Final F
8 hours
Windows and External
5 hours
Foundation Work
4 hours
Interior Doors
2 hours
Landscaping and Site
1 hours
Roofing System
1 hours
Earthwork
0 hours
Monthly Cash Flow
4 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
26%
M1
75%
M2
89%
M3
100%
M4
Month
days
Monthly Cost
%
Cumulative
%
M1
1–30
C$6,515.52
26.0%
C$6,515.52
26%
M2
31–60
C$12,308.23
49.1%
C$18,823.75
75%
M3
61–90
C$3,604.37
14.4%
C$22,428.12
89%
M4
91–120
C$2,636.37
10.5%
C$25,064.49
100%
Daily Cash Flow
16 weeks
1%
D1
9%
D12
12%
D23
39%
D34
68%
D45
75%
D56
75%
D67
81%
D78
89%
D89
96%
D100
100%
D110
Week
days
Weekly Cost
%
Cumulative
%
W1
D1–D7
C$2,050.24
8.2%
C$2,050.24
8%
W2
D8–D14
C$296.10
1.2%
C$2,346.34
9%
W3
D15–D21
C$405.44
1.6%
C$2,751.78
11%
W4
D22–D28
C$2,242.25
8.9%
C$4,994.03
20%
W5
D29–D35
C$5,656.54
22.6%
C$10,650.57
42%
W6
D36–D42
C$4,505.62
18.0%
C$15,156.20
60%
W7
D43–D49
C$2,866.62
11.4%
C$18,022.82
72%
W8
D50–D56
C$800.93
3.2%
C$18,823.75
75%
W9
D57–D63
C$0.00
0.0%
C$18,823.75
75%
W10
D64–D70
C$0.00
0.0%
C$18,823.75
75%
W11
D71–D77
C$1,282.61
5.1%
C$20,106.36
80%
W12
D78–D84
C$1,787.13
7.1%
C$21,893.49
87%
W13
D85–D91
C$534.63
2.1%
C$22,428.12
89%
W14
D92–D98
C$1,132.89
4.5%
C$23,561.01
94%
W15
D99–D105
C$1,271.86
5.1%
C$24,832.87
99%
W16
D106–D110
C$231.62
0.9%
C$25,064.49
100%
Line Items
18 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
▼Earthwork1 itemsC$4.28
#
Code
Description
Qty
Unit
Unit Price
Total
1
KAME_KAME_KAMEKA_RIME
Excavation of soil into a dump using excavators, bucket capacity 1 (ME-ME.RI) m3, soil group:
2.7
18 m² × 0.15 = 2.7 m3(Earthwork)
m3
C$1.25
C$4.28
C$3.39 +15% C$0.51+10% C$0.39
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
0.02
hrs
C$7.56
C$0.15
Single-bucket diesel excavators on crawler tracks, bucket capacity ME.KA m3
0.04
Machine hours
C$69.30
C$2.96
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$6.63
C$0.28
▼Foundation1 itemsC$647.00
#
Code
Description
Qty
Unit
Unit Price
Total
2
KANE_KAME_KAKAME_KAVO
Construction of reinforced concrete foundations for general use under columns with a volume of: up to 25 m3
1.4
18 m² × 0.08 = 1.44 m3(Foundation)
m3
C$355.18
C$647.00
C$511.47 +15% C$76.72+10% C$58.82
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
3.38
hrs
C$22.53
C$76.23
Polyethylene film, thickness KA.MESA mm
0.77
m2
C$70.96
C$55.23
Construction nails
0.00
t
C$428,205.75
C$61.72
Quicklime, grade I
0.00
t
C$40,942.56
C$5.41
Hot-rolled wire in coils, diameter NE.TO-NE.SA mm
0.00
t
C$296,015.30
C$42.23
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III
0.00
m3
C$67,679.04
C$253.39
Tower cranes, lifting capacity 8 t
0.27
Machine hours
C$41.84
C$11.26
Personnel: 1 person-hour/machine-hour
0.27
Machine hours
C$18.08
C$4.86
Mobile cranes, lifting capacity 16 t
0.01
Machine hours
C$66.65
C$0.35
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$18.08
C$0.10
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.00
Machine hours
C$69.16
C$0.24
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$15.47
C$0.05
Deep vibrators
0.17
Machine hours
C$0.55
C$0.09
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$25.88
C$0.20
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$13.46
C$0.11
▼Structure2 itemsC$1,547.38
#
Code
Description
Qty
Unit
Unit Price
Total
3
KANE_KASA_KAKAME_KASA
Construction of reinforced concrete columns in wooden formwork with a height of: up to 4 m, perimeter up to 3 m
