Commercial · C04

Small Warehouse Construction Cost Estimate — 500 m² warehouse + 50 m² office

500 m² warehouse + 50 m² office 45 work items 8 sections Toronto, Canada

About This Project

Full construction estimate for a 500 m² small warehouse or distribution facility. Covers site preparation, concrete slab-on-grade foundation, steel frame structure, insulated metal panel cladding, loading dock, industrial electrical and lighting, fire sprinkler system, and site works including parking and drainage.

Scope of Works

Site & Earthworks (4)Foundations (6)Steel Structure (5)Envelope (7)Openings (4)Office Area (50 m²) (5)MEP (9)External Works (5)

Get a Personalized Estimate for Your Project

Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.

Calculate Cost for My Project →
Full Professional Estimate
0 items changed

Overview

iKey project metrics at a glance — total cost per m², labor and material shares, and estimated duration
Source: Text Query
C$1,002.42
Cost / m²
23.7%
Labor
51.7%
Materials
274 days
Est. Duration

Work Items

36 items iAdjust quantities or remove items, then recalculate. Click item name to jump to details.
Device for: vibration tablet compaction600pcsC$22,728.73
Corner steel shelf bracket1tC$2,842.17
Pontoon painting90m2C$8,854.91
Assembly: toilet1pcsC$91.18

Project Context

iInput parameters, location adjustment factors, and detection confidence for this estimate
Source
Office
500 m² · 36 items
SourceText Query
Work Items36 items · 8 Categories
CurrencyC$ CAD
LanguageEnglish
Date05 Apr 2026
Small Warehouse Construction 500 m² warehouse + 50 m² office Toronto Canada
Cost / m²
C$1,002.42
500 m²
Est. Duration
9 months
274 days
Overhead
15%
C$291,304.76
Direct Costs
387%
C$1,942,031.72
Location
Toronto, Canada
Americas
×1.07
Estimate Overview
C$501,210.21
C$1,002.42 / m² · 9 months (274 days)
Labor 24% Materials 52% Equipment 4% Overhead 58% Profit 45%
Contingency (P80)
+8%
C$42,101.66
Budget (P80)
C$543,311.87
recommended
Resources
134
82 mat · 11 lab · 41 equ
Overhead + Profit
58% + 45%
C$514,638.38
Pricing Methodology
Data Source: DDC Pricing DB — English · 55,719 items · CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%

Cost Breakdown

iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$1,942,031.72Direct Cost
Labor (24%)C$118,986.82
Materials (52%)C$259,060.09
Equipment (4%)C$18,166.69
Overhead (58%)C$291,304.76
Profit (45%)C$223,333.62
Cost / m²
LaborC$237.97
MaterialsC$518.12
EquipmentC$36.33
OverheadC$582.61
ProfitC$446.67
Grand TotalC$1,002.42
Materials / Labor
2.18
Direct Cost %
387.5%
36 work items across 8 categories, 134 resources

Cost Flow

8iVisual flow of the total budget through work categories, showing proportional cost distribution
Total CostC$501,210.21MEP: C$23,012.42 (4.6%)Envelope: C$548,906.43 (109.5%)Openings: C$5,294.50 (1.1%)Foundations: C$1,438,395.83 (287.0%)External Works: C$177,985.46 (35.5%)Steel Structure: C$211,308.07 (42.2%)Site & Earthworks: C$29,847.91 (6.0%)Office Area (50 m²): C$21,919.52 (4.4%)MEP4.6%Envelope109.5%Openings1.1%Foundations287.0%External Works35.5%Steel Structure42.2%Site & Earthworks6.0%Office Area (50 m²)4.4%
  • Complete BOQ: 45 work items for Small Warehouse Construction
  • 4 work item(s) not found in pricing DB for language 'en'.

Categories

8iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
CategoryCostCost / m²Share
MEPC$23,012.42C$46.024.6%
EnvelopeC$548,906.43C$1,097.81109.5%
OpeningsC$5,294.50C$10.591.1%
FoundationsC$1,438,395.83C$2,876.79287.0%
External WorksC$177,985.46C$355.9735.5%
Steel StructureC$211,308.07C$422.6242.2%
Site & EarthworksC$29,847.91C$59.706.0%
Office Area (50 m²)C$21,919.52C$43.844.4%

Top Items

DescriptionTotal
Wall cladding: architectural concrete panels on an alum…C$178,025.45
Installation of prefabricated reinforced concrete slabs…C$135,977.20
Installation of metal fences on reinforced concrete pos…C$41,019.36
Device for: vibration tablet compactionC$22,728.73
Installation of wooden supports in marshy ground: corne…C$16,802.09

What-If Scenarios

iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$451,089.19
↓ C$50,121.02 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$501,210.21
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$576,391.74
↑ C$75,181.53 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor 0%
Materials 0%
Equipment 0%
Custom Scenario Total Cost
C$501,210.21

Project Schedule

≈9 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
Construction PhasesAI
Site PreparationSite clearing, temporary facilities setup, utilities connection65d
EarthworkExcavation, grading, soil compaction, utility trenching8d
Foundation WorkConcrete footings, foundation walls, basement slab, waterproofing42d
Structural FrameworkSteel frame erection, concrete floors, structural connections39d
Roofing SystemRoof deck, membrane, insulation, drainage systems8d
External EnvelopeExterior walls, facade systems, building envelope sealing8d
Windows and External DoorsWindow installation, external door systems, glazing8d
MEP Rough-inElectrical conduits, plumbing rough-in, HVAC ductwork installation8d
Internal Walls FramingInterior partition framing, door frames, wall preparation8d
InsulationThermal and acoustic insulation, vapor barriers8d
Drywall and PlasteringDrywall installation, plastering, wall finishing preparation8d
Ceiling SystemsSuspended ceilings, ceiling tiles, lighting fixtures preparation8d
MEP Finish WorkElectrical fixtures, plumbing fixtures, HVAC units and controls40d
Interior DoorsInterior door installation, hardware, access control systems8d
Flooring InstallationCarpet, tile, hardwood, and other finish flooring systems8d
Painting and Final FinishesInterior painting, final wall finishes, trim work8d
Final Systems and TestingSystem commissioning, testing, safety systems, elevators8d
Landscaping and Site WorkExterior landscaping, parking areas, site cleanup8d
Final Inspection and HandoverFinal inspections, punch list completion, project handover8d
9
months
274
days
19
phases
15
Critical Path
13
Peak workers
4,464
Labor Hours
M1 M2 M3 M4 M5 M6 M7 M8 M9 Crew/Float Site Preparation Site Preparation: 65d, Crew 3, Float 0d 65d 3 / - Earthwork Earthwork: 8d, Crew 2, Float 0d 2 / - Foundation Work Foundation Work: 42d, Crew 2, Float 0d 42d 2 / - Structural Framework Structural Framework: 39d, Crew 11, Float 0d 39d 11 / - Roofing System Roofing System: 8d, Crew 2, Float 112d 2 / 112d External Envelope External Envelope: 8d, Crew 2, Float 0d 2 / - Windows and External … Windows and External Doors: 8d, Crew 2, Float 0d 2 / - MEP Rough-in MEP Rough-in: 8d, Crew 2, Float 32d 2 / 32d Internal Walls Framing Internal Walls Framing: 8d, Crew 2, Float 0d 2 / - Insulation Insulation: 8d, Crew 2, Float 0d 2 / - Drywall and Plastering Drywall and Plastering: 8d, Crew 2, Float 0d 2 / - Ceiling Systems Ceiling Systems: 8d, Crew 2, Float 0d 2 / - MEP Finish Work MEP Finish Work: 40d, Crew 3, Float 0d 40d 3 / - Interior Doors Interior Doors: 8d, Crew 2, Float 40d 2 / 40d Flooring Installation Flooring Installation: 8d, Crew 2, Float 0d 2 / - Painting and Final Fi… Painting and Final Finishes: 8d, Crew 2, Float 0d 2 / - Final Systems and Tes… Final Systems and Testing: 8d, Crew 2, Float 0d 2 / - Landscaping and Site … Landscaping and Site Work: 8d, Crew 2, Float 96d 2 / 96d Final Inspection and … Final Inspection and Handover: 8d, Crew 2, Float 0d 2 / - Workers 501K 50% (132d)
Site PreparationEarthworkFoundation WorkStructural FrameworkRoofing SystemExternal EnvelopeWindows and External DoorsMEP Rough-inInternal Walls FramingInsulationDrywall and PlasteringCeiling SystemsMEP Finish WorkInterior DoorsFlooring InstallationPainting and Final FinishesFinal Systems and TestingLandscaping and Site WorkFinal Inspection and HandoverCumulative Cost
Labor Hours by Phase
Structural Framework
2,276 hours
Site Preparation
1,033 hours
MEP Finish Work
633 hours
Foundation Work
447 hours
Flooring Installatio
63 hours
Earthwork
50 hours
External Envelope
50 hours
Windows and External
50 hours
MEP Rough-in
50 hours
Internal Walls Frami
50 hours
Insulation
50 hours
Drywall and Plasteri
50 hours
Ceiling Systems
50 hours
Interior Doors
50 hours
Painting and Final F
50 hours
Final Systems and Te
50 hours
Landscaping and Site
50 hours
Final Inspection and
50 hours
Roofing System
13 hours

