Heating System Installation Cost Estimate — 120 m² house
120 m² house32 work items6 sectionsToronto, Canada
About This Project
Cost estimate for installing a complete heating system in a 150 m² house. Covers condensing gas boiler or heat pump, radiators or underfloor heating loops, copper or PEX piping, thermostatic radiator valves, room thermostat with programmer, hot water cylinder, expansion vessel, controls, and system commissioning.
Scope of Works
Demolition & Removal (4)Heat Source (7)Distribution (5)Heat Emitters (5)Controls & Hot Water (5)Commissioning (6)
Get a Personalized Estimate for Your Project
Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.
Data Source:DDC Pricing DB — English·55,719 items·CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%
Cost Breakdown
iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$85,373.90Direct Cost
Labor (25%)C$27,120.15
Materials (53%)C$57,395.64
Equipment (1%)C$858.11
Overhead (12%)C$12,806.10
Profit (9%)C$9,818.00
Cost / m²
Labor
C$226.00
Materials
C$478.30
Equipment
C$7.15
Overhead
C$106.72
Profit
C$81.82
Grand Total
C$899.98
Materials / Labor
2.12
Direct Cost %
79.1%
16 work items across 16 categories, 58 resources
Cost Flow
16iVisual flow of the total budget through work categories, showing proportional cost distribution
Categories
16iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
Category
Cost
Cost / m²
Share
Doors
C$2,204.78
C$18.37
2.0%
Heating
C$2,511.72
C$20.93
2.3%
Roofing
C$2,565.27
C$21.38
2.4%
Windows
C$5,876.23
C$48.97
5.4%
Bathroom
C$250.81
C$2.09
0.2%
Flooring
C$3,498.68
C$29.16
3.2%
Painting
C$5,592.54
C$46.60
5.2%
Plumbing
C$4,445.95
C$37.05
4.1%
Earthwork
C$211.34
C$1.76
0.2%
Structure
C$5,342.57
C$44.52
4.9%
Electrical
C$1,928.60
C$16.07
1.8%
Foundation
C$2,781.38
C$23.18
2.6%
Insulation
C$8,795.15
C$73.29
8.1%
Plastering
C$9,772.28
C$81.44
9.0%
External Walls
C$18,246.15
C$152.05
16.9%
Internal Walls
C$33,974.55
C$283.12
31.5%
Top Items
Description
Total
Limestone partition wall masonry: unreinforced with a f…
C$33,974.55
Masonry of external and internal brick walls with an ai…
C$18,246.15
Continuous leveling of interior surfaces (single-layer …
C$9,772.28
Insulation of interior walls on wood with spray guns us…
C$8,795.15
Installation of PVC profile window blocks in residentia…
C$5,876.23
What-If Scenarios
iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$97,198.20
↓ C$10,799.80 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$107,998.00
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$124,197.70
↑ C$16,199.70 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor0%
Materials0%
Equipment0%
Custom Scenario Total Cost
C$107,998.00
Clicking Apply will update PPP coefficients and recalculate all line items
Project Schedule
≈4 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
Construction PhasesAI
Site PreparationSite clearing, temporary facilities setup, access roads9d
MEP FinishFinal electrical, plumbing, and HVAC connections8d
Painting and FinishesInterior and exterior painting, final trim work15d
Final Cleanup and HandoverFinal cleaning, inspections, punch list completion8d
4
months
123
days
16
phases
12
Critical Path
6
Peak workers
896
Labor Hours