0.7
18 m² × 0.04 = 0.72 m3(Structure)
m3
C$643.08
C$585.72
C$463.01 +15% C$69.45+10% C$53.25
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
5.20
hrs
C$22.75
C$118.27
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm
1.08
kg
C$159.98
C$172.90
Construction nails
0.00
t
C$96,297.96
C$13.88
Quicklime, grade I
0.00
t
C$9,207.45
C$3.90
Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II
0.00
m3
C$18,406.32
C$18.51
Unedged softwood board, natural moisture content, length RI-NE.SA m, width 100-250, thickness 30-50 mm, grade II
0.01
m3
C$11,684.95
C$92.54
Tower cranes, lifting capacity 8 t
0.66
Machine hours
C$42.60
C$27.93
Personnel: 1 person-hour/machine-hour
0.66
Machine hours
C$17.82
C$11.68
Mobile cranes, lifting capacity 16 t
0.01
Machine hours
C$67.87
C$0.93
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$17.82
C$0.24
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.00
Machine hours
C$70.43
C$0.12
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$15.25
C$0.03
Deep vibrators
0.28
Machine hours
C$0.56
C$0.16
Flatbed trucks, load capacity up to 5 tons
0.02
Machine hours
C$26.36
C$0.55
Personnel: 1 person-hour/machine-hour
0.02
Machine hours
C$13.26
C$0.27
Welding machines for manual arc welding, welding current up to 350 A
0.76
Machine hours
C$1.47
C$1.11
4
KANE_MEDX_KAKAPU_KAME
Construction of reinforced concrete floors and slabs up to 200 mm thick in permanent formwork (concrete supplied in buck
1.1
18 m² × 0.06 = 1.08 m3(Structure)
m3
C$703.90
C$961.66
C$760.21 +15% C$114.03+10% C$87.42
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
9.00
hrs
C$23.00
C$216.04
Anthracene oil
0.00
t
C$33,398.53
C$64.80
Water
0.00
m3
C$54.44
C$0.28
Electricity
0.04
kWh
C$8.92
C$0.28
Polyethylene film, thickness KA.MESA mm
0.46
m2
C$18.30
C$8.38
Construction nails
0.00
t
C$110,454.86
C$12.01
Light wire, diameter ME.ME mm
0.00
t
C$112,502.96
C$24.30
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III
0.01
m3
C$21,112.26
C$282.67
Edged softwood board, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade III
0.00
m3
C$17,457.68
C$30.17
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III
0.01
m3
C$17,457.68
C$98.04
Tower cranes, lifting capacity 8 t
0.29
Machine hours
C$42.54
C$12.40
Personnel: 1 person-hour/machine-hour
0.29
Machine hours
C$19.02
C$5.55
Mobile cranes, lifting capacity 16 t
0.02
Machine hours
C$67.76
C$1.06
Personnel: 1 person-hour/machine-hour
0.02
Machine hours
C$19.02
C$0.30
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.03
Machine hours
C$70.32
C$2.02
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$16.28
C$0.46
Deep vibrators
0.44
Machine hours
C$0.56
C$0.25
Trucks, load capacity up to 8 tons
0.02
Machine hours
C$37.20
C$0.87
Personnel: 1 person-hour/machine-hour
0.02
Machine hours
C$14.16
C$0.33
▼External Walls1 itemsC$2,451.87
#
Code
Description
Qty
Unit
Unit Price
Total
5
KAVO_KARI_KAMESA_KARICON
Masonry of external and internal brick walls with an air gap: with a floor height of more than 4 m
3.4
18 m² × 0.19 = 3.42 m3(External Walls)
m3
C$566.74
C$2,451.87
C$1,938.24 +15% C$290.74+10% C$222.90
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
19.02
hrs
C$63.88
C$1,214.61
Water
0.85
m3
C$773.29
C$662.56
Tower cranes, lifting capacity 8 t
0.89
Machine hours
C$19.29
C$17.15
Personnel: 1 person-hour/machine-hour