Monthly Cash Flow

9 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
5%
M1
9%
M2
12%
M3
25%
M4
86%
M5
95%
M6
96%
M7
99%
M8
100%
M9
MonthdaysMonthly Cost%Cumulative%
M11–30C$22,947.884.6%C$22,947.885%
M231–60C$22,947.884.6%C$45,895.759%
M361–90C$14,034.472.8%C$59,930.2212%
M491–120C$66,159.8113.2%C$126,090.0325%
M5121–150C$306,872.1961.2%C$432,962.2286%
M6151–180C$42,670.538.5%C$475,632.7595%
M7181–210C$4,099.270.8%C$479,732.0296%
M8211–240C$15,372.283.1%C$495,104.3099%
M9241–270C$6,105.911.2%C$501,210.21100%

Daily Cash Flow

36 weeks
0%
D1
4%
D25
7%
D49
10%
D73
13%
D97
27%
D121
76%
D145
95%
D169
95%
D193
96%
D217
99%
D241
100%
D249
WeekdaysWeekly Cost%Cumulative%
W1D1–D7C$5,354.501.1%C$5,354.501%
W2D8–D14C$5,354.501.1%C$10,709.012%
W3D15–D21C$5,354.501.1%C$16,063.513%
W4D22–D28C$5,354.501.1%C$21,418.024%
W5D29–D35C$5,354.501.1%C$26,772.525%
W6D36–D42C$5,354.501.1%C$32,127.036%
W7D43–D49C$5,354.501.1%C$37,481.537%
W8D50–D56C$5,354.501.1%C$42,836.049%
W9D57–D63C$5,354.501.1%C$48,190.5410%
W10D64–D70C$1,529.860.3%C$49,720.4010%
W11D71–D77C$2,402.310.5%C$52,122.7110%
W12D78–D84C$4,204.040.8%C$56,326.7511%
W13D85–D91C$4,204.040.8%C$60,530.8012%
W14D92–D98C$4,204.040.8%C$64,734.8413%
W15D99–D105C$4,204.040.8%C$68,938.8814%
W16D106–D112C$4,204.040.8%C$73,142.9315%
W17D113–D119C$42,718.038.5%C$115,860.9523%
W18D120–D126C$71,603.5114.3%C$187,464.4637%
W19D127–D133C$71,603.5114.3%C$259,067.9852%
W20D134–D140C$71,603.5114.3%C$330,671.4966%
W21D141–D147C$71,603.5114.3%C$402,274.0080%
W22D148–D154C$71,603.5114.3%C$473,878.5195%
W23D155–D161C$1,534.960.3%C$475,413.4795%
W24D162–D168C$219.280.0%C$475,632.7595%
W25D169–D175C$0.000.0%C$475,632.7595%
W26D176–D182C$0.000.0%C$475,632.7595%
W27D183–D189C$0.000.0%C$475,632.7595%
W28D190–D196C$0.000.0%C$475,632.7595%
W29D197–D203C$512.410.1%C$476,145.1695%
W30D204–D210C$3,586.860.7%C$479,732.0296%
W31D211–D217C$3,586.860.7%C$483,318.8996%
W32D218–D224C$3,586.860.7%C$486,905.7597%
W33D225–D231C$3,586.860.7%C$490,492.6298%
W34D232–D238C$3,586.860.7%C$494,079.4899%
W35D239–D245C$3,955.050.8%C$498,034.5399%
W36D246–D250C$3,175.680.6%C$501,210.21100%