Site PreparationEarthworksFoundationStructural FrameworkRoofingExternal WallsWindows and Exterior DoorsMEP Rough-inInsulationDrywall and PlasteringInterior DoorsFlooringBathroom FixturesMEP FinishPainting and FinishesFinal Cleanup and HandoverCumulative Cost
Labor Hours by Phase
MEP Rough-in
224 hours
Structural Framework
203 hours
Painting and Finishe
146 hours
Site Preparation
80 hours
Drywall and Plasteri
71 hours
External Walls
50 hours
MEP Finish
50 hours
Final Cleanup and Ha
50 hours
Roofing
47 hours
Flooring
47 hours
Windows and Exterior
25 hours
Foundation
22 hours
Insulation
12 hours
Interior Doors
11 hours
Bathroom Fixtures
9 hours
Earthworks
0 hours
Monthly Cash Flow
4 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
40%
M1
71%
M2
95%
M3
100%
M4
Month
days
Monthly Cost
%
Cumulative
%
M1
1–30
C$42,864.45
39.7%
C$42,864.45
40%
M2
31–60
C$34,284.78
31.7%
C$77,149.23
71%
M3
61–90
C$25,193.53
23.3%
C$102,342.76
95%
M4
91–120
C$5,655.24
5.2%
C$107,998.00
100%
Daily Cash Flow
17 weeks
3%
D1
32%
D12
34%
D23
44%
D34
59%
D45
67%
D56
79%
D67
91%
D78
95%
D89
95%
D100
99%
D111
100%
D115
Week
days
Weekly Cost
%
Cumulative
%
W1
D1–D7
C$26,424.65
24.5%
C$26,424.65
24%
W2
D8–D14
C$7,681.99
7.1%
C$34,106.64
32%
W3
D15–D21
C$1,469.94
1.4%
C$35,576.58
33%
W4
D22–D28
C$4,928.00
4.6%
C$40,505.58
38%
W5
D29–D35
C$8,256.05
7.6%
C$48,761.63
45%
W6
D36–D42
C$10,187.85
9.4%
C$58,949.48
55%
W7
D43–D49
C$7,525.46
7.0%
C$66,474.94
62%
W8
D50–D56
C$6,190.74
5.7%
C$72,665.68
67%
W9
D57–D63
C$8,516.26
7.9%
C$81,181.94
75%
W10
D64–D70
C$7,940.04
7.4%
C$89,121.98
83%
W11
D71–D77
C$8,042.14
7.4%
C$97,164.12
90%
W12
D78–D84
C$4,990.53
4.6%
C$102,154.65
95%
W13
D85–D91
C$219.46
0.2%
C$102,374.11
95%
W14
D92–D98
C$31.35
0.0%
C$102,405.46
95%
W15
D99–D105
C$1,864.18
1.7%
C$104,269.64
97%
W16
D106–D112
C$2,609.85
2.4%
C$106,879.49
99%
W17
D113–D115
C$1,118.51
1.0%
C$107,998.00
100%
Line Items
16 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
▼Earthwork1 itemsC$211.34
#
Code
Description
Qty
Unit
Unit Price
Total
1
KAME_KAME_KAKAME_KATOCON
Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: 15 m3, soil group 3
14.4
120 m² × 0.12 = 14.4 m3(Earthwork)
m3
C$11.60
C$211.34
C$167.07 +15% C$25.06+10% C$19.21
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
0.03
hrs
C$41.20
C$1.35
Bulldozers, power 79 kW (108 hp)
0.03
Machine hours
C$50.27
C$1.70
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$30.04
C$1.01
Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3
0.03
Machine hours
C$4,704.51
C$159.20
Personnel: 3 man-hours/machine-hours
0.03
Machine hours
C$112.53
C$3.81
▼Foundation1 itemsC$2,781.38
#
Code
Description
Qty
Unit
Unit Price
Total
2
KANE_KAME_KAKAME_RIKA
Construction of strip foundations: concrete
7.2
120 m² × 0.06 = 7.2 m3(Foundation)
m3
C$305.38
C$2,781.38
C$2,198.71 +15% C$329.81+10% C$252.85
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
20.30
hrs
C$22.99
C$466.83
Water
0.02
m3
C$121.20
C$2.49
Electricity
0.13
kWh
C$19.85
C$2.49
Polyethylene film, thickness KA.MESA mm
6.35
m2
C$40.75
C$258.67
Construction nails
0.00
t
C$245,891.41
C$353.81
Quicklime, grade I
0.00
t
C$23,510.72
C$33.58
Hot-rolled wire in coils, diameter NE.TO-NE.SA mm
0.00
t
C$169,982.82
C$366.87
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III
0.02
m3
C$38,863.78
C$615.59
Tower cranes, lifting capacity 8 t