0.89
Machine hours
C$49.38
C$43.92
▼Internal Walls1 itemsC$2,343.13
#
Code
Description
Qty
Unit
Unit Price
Total
6
KAVO_KAPU_KAKAME_RITO
Installation of partitions made of gypsum tongue-and-groove slabs: for floor heights over 4 m, in 2 layers 80 mm thick,
14.4
18 m² × 0.8 = 14.4 m2(Internal Walls)
m2
C$128.63
C$2,343.13
C$1,852.28 +15% C$277.84+10% C$213.01
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Grade 1 worker
5.25
hrs
C$20.29
C$106.53
2nd grade worker
12.64
hrs
C$22.12
C$279.62
Grade 4 worker
11.81
hrs
C$27.20
C$321.18
Grade 3 worker
0.09
hrs
C$24.15
C$2.16
Water
0.04
m3
C$55.39
C$2.27
Electricity
0.08
kWh
C$9.07
C$0.57
Plastic dowels with screws, diameter 10 mm, length 50-60 mm, screw diameter 6 mm, screw length 50-80 mm
0.05
100 pcs
C$951.62
C$45.18
Galvanized steel rack profile, dimensions 50x50 mm, thickness KA.NE mm
7.20
m
C$131.31
C$945.46
Hot-rolled reinforcing steel with periodic profile, class A-III, diameter 8 mm
0.00
t
C$78,874.93
C$113.67
Tower cranes, lifting capacity 8 t
0.33
Machine hours
C$42.65
C$14.06
Personnel: 1 person-hour/machine-hour
0.33
Machine hours
C$19.39
C$6.39
Mobile cranes, lifting capacity 16 t
0.11
Machine hours
C$67.93
C$7.73
Personnel: 1 person-hour/machine-hour
0.11
Machine hours
C$19.39
C$2.20
Flatbed trucks, load capacity up to 5 tons
0.13
Machine hours
C$26.38
C$3.39
Personnel: 1 person-hour/machine-hour
0.13
Machine hours
C$14.43
C$1.85
▼Roofing1 itemsC$110.68
#
Code
Description
Qty
Unit
Unit Price
Total
7
MERI_KAME_KAKARI_MERI
Installation of flat roofs from roll roofing waterproofing self-adhesive materials with anti-adhesion film: with heating
6.3
18 m² × 0.35 = 6.3 m2(Roofing)
m2
C$13.89
C$110.68
C$87.49 +15% C$13.12+10% C$10.06
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
0.56
hrs
C$24.33
C$13.55
Propane-butane technical mixture
0.13
kg
C$557.09
C$73.48
Mobile cranes, lifting capacity 16 t
0.00
Machine hours
C$68.68
C$0.21
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$19.05
C$0.06
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$12.60
C$0.03
Flatbed trucks, load capacity up to 5 tons
0.00
Machine hours
C$26.67
C$0.10
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$14.18
C$0.06
Gas injection burners
0.03
Machine hours
C$0.41
C$0.01
▼Windows1 itemsC$1,101.79
#
Code
Description
Qty
Unit
Unit Price
Total
8
MEKA_KAME_KATOPU_KAME
Installation of PVC profile window blocks in residential and public buildings: deaf with an opening area of up to 2 m2
2.7
18 m² × 0.15 = 2.7 m2(Windows)
m2
C$322.59
C$1,101.79
C$870.98 +15% C$130.65+10% C$100.16
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
4.52
hrs
C$25.69
C$116.09
Electricity
0.31
kWh
C$4.07
C$1.28
Waterproofing tapes, vapor-permeable butyl rubber, made of non-woven membrane-type material, with adhesive coating on the inner edges and anti-adhesive coating, beige color, width 80 mm
11.29
m
C$22.29
C$251.53
Pre-compressed self-expanding polyurethane foam sealing strips with adhesive layer on one side, width 10 mm, thickness when compressed 4 mm, thickness when expanded 20 mm
0.58
10 m
C$145.31
C$83.93
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
1.86
pcs
C$164.81
C$307.02
Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm
0.83
10 pcs
C$66.44
C$54.85
Plastic mounting wedges
0.22
100 pcs
C$239.61
C$51.79
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.05