Line Items

36 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
Site & Earthworks 4 items C$29,847.91
#CodeDescriptionQtyUnitUnit PriceTotal
1KAME_KARI_KAVOLI_KAPU
Snow removal from construction sites and roads: bulldozers with movements at a distance of every subsequent 10 m
700.0
700 m²(Site & Earthworks)
m3C$0.04C$31.27
C$24.72 +15% C$3.71 +10% C$2.84
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Bulldozers, power 79 kW (108 hp)0.48Machine hoursC$37.94C$18.06
Personnel: 1 person-hour/machine-hour0.48Machine hoursC$13.99C$6.66
2KAVO_KAME_KANEDX_KARIm
Assembled busbar - two strips in phase, copper or aluminum with a cross-section: over 250 to 500 mm2
140.0
140 m³(Site & Earthworks)
mC$28.14C$4,984.13
C$3,940.03 +15% C$591.00 +10% C$453.10
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1134.12hrsC$25.20C$3,379.21
Gaseous argon, grade I1.43m3C$11.91C$17.00
Bolts with nuts and washers for construction18.62kgC$8.06C$150.17
MA-0115 oil paint, mummy, iron minium4.10kgC$4.83C$19.80
Mobile cranes, lifting capacity 16 t0.88Machine hoursC$62.03C$54.71
Personnel: 1 person-hour/machine-hour0.88Machine hoursC$17.95C$15.84
Flatbed trucks, load capacity up to 5 tons0.88Machine hoursC$24.09C$21.25
Personnel: 1 person-hour/machine-hour0.88Machine hoursC$13.36C$11.79
Welding machines for manual arc welding, welding current up to 350 A5.12Machine hoursC$1.34C$6.86
Drilling machines3.18Machine hoursC$1.19C$3.79
Universal hydraulic pipe benders17.64Machine hoursC$1.35C$23.88
Personnel: 1 person-hour/machine-hour17.64Machine hoursC$13.36C$235.72
3MEME_KAME_KAPUPU_KARI
Cutting joints in concrete: with joint filling using sealant when installing polymer self-leveling floors
200.0
200 m³(Site & Earthworks)
mC$8.32C$2,103.78
C$1,663.07 +15% C$249.46 +10% C$191.25
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 119.42hrsC$21.86C$424.46
Drying paste-like sealant-adhesive based on organic solvents for sealing radio equipment, fastening radio components, harnesses, wires, operating temperature range from -70 to +85 °C6.70kgC$83.84C$561.76
Concrete paving machines on rail forms Joint cutters for freshly laid cement concrete5.60Machine hoursC$102.74C$575.34
Personnel: 1 person-hour/machine-hour5.60Machine hoursC$17.99C$100.76
Flatbed trucks, load capacity up to 5 tons0.02Machine hoursC$24.14C$0.48
Personnel: 1 person-hour/machine-hour0.02Machine hoursC$13.39C$0.27
4TOPU_KARI_KAKAVO_SATOmDevice for: vibration tablet compaction600.0
600 m²(Site & Earthworks)
pcsC$29.95C$22,728.73
C$17,967.38 +15% C$2,695.11 +10% C$2,066.25
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1618.00hrsC$27.76C$17,156.72
Mobile cranes, lifting capacity 16 t6.00Machine hoursC$65.89C$395.37
Personnel: 1 person-hour/machine-hour6.00Machine hoursC$18.94C$113.65
Trucks, load capacity up to 8 tons6.00Machine hoursC$36.18C$217.05
Personnel: 1 person-hour/machine-hour6.00Machine hoursC$14.10C$84.59
Foundations 4 items C$37,008.99
#CodeDescriptionQtyUnitUnit PriceTotal
5KALI_KASA_KAKAPU_KAVO
Installation of columns with steel cores on foundations and lower columns with a mass of: over 3 to 4 tons
20.0
20 m³(Foundations)
pcsC$332.89C$8,422.17
C$6,657.84 +15% C$998.68 +10% C$765.65
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1177.40hrsC$25.33C$4,493.08
Welding electrodes for welding low-alloy and carbon steels ANO-6, E42, diameter 6 mm0.10tC$5,426.02C$542.60
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade II0.17m3C$555.73C$96.70
Tower cranes, lifting capacity 8 t26.40Machine hoursC$38.58C$1,018.55
Personnel: 1 person-hour/machine-hour26.40Machine hoursC$17.79C$469.63
Flatbed trucks, load capacity up to 5 tons0.47Machine hoursC$23.87C$11.17
Personnel: 1 person-hour/machine-hour0.47Machine hoursC$13.24C$6.20
Welding machines for manual arc welding, welding current up to 350 A15.00Machine hoursC$1.33C$19.91
6TOPU_KARI_KARINE_KAPU
Installation of wooden supports in marshy ground: corner with two supports and beams
12.0
12 m³(Foundations)
pcsC$1,106.86C$16,802.09
C$13,282.28 +15% C$1,992.34 +10% C$1,527.46
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1231.60hrsC$39.25C$9,089.31
Bolts with nuts and washers for construction134.40kgC$4.98C$668.68
Colored cotton rags0.12kgC$2.17C$0.26
Dead ends0.12100 pcsC$8.73C$1.05
U-1 slope fastening unit48.00pcsC$49.30C$2,366.36
Bulldozers, power 59 kW (80 hp)10.80Machine hoursC$80.10C$865.09
Personnel: 1 person-hour/machine-hour10.80Machine hoursC$26.30C$284.02
Manual and lever winches with a pulling force of up to DX.VOME kN (1 t)57.84Machine hoursC$0.13C$7.51
7RIDX_KARI_KAPUNE_KASAReinforcement of monolithic reinforced concrete columns2.5
2500 kg(Foundations)
tC$3,327.26C$10,522.46
C$8,318.16 +15% C$1,247.72 +10% C$956.59
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 189.17hrsC$26.32C$2,347.32
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm1.50kgC$372.29C$558.17
Low-carbon steel knitting wire0.03tC$213,536.72C$5,338.61
Mobile cranes, lifting capacity 16 t0.35Machine hoursC$66.70C$23.35
Personnel: 1 person-hour/machine-hour0.35Machine hoursC$19.20C$6.71
Flatbed trucks, load capacity up to 10 tons0.47Machine hoursC$37.19C$17.67
Personnel: 1 person-hour/machine-hour0.47Machine hoursC$14.29C$6.79
Welding machines for manual arc welding, welding current up to 350 A0.07Machine hoursC$1.44C$0.10
Crank-type guillotine sheet metal shears1.95Machine hoursC$8.77C$17.09
Rebar bending machines1.93Machine hoursC$1.22C$2.35
8MEME_KAME_KAPUPU_KARI
Cutting joints in concrete: with joint filling using sealant when installing polymer self-leveling floors
120.0
120 m(Foundations)
mC$8.32C$1,262.27
C$997.84 +15% C$149.68 +10% C$114.75
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 111.65hrsC$21.86C$254.67
Drying paste-like sealant-adhesive based on organic solvents for sealing radio equipment, fastening radio components, harnesses, wires, operating temperature range from -70 to +85 °C4.02kgC$83.85C$337.06
Concrete paving machines on rail forms Joint cutters for freshly laid cement concrete3.36Machine hoursC$102.74C$345.20
Personnel: 1 person-hour/machine-hour3.36Machine hoursC$17.99C$60.46
Flatbed trucks, load capacity up to 5 tons0.01Machine hoursC$24.14C$0.29
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$13.39C$0.16
Steel Structure 3 items C$5,607.14
#CodeDescriptionQtyUnitUnit PriceTotal
9KAVO_KARI_MESARI_KAMEmCorner steel shelf bracket1.0
1 t(Steel Structure)
tC$2,246.77C$2,842.17
C$2,246.77 +15% C$337.02 +10% C$258.38
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 180.80hrsC$26.26C$2,121.60
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm2.99kgC$6.14C$18.34
Portland cement without additives for general construction CEM 0 32.5N0.01tC$339.73C$3.40
BT-123 bitumen varnish0.01tC$4,695.75C$46.96
Mobile cranes, lifting capacity 16 t0.20Machine hoursC$66.16C$13.23
Personnel: 1 person-hour/machine-hour0.20Machine hoursC$19.15C$3.83
Flatbed trucks, load capacity up to 5 tons0.20Machine hoursC$25.69C$5.14
Personnel: 1 person-hour/machine-hour0.20Machine hoursC$14.25C$2.85
Welding machines for manual arc welding, welding current up to 350 A22.00Machine hoursC$1.43C$31.42
10KADX_KASA_KAKATO_KARIBolt placement: high-strength1.0
1 set(Steel Structure)
pcsC$6.16C$7.79
C$6.16 +15% C$0.92 +10% C$0.71
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 10.16hrsC$34.65C$5.58
Technical gaseous oxygen0.06m3C$8.48C$0.51
Dry moisture-resistant gypsum-based putty mixtures with polymer and hydrophobic additives, aggregate size no more than KA.RI mm, flexural strength not less than ME.SA MPa0.01kgC$2.83C$0.04
Flatbed trucks, load capacity up to 5 tons0.00Machine hoursC$27.51C$0.01
Personnel: 1 person-hour/machine-hour0.00Machine hoursC$18.38C$0.01
Gas welding and cutting equipment0.06Machine hoursC$0.24C$0.01
11TODX_KAME_KAMESA_KASA
Installation of anchor rods in a closed water area when supplying structural elements: from the shore using a crawler cr
3.0
3 days(Steel Structure)
tC$726.53C$2,757.18
C$2,179.59 +15% C$326.94 +10% C$250.65