1.53
Machine hours
C$41.00
C$64.40
Personnel: 1 person-hour/machine-hour
1.53
Machine hours
C$18.23
C$27.95
Mobile cranes, lifting capacity 16 t
0.03
Machine hours
C$66.90
C$1.74
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$18.23
C$0.47
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.02
Machine hours
C$69.42
C$1.25
Personnel: 1 person-hour/machine-hour
0.02
Machine hours
C$15.60
C$0.28
Deep vibrators
1.02
Machine hours
C$0.56
C$0.57
Flatbed trucks, load capacity up to 5 tons
0.04
Machine hours
C$25.98
C$1.12
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$13.57
C$0.59
▼Structure1 itemsC$5,342.57
#
Code
Description
Qty
Unit
Unit Price
Total
3
KANE_MEDX_KAKAPU_KAME
Construction of reinforced concrete floors and slabs up to 200 mm thick in permanent formwork (concrete supplied in buck
6.0
120 m² × 0.05 = 6 m3(Structure)
m3
C$703.90
C$5,342.57
C$4,223.37 +15% C$633.51+10% C$485.69
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
50.02
hrs
C$23.00
C$1,200.21
Anthracene oil
0.01
t
C$33,389.04
C$360.50
Water
0.02
m3
C$54.43
C$0.84
Electricity
0.23
kWh
C$8.91
C$1.95
Polyethylene film, thickness KA.MESA mm
2.57
m2
C$18.30
C$47.19
Construction nails
0.00
t
C$110,423.48
C$66.18
Light wire, diameter ME.ME mm
0.00
t
C$112,471.00
C$134.87
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III
0.07
m3
C$21,106.26
C$1,570.44
Edged softwood board, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade III
0.01
m3
C$17,452.72
C$167.54
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III
0.03
m3
C$17,452.72
C$544.52
Tower cranes, lifting capacity 8 t
1.62
Machine hours
C$42.53
C$68.89
Personnel: 1 person-hour/machine-hour
1.62
Machine hours
C$19.02
C$30.82
Mobile cranes, lifting capacity 16 t
0.09
Machine hours
C$67.74
C$5.89
Personnel: 1 person-hour/machine-hour
0.09
Machine hours
C$19.02
C$1.65
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.16
Machine hours
C$70.30
C$11.22
Personnel: 1 person-hour/machine-hour
0.16
Machine hours
C$16.28
C$2.60
Deep vibrators
2.42
Machine hours
C$0.56
C$1.36
Trucks, load capacity up to 8 tons
0.13
Machine hours
C$37.19
C$4.84
Personnel: 1 person-hour/machine-hour
0.13
Machine hours
C$14.16
C$1.85
▼External Walls1 itemsC$18,246.15
#
Code
Description
Qty
Unit
Unit Price
Total
4
KAVO_KARI_KAMESA_KAMECON
Masonry of external and internal brick walls with an air gap: with a floor height of up to 4 m
25.2
120 m² × 0.21 = 25.2 m3(External Walls)
m3
C$572.37
C$18,246.15
C$14,423.83 +15% C$2,163.58+10% C$1,658.74
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
142.88
hrs
C$52.98
C$7,570.14
Water
6.30
m3
C$1,000.90
C$6,305.99
Tower cranes, lifting capacity 8 t
8.32
Machine hours
C$24.90
C$207.06
Personnel: 1 person-hour/machine-hour
8.32
Machine hours
C$40.96
C$340.64
▼Internal Walls1 itemsC$33,974.55
#
Code
Description
Qty
Unit
Unit Price
Total
5
KAVO_KATO_KAKATO_KALI
Limestone partition wall masonry: unreinforced with a floor height of up to 4 m
8.4
120 m² × 0.07 = 8.4 m3(Internal Walls)
m3
C$3,197.30
C$33,974.55
C$26,857.35 +15% C$4,028.60+10% C$3,088.60
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
77.70
hrs
C$23.08
C$1,793.30
Water
0.84
m3
C$98.58
C$82.94
Masonry mortar, cement-lime, M25
0.50
m3
C$11,041.96
C$5,565.29
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III