Machine hours
C$2.53
C$0.12
Personnel: 1 person-hour/machine-hour
0.05
Machine hours
C$13.31
C$0.63
Flatbed trucks, load capacity up to 5 tons
0.09
Machine hours
C$27.40
C$2.43
Personnel: 1 person-hour/machine-hour
0.09
Machine hours
C$14.97
C$1.32
▼Doors1 itemsC$330.72
#
Code
Description
Qty
Unit
Unit Price
Total
9
MEKA_KAME_KAPURI_KARI
Filling balcony openings in wooden log walls with caulking door blocks with door leaves: paired, opening area over 3 m2
0.5
18 m² × 0.03 = 0.54 m2(Doors)
m2
C$484.14
C$330.72
C$261.44 +15% C$39.22+10% C$30.07
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
1.60
hrs
C$27.56
C$44.05
Water
0.00
m3
C$89.05
C$0.46
Electricity
0.04
kWh
C$14.58
C$0.46
Resin-impregnated tow
0.58
kg
C$273.27
C$158.07
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm
0.00
t
C$269,337.88
C$14.62
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III
0.00
m3
C$34,531.38
C$42.94
Flatbed trucks, load capacity up to 5 tons
0.02
Machine hours
C$26.06
C$0.54
Personnel: 1 person-hour/machine-hour
0.02
Machine hours
C$14.41
C$0.30
▼Flooring1 itemsC$2,265.78
#
Code
Description
Qty
Unit
Unit Price
Total
10
MEME_KAME_KASAVO_KARI
Installation of two-color cement mortar coatings made of ceramic tiles: stair landings
15.3
18 m² × 0.85 = 15.3 m2(Flooring)
m2
C$117.07
C$2,265.78
C$1,791.13 +15% C$268.67+10% C$205.98
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
42.75
hrs
C$26.60
C$1,137.23
Electricity
1.99
kWh
C$2.25
C$4.51
Colored cotton rags
0.08
kg
C$28.30
C$2.18
Ready-mixed masonry mortar, cement, M150
0.39
m3
C$1,641.34
C$640.38
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.04
Machine hours
C$72.10
C$2.86
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$17.18
C$0.69
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.04
Machine hours
C$2.49
C$0.10
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$13.28
C$0.53
Flatbed trucks, load capacity up to 5 tons
0.06
Machine hours
C$26.98
C$1.70
Personnel: 1 person-hour/machine-hour
0.06
Machine hours
C$14.95
C$0.94
▼Ceiling1 itemsC$1,807.81
#
Code
Description
Qty
Unit
Unit Price
Total
11
MESA_KAME_MEKATO_KAME
Installation of a load-bearing suspended ceiling for clean rooms, with panel dimensions of 1240x1240 mm
13.5
18 m² × 0.75 = 13.5 m2(Ceiling)
m2
C$105.86
C$1,807.81
C$1,429.09 +15% C$214.36+10% C$164.35
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Grade 1 worker
0.54
hrs
C$30.22
C$16.24
2nd grade worker
0.62
hrs
C$32.94
C$20.55
Grade 4 worker
4.05
hrs
C$40.51
C$164.14
Grade 5 worker
4.89
hrs
C$46.55
C$227.80
Grade 6 worker
3.95
hrs
C$54.40
C$214.75
Rectified technical ethyl alcohol, grade I
0.49
kg
C$60.02
C$29.16
Electricity
0.09
kWh
C$0.48
C$0.05
Butyl rubber waterproofing sealing tape, with adhesive layer on both sides, black, width 15 mm, thickness ME.SA mm
2.97
10 m
C$6.36
C$18.89
Stainless steel anchor screws with hexagonal head, diameter 6 mm, length 35 mm
Laying water supply pipelines using multilayer metal-poC$89.42
Copper pipe+120%PEX pipe-15%Stainless steel+200%
Risk Analysis
Monte Carlo · 10KiMonte Carlo simulation (10,000 iterations) showing completion probability at different confidence levels
136days
P50
50% probability the project finishes within this timeframe. Median scenario based on Monte Carlo simulation.
141days
P80
80% probability — recommended planning basis. Accounts for common delays and uncertainties.