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 156.10hrsC$24.43C$1,370.54
Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V0.06tC$1,139.16C$68.35
Grease, solid, fat-based, type Z3.00kgC$4.63C$13.90
Acetylene gas, technical grade0.12m3C$23.62C$2.84
Technical gaseous oxygen0.54m3C$6.31C$3.41
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm3.00kgC$5.84C$17.53
Burlap fabric, width 950 mm, surface density 190 g/m23.5410 mC$37.74C$133.62
Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm0.03tC$1,968.83C$59.07
Coal tar for road construction0.06tC$262.09C$15.72
Crawler cranes, lifting capacity 25 t4.02Machine hoursC$92.09C$370.20
Personnel: 1 person-hour/machine-hour4.02Machine hoursC$18.23C$73.28
Pneumatic wheeled cranes, lifting capacity 30 t0.21Machine hoursC$79.61C$16.72
Personnel: 1 person-hour/machine-hour0.21Machine hoursC$19.45C$4.08
Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l1.35Machine hoursC$5.45C$7.36
Flatbed trucks, load capacity up to 5 tons0.06Machine hoursC$24.46C$1.47
Personnel: 1 person-hour/machine-hour0.06Machine hoursC$13.57C$0.82
Tractor units, load on the fifth wheel coupling up to 15 t0.24Machine hoursC$43.92C$10.54
Personnel: 1 person-hour/machine-hour0.24Machine hoursC$15.60C$3.74
General purpose semi-trailers, load capacity up to 15 t0.24Machine hoursC$6.57C$1.57
Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 11.11Machine hoursC$4.24C$4.71
Gas welding and cutting equipment0.60Machine hoursC$0.21C$0.12
Envelope 5 items C$200,934.26
#CodeDescriptionQtyUnitUnit PriceTotal
12RIDX_KARI_KALIRI_KARI
Wall cladding: architectural concrete panels on an aluminum alloy suspension system
350.0
350 m²(Envelope)
m2C$402.09C$178,025.45
C$140,731.58 +15% C$21,109.74 +10% C$16,184.13
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
2nd grade worker298.51hrsC$23.80C$7,104.08
Grade 3 worker46.41hrsC$25.99C$1,206.03
Grade 4 worker1,013.14hrsC$29.27C$29,653.63
Electricity132.90kWhC$2.45C$326.04
Stainless steel collet anchors with conical spacer sleeve for concealed fastening of cladding panels on ventilated curtain walls, complete with hexagon head bolt and cylindrical collar, M6x10, installation depth 7 mm14.98100 pcsC$1,970.64C$29,520.20
Galvanized steel friction wedge anchors for crack-free concrete, external thread M10, length 98 mm124.8110 pcsC$409.29C$51,083.05
Flat cutting disc, dimensions 125x2.5x22 mm37.94pcsC$9.30C$352.71
Drill bit with diamond tip for drilling holes for collet anchors, drilling depth up to 15 mm, diameter LI.RI mm with reaming up to 9 mm7.42pcsC$2,356.82C$17,487.59
Drill bit with carbide tip, SDS-plus shank for hammer drilling holes in hard materials, total length 160 mm, diameter 10 mm1.26pcsC$28.66C$36.12
Spiral drill bits with cylindrical shank made of high-speed steel P6M5, accuracy class A1, length 86 mm, diameter 5 mm0.39100 pcsC$2,647.32C$1,019.24
Two-component adhesive injection compound based on vinyl ester resin for heavy-duty anchor fastenings in concrete, operating temperature from -40 °C to +40 °C1.96lC$626.32C$1,227.56
Mobile cranes, lifting capacity 16 t12.95Machine hoursC$72.74C$942.02
Personnel: 1 person-hour/machine-hour12.95Machine hoursC$20.86C$270.11
General-purpose electric hoists, load capacity KA.SA t117.08Machine hoursC$0.33C$38.39
Flatbed trucks, load capacity up to 10 tons6.86Machine hoursC$40.56C$278.22
Personnel: 1 person-hour/machine-hour6.86Machine hoursC$15.52C$106.49
Mobile piston compressors with electric motor, pressure up to KA.NE MPa (6 atm), capacity up to KA.VOTO m3/min31.15Machine hoursC$0.76C$23.65
Machines for drilling blind holes for anchors, power ME.PU kW31.15Machine hoursC$1.81C$56.45
13MERI_KAME_KAKAPU_KASA
Installation of flashings for roofs made of weldable materials to walls and parapets with a height of: more than 600 mm
25.0
25 m(Envelope)
mC$55.47C$1,754.24
C$1,386.75 +15% C$208.01 +10% C$159.48
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 113.05hrsC$30.94C$403.84
Propane-butane technical mixture6.13kgC$11.82C$72.44
Cartridges for construction and installation gun, red tip, length 10-18 mm0.051000 pcsC$867.85C$41.22
Ready-mixed masonry mortar, cement, M1000.13m3C$847.46C$108.04
Galvanized sheet steel, thickness KA.LI mm0.05tC$12,849.28C$642.46
Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 50x5 mm0.00tC$10,189.25C$25.48
Two-component thiokol mastic for construction purposes, cold curing1.68kgC$46.26C$77.50
Tower cranes, lifting capacity 8 t0.14Machine hoursC$50.66C$6.84
Personnel: 1 person-hour/machine-hour0.14Machine hoursC$23.09C$3.12
Mobile cranes, lifting capacity 16 t0.03Machine hoursC$80.70C$2.62
Personnel: 1 person-hour/machine-hour0.03Machine hoursC$23.09C$0.75
Flatbed trucks, load capacity up to 5 tons0.05Machine hoursC$31.34C$1.57
Personnel: 1 person-hour/machine-hour0.05Machine hoursC$17.18C$0.86
14MEKA_KAME_KANEKA_KANE
Finishing protruding wall corners with trims: softwoods on brick and concrete (unpainted)
60.0
60 m(Envelope)
mC$52.58C$3,991.11
C$3,155.04 +15% C$473.25 +10% C$362.83
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average work load RI.DX55.80hrsC$23.76C$1,325.89
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III0.02m3C$101,446.40C$1,826.01
Flatbed trucks, load capacity up to 5 tons0.08Machine hoursC$25.84C$2.02
Personnel: 1 person-hour/machine-hour0.08Machine hoursC$14.32C$1.12
15KAME_KARI_KAPUVO_KAME
Reinforcement of uphill and drainage ditches, culverts: gutters
50.0
50 m(Envelope)
mC$262.09C$16,576.93
C$13,104.29 +15% C$1,965.64 +10% C$1,506.99
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average workload TO.KA109.50hrsC$20.36C$2,229.66
Crawler cranes, lifting capacity 25 t23.50Machine hoursC$96.77C$2,274.10
Personnel: 1 person-hour/machine-hour23.50Machine hoursC$16.34C$384.07
Reinforcement of uphill and drainage ditches, culverts: gutters50.00mC$164.33C$8,216.46
16SAVO_KAME_KATOPU_KARIInstallation of drainpipes: from removable mounting towers24.0
24 m(Envelope)
mC$19.32C$586.53
C$463.66 +15% C$69.55 +10% C$53.32
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 110.67hrsC$24.50C$261.32
Simple construction forgings (staples, fasteners, clamps), weight up to ME.NE kg22.80kgC$6.73C$153.37
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m3.55Machine hoursC$2.16C$7.68
Personnel: 1 person-hour/machine-hour3.55Machine hoursC$11.55C$41.02
Flatbed trucks, load capacity up to 5 tons0.01Machine hoursC$23.44C$0.17
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$12.99C$0.09
Openings 4 items C$5,294.50
#CodeDescriptionQtyUnitUnit PriceTotal
17MEKA_MEKA_KAKAVO_KARIm
Installation of automatic sliding doors: double-leaf, with a leaf weight of up to 160 kg
2.0
2 pcs(Openings)
setC$302.09C$764.30
C$604.19 +15% C$90.63 +10% C$69.48
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 123.94hrsC$25.03C$599.14
Electricity1.38kWhC$0.30C$0.41
Flatbed trucks, load capacity up to 6 tons, with crane-manipulator, load capacity 4 tons0.08Machine hoursC$43.77C$3.50
Personnel: 1 person-hour/machine-hour0.08Machine hoursC$14.23C$1.14
18KADX_KAPU_KAMETO_KANEInstallation of fire doors on anchors: double-hung2.0
2 pcs(Openings)
pcsC$1,104.10C$2,793.36
C$2,208.20 +15% C$331.23 +10% C$253.94
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 118.76hrsC$25.32C$475.07
Electricity0.73kWhC$8.15C$5.87
Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm1.6010 pcsC$132.92C$212.57
Drill bit with carbide tip, SDS-plus shank for hammer drilling holes in hard materials, total length 260 mm, diameter 10 mm1.60pcsC$123.05C$197.00
Ready-mixed masonry mortar, cement, M1500.00m3C$5,942.66C$11.99
Universal acrylic sealant for filling joints and cracks, sealing joints0.70lC$432.62C$303.67
Fire-resistant polyurethane foam sealant (assembly foam) for areas with increased fire safety requirements, volume 880 ml1.52pcsC$653.44C$993.17
Construction freight and passenger lifts, lifting capacity up to KA.VO t, lifting height up to 80 m0.13Machine hoursC$17.63C$2.29