0.50
m3
C$38,227.09
C$19,266.60
Tower cranes, lifting capacity 8 t
2.44
Machine hours
C$42.26
C$102.94
Personnel: 1 person-hour/machine-hour
2.44
Machine hours
C$18.00
C$46.28
▼Roofing1 itemsC$2,565.27
#
Code
Description
Qty
Unit
Unit Price
Total
6
MERI_KAME_KAKALI_KASA
Installation of tile roofs: grooved stamped or pressed (ceramic and cement-sand (concrete))
48.0
120 m² × 0.4 = 48 m2(Roofing)
m2
C$42.25
C$2,565.27
C$2,027.89 +15% C$304.18+10% C$233.21
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
46.37
hrs
C$26.94
C$1,249.07
Steel roofing nails, diameter 2-3 mm, length 20-40 mm
Installation of PVC profile window blocks in residential and public buildings: deaf with an opening area of up to 2 m2
14.4
120 m² × 0.12 = 14.4 m2(Windows)
m2
C$322.59
C$5,876.23
C$4,645.24 +15% C$696.79+10% C$534.20
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
24.10
hrs
C$25.69
C$619.09
Electricity
1.65
kWh
C$4.07
C$6.76
Waterproofing tapes, vapor-permeable butyl rubber, made of non-woven membrane-type material, with adhesive coating on the inner edges and anti-adhesive coating, beige color, width 80 mm
60.19
m
C$22.29
C$1,341.47
Pre-compressed self-expanding polyurethane foam sealing strips with adhesive layer on one side, width 10 mm, thickness when compressed 4 mm, thickness when expanded 20 mm
3.08
10 m
C$145.29
C$447.80
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
9.94
pcs
C$164.79
C$1,637.37
Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm
4.41
10 pcs
C$66.43
C$292.71
Plastic mounting wedges
1.15
100 pcs
C$239.58
C$276.00
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.25
Machine hours
C$2.53
C$0.64
Personnel: 1 person-hour/machine-hour
0.25
Machine hours
C$13.31
C$3.38
Flatbed trucks, load capacity up to 5 tons
0.47
Machine hours
C$27.44
C$12.96
Personnel: 1 person-hour/machine-hour
0.47
Machine hours
C$14.97
C$7.07
▼Doors1 itemsC$2,204.78
#
Code
Description
Qty
Unit
Unit Price
Total
8
MEKA_KAME_KAPURI_KARI
Filling balcony openings in wooden log walls with caulking door blocks with door leaves: paired, opening area over 3 m2
3.6
120 m² × 0.03 = 3.6 m2(Doors)
m2
C$484.14
C$2,204.78
C$1,742.91 +15% C$261.44+10% C$200.43
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
10.66
hrs
C$27.56
C$293.69
Water
0.03
m3
C$89.16
C$2.29
Electricity
0.28
kWh
C$14.60
C$4.12
Resin-impregnated tow
3.85
kg
C$273.61
C$1,053.91
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm
0.00
t
C$269,674.27
C$96.97
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III
0.01
m3
C$34,574.51
C$286.35
Flatbed trucks, load capacity up to 5 tons
0.14
Machine hours
C$26.13
C$3.60
Personnel: 1 person-hour/machine-hour
0.14
Machine hours
C$14.41
C$1.98
▼Flooring1 itemsC$3,498.68
#
Code
Description
Qty
Unit
Unit Price
Total
9
SALI_KAME_KAMEME_KASA
Installation of bases for floor covering: from chipboard with an area of up to 20 m2
102.0
120 m² × 0.85 = 102 m2(Flooring)
m2
C$27.12
C$3,498.68
C$2,765.76 +15% C$414.86+10% C$318.06
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
46.98
hrs
C$23.24
C$1,092.06
Plywood boards type P1, standard unpolished, formaldehyde emission class E1, without facing, grade II, thickness 15-17 mm
1.04
100 m2
C$514.05
C$534.81
KN-2 rubber adhesive mastic
135.66
kg
C$8.36