145days
P95
95% probability — conservative estimate. Covers nearly all risk scenarios including severe delays.
+15days
Buffer
Recommended time buffer to add to the deterministic schedule. Covers typical construction uncertainties.
Base Cost (P50)
C$25,064.53
Budget (P80)
C$25,950.14
Maximum (P95)
C$26,798.86
Contingency
+3.5%
Recommended cost reserve based on schedule risk analysis — C$885.61 Recommended Budget: C$25,950.14
Deterministic 126 days
P50 136 days
P80 141 days
P95 145 days
P50 P80 P95
Based on Monte Carlo simulation with 10,000 iterations using PERT distribution for each phase duration.
Peak: 6
310 man-hours
15 crit. phases
Cost Risk Analysis
Monte Carlo · 10,000 iterations
Monte Carlo simulation of construction cost uncertainty
Cost Percentiles
C$31,172.84
P10
C$31,601.61
P25
C$32,132.91
P50
C$32,836.47
P80
C$33,199.00
P90
Cumulative Probability (S-Curve)
+2.2%
Recommended Contingency (P80 − P50)
Reserve to cover likely cost overruns with 80% confidence — C$703.55
Top Risk Drivers
Category
Work Item
Risk Share
Facade
Repair of plaster on external straight slopes on s
75.8%
External Walls
Masonry of external and internal brick walls with
5.9%
Internal Walls
Installation of partitions made of gypsum tongue-a
5.3%
HVAC
Installation of air ducts made of galvanized sheet
3.2%
Flooring
Installation of two-color cement mortar coatings m
3.0%
Ceiling
Installation of a load-bearing suspended ceiling f
1.9%
Plastering
Continuous leveling of interior surfaces (single-l
1.3%
Windows
Installation of PVC profile window blocks in resid
1.2%
Sensitivity Analysis
±10%iImpact of ±10% change in each cost component on the total project cost
This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.
Decrease ← → IncreaseImpact
Labor31% of total
±C$781.77±3.1%
Materials30% of total
±C$742.39±3.0%
Equipment18% of total
±C$457.22±1.8%
Overhead12% of total
±C$297.21±1.2%
Profit9% of total
±C$227.86±0.9%
Cost Summary
iFinal cost breakdown with direct costs, overhead, profit, and grand total
Labor
C$7,817.74
31%
Materials
C$7,423.95
30%
Equipment
C$4,572.17
18%
Direct Cost
C$19,813.86
Overhead
C$2,972.07
12%
Profit
C$2,278.60
9%
Grand Total
C$25,064.53
100%
EUR equivalent
€15.636,01
USD equivalent
$18,020.51
GBP equivalent
£13,642.89
Estimate Classification
AACE 18R-97
AACE International Recommended Practice 18R-97
3
ClassClass 3
Typical PurposeBudget Authorization
Expected Accuracy Range:-20% / +30%
Project Definition Level:10–40%
Cost Benchmark
Office · North America
Comparison of estimated cost/m² against market reference ranges
Low 1,800
▲ Typical 2,500
High 3,800
▼ Your Estimate 887 EUR/m²
Significantly below range · 0.35x ratio to typical
Methodology & Assumptions
iCalculation methodology, data sources, and key assumptions underlying this estimate
Data Source
DDC Pricing DB — English
Confidence Level
50%
Overhead Rate
15%
Profit Rate
10%
Items Matched
18
Assumptions
Costs adjusted by location-specific labor, material, and equipment factors
Exchange rates are offline reference rates and may differ from market rates
All amounts exclude VAT / sales tax
This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
All labor, materials, and equipment per defined scope
Overhead and profit margins as specified
Location-adjusted pricing factors applied
Excluded from Estimate
VAT / sales tax
Permits, licenses, and legal fees
Temporary works and site facilities
Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 28 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 28 work items covering Earthworks & Foundation, Walls & Structure, Roof, Openings & Finishes, Electrical. Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Garage Construction take?
Duration depends on project size and complexity. A typical 18 m² (6×3m) project takes approximately 4 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a garage construction include?
Cost estimate for building a 36 m² detached single-car garage. Includes concrete pad foundation, masonry or timber frame walls, sectional overhead door, personnel door, pitched roof with shingles, electrical supply and lighting, concrete floor slab, and exterior finish matching the main house.