Personnel: 1 person-hour/machine-hour0.13Machine hoursC$14.57C$1.89
Flatbed trucks, load capacity up to 5 tons0.11Machine hoursC$26.46C$3.02
Personnel: 1 person-hour/machine-hour0.11Machine hoursC$14.57C$1.66
19NENE_KAME_KAMELI_RIVO
Dismantling of pipelines in accessible channels through inspection windows with pipe diameters: up to 1000 mm
10.0
10 m²(Openings)
mC$81.07C$1,025.50
C$810.67 +15% C$121.60 +10% C$93.23
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average work load RI.DX29.60hrsC$22.98C$680.33
Technical gaseous oxygen3.75m3C$6.44C$24.14
Propane-butane technical mixture0.91kgC$2.82C$2.57
Mobile cranes, lifting capacity 16 t1.23Machine hoursC$64.29C$79.01
Personnel: 1 person-hour/machine-hour1.23Machine hoursC$18.61C$22.87
Flatbed trucks, load capacity up to 5 tons0.04Machine hoursC$24.97C$1.00
Personnel: 1 person-hour/machine-hour0.04Machine hoursC$13.85C$0.55
Gas welding and cutting equipment0.91Machine hoursC$0.21C$0.20
20RIPU_KARI_MEMEKA_KAMEm
Device for unloading radiator sections from a suspended conveyor
1.0
1 pcs(Openings)
pcsC$562.32C$711.34
C$562.32 +15% C$84.35 +10% C$64.67
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 119.60hrsC$26.01C$509.84
Electricity24.00kWhC$0.29C$7.00
Mobile cranes, lifting capacity 16 t0.37Machine hoursC$64.77C$23.96
Personnel: 1 person-hour/machine-hour0.37Machine hoursC$18.75C$6.93
Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t)0.30Machine hoursC$0.40C$0.12
Flatbed trucks, load capacity up to 5 tons0.37Machine hoursC$25.15C$9.31
Personnel: 1 person-hour/machine-hour0.37Machine hoursC$13.95C$5.16
Office Area (50 m²) 5 items C$21,919.52
#CodeDescriptionQtyUnitUnit PriceTotal
21MEKA_KASA_KAKAPU_KAME
Installation of partitions made of plasterboard sheets (drywall) with a double metal frame and two-layer cladding on bot
40.0
40 m²(Office Area (50 m²))
m2C$106.02C$5,364.67
C$4,240.85 +15% C$636.13 +10% C$487.70
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 172.80hrsC$34.89C$2,539.95
Water0.05m3C$2.57C$0.13
Electricity1.58kWhC$0.42C$0.66
Elastic self-adhesive tapes for guide profiles 50x30000 mm106.80mC$0.46C$49.61
Perforated paper reinforcement tapes for increasing the crack resistance of joints, width 52 mm60.80mC$0.15C$9.41
Paper tapes for creating artificial cracks between frame structures and adjacent surfaces, with an adhesive layer on one side and an anti-adhesive coating on the other, white, width 65 mm0.71100 mC$184.51C$130.63
Plastic dowels with screws, diameter 6 mm, length 35 mm, screw diameter TO.SA mm, screw length 50 mm1.35100 pcsC$4.29C$5.81
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter TO.SA mm, length 25 mm5.41100 pcsC$1.68C$9.10
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter TO.SA mm, length 35 mm14.13100 pcsC$2.19C$30.95
Galvanized steel guide profile for installing gypsum partitions and suspended ceilings, dimensions 50x40 mm, steel thickness KA.NE mm60.40mC$3.85C$232.48
Galvanized steel rack profile, dimensions 50x50 mm, thickness KA.NE mm162.80mC$6.08C$990.36
Deep-penetrating, quick-drying, vapor-permeable strengthening primer8.00kgC$6.57C$52.56
Dry putty mixes based on high-strength gypsum with polymer additives, aggregate size no more than KA.MESA mm, flexural strength RI.LI MPa8.40kgC$5.77C$48.50
Universal dry putty mixtures based on gypsum with polymer additives, aggregate size not exceeding KA.RI mm, flexural strength not less than ME.KA MPa59.60kgC$1.50C$89.66
Mobile cranes, lifting capacity 16 t0.36Machine hoursC$91.46C$33.29
Personnel: 1 person-hour/machine-hour0.36Machine hoursC$26.34C$9.59
Flatbed trucks, load capacity up to 5 tons0.15Machine hoursC$35.52C$5.26
Personnel: 1 person-hour/machine-hour0.15Machine hoursC$19.60C$2.90
Electric shears0.08Machine hoursC$0.20C$0.01
22MEKA_KALI_KAMERI_KAME
Installation of suspended ceilings made of reinforced cement-mineral slabs, internal: on a wooden frame
50.0
50 m²(Office Area (50 m²))
m2C$93.18C$5,893.72
C$4,659.06 +15% C$698.86 +10% C$535.79
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 155.00hrsC$28.35C$1,559.01
Electricity1.58kWhC$1.77C$2.78
Alkali-resistant glass fiber reinforcement tape, width 100 mm, length 50000 mm2.12pcsC$316.27C$670.50
Polypropylene anchor dowel nails with flange, diameter 6 mm, length 40 mm1.77100 pcsC$55.81C$99.03
Self-tapping steel screws with anti-corrosion coating, countersunk head and cross-shaped slot, double-start thread, pointed tip, diameter PU.RI mm, length 25 mm1.621000 pcsC$379.54C$616.73
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter PU.RI mm, length 75 mm3.19100 pcsC$22.30C$71.26
Sanding paper2.10m2C$73.91C$155.24
Dry concrete mixes, non-shrinking, fast-setting, containing polymer and rigid steel fibers, for repairing concrete and reinforced concrete elements of bridge structures, airfield and road pavements subject to dynamic and impact loads, aggregate size 10 mm36.00kgC$24.64C$886.94
Galvanized steel straight hangers for attaching suspended ceilings to profiles, profile dimensions 60x27 mm, hanger length 300 mm, thickness KA.LI mm1.75100 pcsC$320.37C$560.64
Mobile cranes, lifting capacity 16 t0.31Machine hoursC$74.41C$23.06
Personnel: 1 person-hour/machine-hour0.31Machine hoursC$21.40C$6.63
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.12Machine hoursC$2.67C$0.34
Personnel: 1 person-hour/machine-hour0.12Machine hoursC$14.16C$1.76
Flatbed trucks, load capacity up to 5 tons0.12Machine hoursC$28.90C$3.32
Personnel: 1 person-hour/machine-hour0.12Machine hoursC$15.93C$1.83
23SALI_KAME_KAMEME_KASA
Installation of bases for floor covering: from chipboard with an area of up to 20 m2
50.0
50 m²(Office Area (50 m²))
m2C$27.12C$1,715.04
C$1,355.77 +15% C$203.36 +10% C$155.91
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 123.03hrsC$23.24C$535.33
Plywood boards type P1, standard unpolished, formaldehyde emission class E1, without facing, grade II, thickness 15-17 mm0.51100 m2C$514.04C$262.16
KN-2 rubber adhesive mastic66.50kgC$8.36C$555.93
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.05Machine hoursC$2.37C$0.12
Personnel: 1 person-hour/machine-hour0.05Machine hoursC$12.66C$0.63
Flatbed trucks, load capacity up to 5 tons0.04Machine hoursC$25.72C$1.03
Personnel: 1 person-hour/machine-hour0.04Machine hoursC$14.24C$0.57
24NEDX_KAME_KARIPU_KANEPontoon painting90.0
90 m²(Office Area (50 m²))
m2C$77.78C$8,854.91
C$6,999.93 +15% C$1,049.99 +10% C$804.99
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 135.10hrsC$22.09C$775.25
Technical orthophosphoric acid5.40kgC$3.02C$16.31
Mobile screw compressors with electric motor, pressure up to KA.NE MPa (6 atm), capacity up to TO.SA m3/min23.40Machine hoursC$4.26C$99.76
Tugs, power 221 kW (300 hp)6.30Machine hoursC$81.27C$511.97
Personnel: 3 man-hours/machine-hours6.30Machine hoursC$37.09C$233.68
Non-self-propelled floating cranes, 5 t26.10Machine hoursC$139.69C$3,645.82
Personnel: 5 man-hours/machine-hours26.10Machine hoursC$61.82C$1,613.50
Floating platforms, collapsible, load capacity TO.SA t4.50Machine hoursC$19.78C$89.00
High-pressure painting units for painting structural surfaces, power 1 kW17.10Machine hoursC$0.20C$3.44
Electric high-pressure devices for hydrocleaning surfaces, capacity 17 l/min, pressure 50 MPa5.40Machine hoursC$2.07C$11.19
25MEKA_KARI_KAPUNE_KATOAssembly: toilet1.0
1 set(Office Area (50 m²))
pcsC$72.08C$91.18
C$72.07 +15% C$10.81 +10% C$8.29
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average work load RI.DX2.72hrsC$26.34C$71.65
Flatbed trucks, load capacity up to 5 tons0.01Machine hoursC$25.54C$0.26
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$15.87C$0.16
MEP 8 items C$23,012.42
#CodeDescriptionQtyUnitUnit PriceTotal
26MEVO_KADX_KAKAME_KALIm
Distribution device with electric start, nominal passage diameter: 50 mm
1.0
1 set(MEP)
setC$695.19C$879.42
C$695.19 +15% C$104.28 +10% C$79.95
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 125.00hrsC$27.17C$679.13
Acetylene gas, technical grade0.07m3C$24.70C$1.73