C$1,134.11
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.10
Machine hours
C$2.36
C$0.24
Personnel: 1 person-hour/machine-hour
0.10
Machine hours
C$12.66
C$1.29
Flatbed trucks, load capacity up to 5 tons
0.08
Machine hours
C$25.63
C$2.09
Personnel: 1 person-hour/machine-hour
0.08
Machine hours
C$14.24
C$1.16
▼Bathroom1 itemsC$250.81
#
Code
Description
Qty
Unit
Unit Price
Total
10
NETO_KATO_KAKAME_KASA
Removing wall coverings: made of glazed ceramic tiles
12.0
120 m² × 0.1 = 12 m2(Bathroom)
m2
C$16.52
C$250.81
C$198.27 +15% C$29.74+10% C$22.80
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average work load RI.ME
8.92
hrs
C$22.01
C$196.20
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.04
Machine hours
C$2.37
C$0.10
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$12.64
C$0.53
Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 5 m3/min
0.20
Machine hours
C$7.04
C$1.38
Pneumatic jackhammers powered by mobile compressors
0.39
Machine hours
C$0.14
C$0.06
▼Plastering1 itemsC$9,772.28
#
Code
Description
Qty
Unit
Unit Price
Total
11
NEME_KAME_KAKAME_KADX
Continuous leveling of interior surfaces (single-layer plastering) with dry mortar mixtures up to 10 mm thick for subseq
192.0
120 m² × 1.6 = 192 m2(Plastering)
m2
C$40.23
C$9,772.28
C$7,725.12 +15% C$1,158.77+10% C$888.39
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average work load RI.DX
68.79
hrs
C$23.34
C$1,605.98
Water
0.98
m3
C$6,217.36
C$6,092.64
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.04
Machine hours
C$68.62
C$2.63
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$16.17
C$0.62
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.40
Machine hours
C$2.37
C$0.95
Personnel: 1 person-hour/machine-hour
0.40
Machine hours
C$12.50
C$5.04
Mobile mortar mixers, drum capacity 65 l
1.36
Machine hours
C$0.16
C$0.21
Personnel: 1 person-hour/machine-hour
1.36
Machine hours
C$12.50
C$17.04
▼Painting1 itemsC$5,592.54
#
Code
Description
Qty
Unit
Unit Price
Total
12
NERI_KAME_KAKALI_KANE
Improved oil painting of previously painted walls: for two coats with removal of old paint over 35%
192.0
120 m² × 1.6 = 192 m2(Painting)
m2
C$23.03
C$5,592.54
C$4,420.98 +15% C$663.15+10% C$508.41
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
145.32
hrs
C$28.78
C$4,182.99
Pumice
2.76
kg
C$48.72
C$134.69
Two-layer sanding paper with a grain size of 40-25
2.11
m2
C$10.33
C$21.81
Colored cotton rags
0.35
kg
C$1.21
C$0.42
Combined drying oil for diluting thick oil paints and for exterior work on wooden surfaces
0.02
t
C$1,013.14
C$19.45
Adhesive filler
0.10
t
C$549.02
C$52.70
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.19
Machine hours
C$2.81
C$0.54
Personnel: 1 person-hour/machine-hour
0.19
Machine hours
C$15.09
C$2.89
Flatbed trucks, load capacity up to 5 tons
0.12
Machine hours
C$30.51
C$3.52
Personnel: 1 person-hour/machine-hour
0.12
Machine hours
C$16.98
C$1.96
▼Electrical1 itemsC$1,928.60
#
Code
Description
Qty
Unit
Unit Price
Total
13
KAVO_KASA_KAPUME_KAMEm
Electrical wiring in chambers: cable or wire with band fasteners
360.0
120 m² × 3 = 360 m(Electrical)
m
C$4.23
C$1,928.60
C$1,524.58 +15% C$228.69+10% C$175.33
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
50.62
hrs
C$26.69
C$1,351.04
Electricity
3.46
kWh
C$0.30