Technical gaseous oxygen0.11m3C$6.59C$0.73
Uncoated welding wire SV-08G2S, diameter 2 mm0.11kgC$4.53C$0.50
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm0.08kgC$6.11C$0.49
Mobile cranes, lifting capacity 16 t0.09Machine hoursC$65.89C$5.93
Personnel: 1 person-hour/machine-hour0.09Machine hoursC$19.08C$1.71
Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t)0.17Machine hoursC$0.41C$0.07
Flatbed trucks, load capacity up to 5 tons0.09Machine hoursC$25.59C$2.31
Personnel: 1 person-hour/machine-hour0.09Machine hoursC$14.20C$1.28
Welding machines for manual arc welding, welding current up to 350 A0.93Machine hoursC$1.42C$1.32
27KAVO_KARI_TOVORI_KATOmLinear LED lighting fixture, uncontrolled: from a car lift20.0
20 pcs(MEP)
pcsC$380.36C$9,623.05
C$7,607.16 +15% C$1,141.07 +10% C$874.82
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Grade 3 worker139.40hrsC$21.54C$3,003.10
Grade 4 worker100.40hrsC$24.26C$2,436.12
Single-component silicone-based sealant, neutral0.20lC$30.96C$6.19
Auto hydraulic lifts, lifting height 12 m37.20Machine hoursC$19.64C$730.75
Personnel: 1 person-hour/machine-hour37.20Machine hoursC$12.87C$478.73
Flatbed trucks, load capacity up to 5 tons26.40Machine hoursC$23.20C$612.52
Personnel: 1 person-hour/machine-hour26.40Machine hoursC$12.87C$339.75
28KAVO_KATO_SADXDX_MEPUm
Lighting panels installed on the wall: bolts on the structure, shield weight over 15 to 40 kg
8.0
8 pcs(MEP)
pcsC$156.76C$1,586.44
C$1,254.10 +15% C$188.12 +10% C$144.22
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 137.28hrsC$28.03C$1,045.09
Rubberized cotton insulating tape for electrical installation and repair work, black, width 20 mm, thickness KA.TOSA mm38.64mC$0.25C$9.83
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm0.40kgC$6.22C$2.49
Bolts with nuts and washers for construction3.28kgC$8.71C$28.58
Polypropylene expansion anchors0.32100 pcsC$2.23C$0.71
MA-0115 oil paint, mummy, iron minium0.80kgC$5.22C$4.17
Flexible jumpers, type PGS-500.8010 pcsC$54.35C$43.48
Insulating bushings, dimensions 65x50x18 mm0.161000 pcsC$210.50C$33.68
U731M type clamps for main and branch wires and cables0.32100 pcsC$104.33C$33.39
Polyvinyl chloride electrical conduit, wall thickness KA.NE mm2.00kgC$10.88C$21.76
Mobile cranes, lifting capacity 16 t0.24Machine hoursC$67.03C$16.09
Personnel: 1 person-hour/machine-hour0.24Machine hoursC$19.40C$4.66
Flatbed trucks, load capacity up to 5 tons0.24Machine hoursC$26.03C$6.25
Personnel: 1 person-hour/machine-hour0.24Machine hoursC$14.44C$3.46
Welding machines for manual arc welding, welding current up to 350 A0.32Machine hoursC$1.45C$0.46
29KAVO_KATO_SADXME_KAVOmPlug socket: non-recessed type with exposed wiring20.0
20 pcs(MEP)
pcsC$9.68C$244.82
C$193.53 +15% C$29.03 +10% C$22.26
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 16.91hrsC$27.75C$191.82
Electricity0.43kWhC$0.30C$0.13
Rubberized cotton insulating tape for electrical installation and repair work, black, width 20 mm, thickness KA.TOSA mm1.83mC$0.25C$0.46
Polypropylene expansion anchors0.20100 pcsC$2.20C$0.45
Mobile cranes, lifting capacity 16 t0.01Machine hoursC$66.81C$0.40
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$19.20C$0.11
Flatbed trucks, load capacity up to 5 tons0.00Machine hoursC$25.95C$0.10
Personnel: 1 person-hour/machine-hour0.00Machine hoursC$14.29C$0.06
30MEKA_MEKA_KAMEKA_KARIm
Configuration of facility equipment for the hardware and software complex of the notification transmission system for jo
1.0
1 set(MEP)
setC$89.08C$112.69
C$89.08 +15% C$13.36 +10% C$10.24
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Grade 5 worker0.46hrsC$31.19C$14.34
Grade 6 worker2.05hrsC$36.46C$74.74
31TOPU_KAME_KALIME_KAMEm
Stationary lamp: with emergency power supply, with adjustable lighting, six-reflector
10.0
10 pcs(MEP)
pcsC$803.32C$10,161.98
C$8,033.18 +15% C$1,204.98 +10% C$923.82
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1309.00hrsC$25.98C$8,026.62
Electricity22.00kWhC$0.30C$6.56
32NESA_KAME_KAKANE_MENEReplacement: two-compartment sinks1.0
1 set(MEP)
pcsC$314.54C$397.90
C$314.54 +15% C$47.18 +10% C$36.17
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 13.35hrsC$26.14C$87.56
Cable0.00tC$205,734.40C$20.55
Dowels0.00tC$183,948.23C$18.36
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm0.00tC$117,633.88C$11.77
Expanding gypsum-clay cement0.00tC$38,461.99C$3.79
Polyvinyl chloride bushings0.04100 pcsC$4,298.70C$172.00
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.01Machine hoursC$2.44C$0.02
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$13.05C$0.12
Flatbed trucks, load capacity up to 5 tons0.01Machine hoursC$26.49C$0.24
Personnel: 1 person-hour/machine-hour0.01Machine hoursC$14.69C$0.13
33MERI_KAME_KATOSA_KARIInstallation of a metal drainage system: voronok1.0
1 set(MEP)
pcsC$4.84C$6.12
C$4.84 +15% C$0.73 +10% C$0.56
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 10.18hrsC$26.88C$4.84
External Works 3 items C$177,585.47
#CodeDescriptionQtyUnitUnit PriceTotal
34TOLI_KATO_KATOKA_KATO
Installation of prefabricated reinforced concrete slabs for the unloading platform of Bolverk-type berthing quays in clo
50.0
50 m²(External Works)
m3C$2,149.84C$135,977.20
C$107,491.85 +15% C$16,123.78 +10% C$12,361.56
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 115.85hrsC$18.35C$290.81
Cranes on crawler tracks, load capacity 50 t3.85Machine hoursC$109.51C$421.07
Personnel: 1 person-hour/machine-hour3.85Machine hoursC$14.28C$54.90
Pneumatic wheeled cranes, lifting capacity 30 t2.25Machine hoursC$83.66C$188.24
Personnel: 1 person-hour/machine-hour2.25Machine hoursC$14.28C$32.13
Flatbed trucks, load capacity up to 15 t3.38Machine hoursC$56.17C$189.57
Personnel: 1 person-hour/machine-hour3.38Machine hoursC$11.45C$38.64
Installation of prefabricated reinforced concrete slabs for the unloading platfo50.00m3C$2,125.53C$106,276.50
35KALI_KAME_KASAPU_KANE
Installation of metal fences on reinforced concrete posts: with a mesh panel base over ME.NE to 2 m high
120.0
120 m(External Works)
mC$270.22C$41,019.36
C$32,426.37 +15% C$4,863.96 +10% C$3,729.03
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1271.20hrsC$23.01C$6,240.83
Ready-mixed masonry mortar, cement, M500.01m3C$184,460.37C$2,215.58
Single solid ceramic brick, dimensions 250x120x65 mm, grade M1000.021000 pcsC$813,259.63C$19,518.65
Mobile cranes, lifting capacity 16 t52.45Machine hoursC$66.34C$3,479.72
Personnel: 1 person-hour/machine-hour52.45Machine hoursC$16.78C$880.20
Hydraulic diggers0.58Machine hoursC$1.51C$0.87
Flatbed trucks, load capacity up to 5 tons1.75Machine hoursC$25.77C$45.14
Personnel: 1 person-hour/machine-hour1.75Machine hoursC$12.49C$21.88
Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 15.26Machine hoursC$4.47C$23.49
36KALI_KAME_KASASA_KAPU
Installation of swing gates: with the installation of reinforced concrete posts without foundations
1.0
1 pcs(External Works)
pcsC$465.54C$588.91
C$465.54 +15% C$69.83 +10% C$53.54
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 19.59hrsC$22.22C$213.07
Welding electrodes for welding low-alloy and carbon steels ANO-6, E42, diameter 6 mm0.00tC$135,142.61C$40.63
Ready-mixed masonry mortar, cement, M250.00m3C$4,255.20C$2.16
Single solid ceramic brick, dimensions 250x120x65 mm, grade M1000.001000 pcsC$19,596.36C$21.61
Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m30.09Machine hoursC$41.64C$3.79
Personnel: 1 person-hour/machine-hour0.09Machine hoursC$14.02C$1.28
Mobile cranes, lifting capacity 16 t2.17Machine hoursC$66.58C$144.64
Personnel: 1 person-hour/machine-hour2.17Machine hoursC$16.39C$35.60
Deep vibrators0.24Machine hoursC$0.55C$0.13
Flatbed trucks, load capacity up to 5 tons0.05Machine hoursC$25.86C$1.38
Personnel: 1 person-hour/machine-hour0.05Machine hoursC$12.20C$0.66
Welding machines for manual arc welding, welding current up to 350 A0.40Machine hoursC$1.44C$0.58
Cost Summary
Direct Cost387%C$1,942,031.72
Overhead+15%C$291,304.76
Profit+10%C$223,333.62
Grand TotalC$501,210.21

Resource Summary

134 resourcesiAggregated materials, labor, and equipment needed for the entire project
Materials to Order (82)
ResourceUnitQtyUnit PriceCost
Installation of prefabricated reinforced concrete slabs for the unloadm350.00C$2,125.53C$106,276.50
Galvanized steel friction wedge anchors for crack-free concrete, exter10 pcs124.81C$409.29C$51,083.05
Stainless steel collet anchors with conical spacer sleeve for conceale100 pcs14.98C$1,970.64C$29,520.20
Single solid ceramic brick, dimensions 250x120x65 mm, grade M1001000 pcs0.03C$778,496.41C$19,540.26
Drill bit with diamond tip for drilling holes for collet anchors, drilpcs7.42C$2,356.82C$17,487.59
Reinforcement of uphill and drainage ditches, culverts: guttersm50.00C$164.33C$8,216.46
Low-carbon steel knitting wiret0.03C$213,544.40C$5,338.61
U-1 slope fastening unitpcs48.00C$49.30C$2,366.36
Ready-mixed masonry mortar, cement, M50m30.01C$184,631.67C$2,215.58
Edged softwood boards, natural moisture content, length RI-NE.SA m, wim30.02C$101,445.00C$1,826.01
Two-component adhesive injection compound based on vinyl ester resin fl1.96C$626.31C$1,227.56
Spiral drill bits with cylindrical shank made of high-speed steel P6M5100 pcs0.39C$2,647.38C$1,019.24
Fire-resistant polyurethane foam sealant (assembly foam) for areas witpcs1.52C$653.40C$993.17
Galvanized steel rack profile, dimensions 50x50 mm, thickness KA.NE mmm162.80C$6.08C$990.36
Drying paste-like sealant-adhesive based on organic solvents for sealikg10.72C$83.85C$898.82
Dry concrete mixes, non-shrinking, fast-setting, containing polymer ankg36.00C$24.64C$886.94
Bolts with nuts and washers for constructionkg156.30C$5.42C$847.43
Alkali-resistant glass fiber reinforcement tape, width 100 mm, length pcs2.12C$316.27C$670.50
Galvanized sheet steel, thickness KA.LI mmt0.05C$12,849.20C$642.46
Self-tapping steel screws with anti-corrosion coating, countersunk hea1000 pcs1.62C$379.53C$616.73
Welding electrodes for welding low-alloy and carbon steels UONI 13/45,kg7.97C$74.91C$597.02
Welding electrodes for welding low-alloy and carbon steels ANO-6, E42,t0.10C$5,814.86C$583.23
Galvanized steel straight hangers for attaching suspended ceilings to 100 pcs1.75C$320.37C$560.64
KN-2 rubber adhesive mastickg66.50C$8.36C$555.93
Flat cutting disc, dimensions 125x2.5x22 mmpcs37.94C$9.30C$352.71
ElectricitykWh184.59C$1.89C$349.45
Universal acrylic sealant for filling joints and cracks, sealing jointl0.70C$432.58C$303.67
Plywood boards type P1, standard unpolished, formaldehyde emission cla100 m20.51C$514.04C$262.16
Galvanized steel guide profile for installing gypsum partitions and sum60.40C$3.85C$232.48
Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm10 pcs1.60C$132.86C$212.57
Grand TotalC$259,060.10
Labor Requirements (11)
ResourceUnitQtyUnit PriceCost
Worker Category 1hrs2,368.74C$27.47C$65,081.01
Grade 4 workerhrs1,113.55C$28.82C$32,089.75
2nd grade workerhrs298.51C$23.80C$7,104.08
Personnel: 1 person-hour/machine-hourMachine hours265.23C$16.06C$4,259.06
Grade 3 workerhrs185.81C$22.65C$4,209.13
Average workload TO.KAhrs109.50C$20.36C$2,229.66
Average work load RI.DXhrs88.12C$23.58C$2,077.87
Personnel: 5 man-hours/machine-hoursMachine hours26.10C$61.82C$1,613.50
Personnel: 3 man-hours/machine-hoursMachine hours6.30C$37.09C$233.68
Grade 6 workerhrs2.05C$36.46C$74.74
Grade 5 workerhrs0.46C$31.17C$14.34
Grand TotalC$118,986.82
Equipment Requirements (41)
ResourceUnitQtyUnit PriceCost
Mobile cranes, lifting capacity 16 tMachine hours77.65C$67.45C$5,237.40
Non-self-propelled floating cranes, 5 tMachine hours26.10C$139.69C$3,645.82
Crawler cranes, lifting capacity 25 tMachine hours27.52C$96.09C$2,644.30
Tower cranes, lifting capacity 8 tMachine hours26.54C$38.64C$1,025.39
Concrete paving machines on rail forms Joint cutters for freshly laid Machine hours8.96C$102.74C$920.54
Bulldozers, power 59 kW (80 hp)Machine hours10.80C$80.10C$865.09
Flatbed trucks, load capacity up to 5 tonsMachine hours31.16C$23.58C$734.71
Auto hydraulic lifts, lifting height 12 mMachine hours37.20C$19.64C$730.75
Tugs, power 221 kW (300 hp)Machine hours6.30C$81.27C$511.97
Cranes on crawler tracks, load capacity 50 tMachine hours3.85C$109.51C$421.07
Flatbed trucks, load capacity up to 10 tonsMachine hours7.33C$40.34C$295.89
Trucks, load capacity up to 8 tonsMachine hours6.00C$36.17C$217.05
Pneumatic wheeled cranes, lifting capacity 30 tMachine hours2.46C$83.32C$204.96
Flatbed trucks, load capacity up to 15 tMachine hours3.38C$56.17C$189.57
Mobile screw compressors with electric motor, pressure up to KA.NE MPaMachine hours23.40C$4.26C$99.76
Floating platforms, collapsible, load capacity TO.SA tMachine hours4.50C$19.78C$89.00
Welding machines for manual arc welding, welding current up to 350 AMachine hours43.85C$1.38C$60.65
Machines for drilling blind holes for anchors, power ME.PU kWMachine hours31.15C$1.81C$56.45
General-purpose electric hoists, load capacity KA.SA tMachine hours117.08C$0.33C$38.39
Welding units with internal combustion engines for manual arc welding,Machine hours6.37C$4.43C$28.20
Grand TotalC$18,166.66