C$1.02
Plastic mounting tapes for wire bundling, fastened with plastic buttons, width 10 mm
1.08
10 m
C$2.51
C$2.71
Polypropylene expansion anchors
3.67
100 pcs
C$2.18
C$8.02
Copper cable lugs for electrical installations
0.07
100 pcs
C$540.13
C$38.89
Mobile cranes, lifting capacity 16 t
0.90
Machine hours
C$65.71
C$59.14
Personnel: 1 person-hour/machine-hour
0.90
Machine hours
C$19.02
C$17.12
Non-tipping wagons, capacity TO.TO m3
1.12
Machine hours
C$0.83
C$0.92
Flatbed trucks, load capacity up to 10 tons
0.90
Machine hours
C$36.64
C$32.98
Personnel: 1 person-hour/machine-hour
0.90
Machine hours
C$14.16
C$12.74
▼Plumbing1 itemsC$4,445.95
#
Code
Description
Qty
Unit
Unit Price
Total
14
MENE_KATO_KAKARI_KARI
Laying water supply pipelines using multilayer metal-polymer pipes with a diameter of: 20 mm
96.0
120 m² × 0.8 = 96 m(Plumbing)
m
C$36.61
C$4,445.95
C$3,514.59 +15% C$527.19+10% C$404.18
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
98.88
hrs
C$27.31
C$2,700.72
Water
0.45
m3
C$114.76
C$51.81
Electricity
2.28
kWh
C$18.79
C$42.98
Corrugated protective pipes
10.56
m
C$66.28
C$700.04
Tower cranes, lifting capacity 8 t
0.04
Machine hours
C$41.70
C$1.60
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$19.18
C$0.74
Mobile cranes, lifting capacity 16 t
0.03
Machine hours
C$66.42
C$1.91
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$19.18
C$0.55
Flatbed trucks, load capacity up to 5 tons
0.36
Machine hours
C$25.80
C$9.16
Personnel: 1 person-hour/machine-hour
0.36
Machine hours
C$14.28
C$5.07
▼Heating1 itemsC$2,511.72
#
Code
Description
Qty
Unit
Unit Price
Total
15
MENE_KARI_KAKAME_KARI
Laying heating pipelines made of steel water and gas pipes, non-galvanized, with a diameter of: 20 mm
240.0
120 m² × 2 = 240 m(Heating)
m
C$8.27
C$2,511.72
C$1,985.55 +15% C$297.83+10% C$228.34
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
71.28
hrs
C$26.83
C$1,912.59
Technical gaseous oxygen
0.67
m3
C$6.61
C$4.44
Water
1.06
m3
C$1.82
C$1.92
Linen thread
0.14
kg
C$7.71
C$1.11
MA-0115 oil paint, mummy, iron minium
1.06
kg
C$5.14
C$5.43
Tower cranes, lifting capacity 8 t
0.19
Machine hours
C$41.47
C$7.97
Personnel: 1 person-hour/machine-hour
0.19
Machine hours
C$19.12
C$3.68
Mobile cranes, lifting capacity 16 t
0.17
Machine hours
C$66.06
C$11.10
Personnel: 1 person-hour/machine-hour
0.17
Machine hours
C$19.12
C$3.21
Flatbed trucks, load capacity up to 5 tons
0.84
Machine hours
C$25.66
C$21.55
Personnel: 1 person-hour/machine-hour
0.84
Machine hours
C$14.23
C$11.96
Gas welding and cutting equipment
2.76
Machine hours
C$0.22
C$0.61
▼Insulation1 itemsC$8,795.15
#
Code
Description
Qty
Unit
Unit Price
Total
16
RINE_KAME_KANETO_KAME
Insulation of interior walls on wood with spray guns using liquid thermal insulation coating 1 mm thick
66.0
120 m² × 0.55 = 66 m2(Insulation)
m2
C$105.34
C$8,795.15
C$6,952.68 +15% C$1,042.90+10% C$799.56
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
11.95
hrs
C$25.73
C$307.52
Water
0.01
m3
C$484.82
C$7.46
Electricity
4.91
kWh
C$79.40
C$390.52
Antiseptic for protecting wooden building structures from biological decay
0.01
t
C$946,453.66
C$6,245.86
Flatbed trucks, load capacity up to 5 tons
0.03
Machine hours
C$25.69
C$0.85
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$14.29
C$0.47