Material Alternatives

iAlternative materials with approximate price difference. Percentages show material cost change relative to the current specification.
Installation of prefabricated reinforced concrete slabsC$106,276.50
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Wall cladding: architectural concrete panels on an alumC$101,052.50
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Installation of metal fences on reinforced concrete posC$21,734.23
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Reinforcement of uphill and drainage ditches, culverts:C$8,216.46
Galvanized rebar+35%Fiber reinforcement-15%Stainless steel rebar+110%
Reinforcement of monolithic reinforced concrete columnsC$5,896.78
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Finishing protruding wall corners with trims: softwoodsC$1,826.01
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%

Risk Analysis

Monte Carlo · 10KiMonte Carlo simulation (10,000 iterations) showing completion probability at different confidence levels
301days
P50
50% probability the project finishes within this timeframe. Median scenario based on Monte Carlo simulation.
316days
P80
80% probability — recommended planning basis. Accounts for common delays and uncertainties.
332days
P95
95% probability — conservative estimate. Covers nearly all risk scenarios including severe delays.
+42days
Buffer
Recommended time buffer to add to the deterministic schedule. Covers typical construction uncertainties.
Base Cost (P50)
C$501,210.21
Budget (P80)
C$528,253.61
Maximum (P95)
C$554,170.20
Contingency
+5.4%
Recommended cost reserve based on schedule risk analysis — C$27,043.40
Recommended Budget: C$528,253.61
Deterministic 274 days
P50 301 days
P80 316 days
P95 332 days
P50 P80 P95
Based on Monte Carlo simulation with 10,000 iterations using PERT distribution for each phase duration.
Peak: 13
4,464 man-hours
15 crit. phases

Cost Risk Analysis

Monte Carlo · 10,000 iterations

Monte Carlo simulation of construction cost uncertainty

Cost Percentiles

C$3,028,216.63
P10
C$3,087,906.79
P25
C$3,154,569.29
P50
C$3,243,072.65
P80
C$3,289,205.32
P90

Cumulative Probability (S-Curve)

+2.8%
Recommended Contingency (P80 − P50)
Reserve to cover likely cost overruns with 80% confidence — C$88,503.36

Top Risk Drivers

CategoryWork ItemRisk Share
FoundationsHydraulically driven machine for formwork removal
48.2%
FoundationsLaying precast reinforced concrete floor slabs wei
39.6%
EnvelopeConcreting curved walls with previously installed
7.0%
Steel StructureInstallation of building frames: box-section frame
2.1%
EnvelopeWall cladding: architectural concrete panels on an
1.8%
External WorksInstallation of prefabricated reinforced concrete
1.1%
External WorksInstallation of metal fences on reinforced concret
0.1%
Site & EarthworksSnow removal from construction sites and roads: bu
0.0%

Sensitivity Analysis

±10%iImpact of ±10% change in each cost component on the total project cost

This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.

Decrease ← → IncreaseImpact
Overhead58% of total
±C$29,130.48±5.8%
Materials52% of total
±C$25,906.01±5.2%
Profit45% of total
±C$22,333.36±4.5%
Labor24% of total
±C$11,898.68±2.4%
Equipment4% of total
±C$1,816.67±0.4%

Cost Summary

iFinal cost breakdown with direct costs, overhead, profit, and grand total
LaborC$118,986.8224%
MaterialsC$259,060.0952%
EquipmentC$18,166.694%
Direct CostC$1,942,031.72
OverheadC$291,304.7658%
ProfitC$223,333.6245%
Grand TotalC$501,210.21100%
EUR equivalent€312.670,12
USD equivalent$360,352.32
GBP equivalent£272,814.06

Estimate Classification

AACE 18R-97

AACE International Recommended Practice 18R-97

2
ClassClass 2
Typical PurposeCost Control
Expected Accuracy Range: -15% / +20%
Project Definition Level: 30–75%

Cost Benchmark

Office · North America

Comparison of estimated cost/m² against market reference ranges

Low
1,800
▲ Typical
2,500
High
3,800
▼ Your Estimate
3,129 EUR/m²
Within typical range · 1.25x ratio to typical

Methodology & Assumptions

iCalculation methodology, data sources, and key assumptions underlying this estimate
Data SourceDDC Pricing DB — English
Confidence Level50%
Overhead Rate15%
Profit Rate10%
Items Matched36
Assumptions
  • Costs adjusted by location-specific labor, material, and equipment factors
  • Exchange rates are offline reference rates and may differ from market rates
  • All amounts exclude VAT / sales tax
  • This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
  • All labor, materials, and equipment per defined scope
  • Overhead and profit margins as specified
  • Location-adjusted pricing factors applied
Excluded from Estimate
  • VAT / sales tax
  • Permits, licenses, and legal fees
  • Temporary works and site facilities
  • Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied

Frequently Asked Questions

How much does Small Warehouse Construction cost?
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 45 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 45 work items covering Site & Earthworks, Foundations, Steel Structure, Envelope, Openings, Office Area (50 m²). Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Small Warehouse Construction take?
Duration depends on project size and complexity. A typical 500 m² warehouse + 50 m² office project takes approximately 7 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a small warehouse construction include?
Full construction estimate for a 500 m² small warehouse or distribution facility. Covers site preparation, concrete slab-on-grade foundation, steel frame structure, insulated metal panel cladding, loading dock, industrial electrical and lighting, fire sprinkler system, and site works including parking and drainage.

Get a Personalized Estimate for Your Project

Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.

Calculate Cost for My Project →