Cost Summary
Direct Cost
79%
C$85,373.90
Overhead
+15%
C$12,806.10
Profit
+10%
C$9,818.00
Grand Total
C$107,998.00
Resource Summary
58 resourcesiAggregated materials, labor, and equipment needed for the entire project
Insulation of interior walls on wood with spray gu
4.9%
Plastering
Continuous leveling of interior surfaces (single-l
3.3%
Plumbing
Laying water supply pipelines using multilayer met
2.1%
Windows
Installation of PVC profile window blocks in resid
1.9%
Structure
Construction of reinforced concrete floors and sla
1.4%
Painting
Improved oil painting of previously painted walls:
1.1%
Sensitivity Analysis
±10%iImpact of ±10% change in each cost component on the total project cost
This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.
Decrease ← → IncreaseImpact
Materials53% of total
±C$5,739.56±5.3%
Labor25% of total
±C$2,712.02±2.5%
Overhead12% of total
±C$1,280.61±1.2%
Profit9% of total
±C$981.80±0.9%
Equipment1% of total
±C$85.81±0.1%
Cost Summary
iFinal cost breakdown with direct costs, overhead, profit, and grand total
Labor
C$27,120.15
25%
Materials
C$57,395.64
53%
Equipment
C$858.11
1%
Direct Cost
C$85,373.90
Overhead
C$12,806.10
12%
Profit
C$9,818.00
9%
Grand Total
C$107,998.00
100%
EUR equivalent
€67.372,43
USD equivalent
$77,646.72
GBP equivalent
£58,784.46
Estimate Classification
AACE 18R-97
AACE International Recommended Practice 18R-97
3
ClassClass 3
Typical PurposeBudget Authorization
Expected Accuracy Range:-20% / +30%
Project Definition Level:10–40%
Cost Benchmark
Residential · North America
Comparison of estimated cost/m² against market reference ranges
Low 1,500
▲ Typical 2,200
High 3,500
▼ Your Estimate 573 EUR/m²
Significantly below range · 0.26x ratio to typical
Methodology & Assumptions
iCalculation methodology, data sources, and key assumptions underlying this estimate
Data Source
DDC Pricing DB — English
Confidence Level
50%
Overhead Rate
15%
Profit Rate
10%
Items Matched
16
Assumptions
Costs adjusted by location-specific labor, material, and equipment factors
Exchange rates are offline reference rates and may differ from market rates
All amounts exclude VAT / sales tax
This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
All labor, materials, and equipment per defined scope
Overhead and profit margins as specified
Location-adjusted pricing factors applied
Excluded from Estimate
VAT / sales tax
Permits, licenses, and legal fees
Temporary works and site facilities
Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 32 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 32 work items covering Demolition & Removal, Heat Source, Distribution, Heat Emitters, Controls & Hot Water, Commissioning. Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Heating System Installation take?
Duration depends on project size and complexity. A typical 120 m² house project takes approximately 5 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a heating system installation include?
Cost estimate for installing a complete heating system in a 150 m² house. Covers condensing gas boiler or heat pump, radiators or underfloor heating loops, copper or PEX piping, thermostatic radiator valves, room thermostat with programmer, hot water cylinder, expansion vessel, controls, and system commissioning.