Two-Storey House Construction Cost Estimate — 180 m² GFA (90+90)

180 m² GFA (90+90) 78 work items 9 sections Toronto, Canada

About This Project

Complete construction estimate for a 200 m² two-storey house. Includes foundations, ground and first floor structure, load-bearing walls, staircase, roof framing and covering, full MEP installations, insulation and vapour barrier, interior and exterior finishes, two bathrooms, kitchen, and landscaping.

Scope of Works

Site & Earthworks (5)Foundations & Ground Floor (10)Superstructure (10)Roof (9)Openings (8)External Finishes (4)Internal Finishes (10)MEP (Plumbing, Heating, Electrical) (16)External Works (6)

Get a Personalized Estimate for Your Project

Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.

Calculate Cost for My Project →
Full Professional Estimate
0 items changed

Overview

iKey project metrics at a glance — total cost per m², labor and material shares, and estimated duration
Source: Text Query
C$861.34
Cost / m²
22.8%
Labor
55.4%
Materials
138 days
Est. Duration

Work Items

16 items iAdjust quantities or remove items, then recalculate. Click item name to jump to details.

Project Context

iInput parameters, location adjustment factors, and detection confidence for this estimate
Source
Residential
180 m² · 16 items
SourceText Query
Work Items16 items · 16 Categories
CurrencyC$ CAD
LanguageEnglish
Date05 Apr 2026
Two-Storey House Construction 180 m² GFA (90+90) Toronto Canada
Cost / m²
C$861.34
180 m²
Est. Duration
5 months
138 days
Overhead
15%
C$18,384.36
Direct Costs
79%
C$122,562.56
Location
Toronto, Canada
Americas
×1.07
Estimate Overview
C$155,041.60
C$861.34 / m² · 5 months (138 days)
Labor 23% Materials 55% Equipment 1% Overhead 12% Profit 9%
Contingency (P80)
+8%
C$13,023.49
Budget (P80)
C$168,065.09
recommended
Resources
54
34 mat · 5 lab · 15 equ
Overhead + Profit
12% + 9%
C$32,479.04
Pricing Methodology
Data Source: DDC Pricing DB — English · 55,719 items · CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%

Cost Breakdown

iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$122,562.56Direct Cost
Labor (23%)C$35,354.95
Materials (55%)C$85,921.30
Equipment (1%)C$1,286.31
Overhead (12%)C$18,384.36
Profit (9%)C$14,094.68
Cost / m²
LaborC$196.42
MaterialsC$477.34
EquipmentC$7.15
OverheadC$102.14
ProfitC$78.30
Grand TotalC$861.34
Materials / Labor
2.43
Direct Cost %
79.1%
16 work items across 16 categories, 54 resources

Cost Flow

16iVisual flow of the total budget through work categories, showing proportional cost distribution
Total CostC$155,041.60Doors: C$3,307.17 (2.1%)Heating: C$3,767.59 (2.4%)Roofing: C$3,847.90 (2.5%)Windows: C$8,814.35 (5.7%)Bathroom: C$376.21 (0.2%)Flooring: C$5,248.03 (3.4%)Painting: C$1,433.43 (0.9%)Plumbing: C$6,668.93 (4.3%)Earthwork: C$317.01 (0.2%)Structure: C$8,013.85 (5.2%)Electrical: C$2,892.89 (1.9%)Foundation: C$4,172.07 (2.7%)Insulation: C$13,192.72 (8.5%)Plastering: C$14,658.42 (9.5%)External Walls: C$27,369.22 (17.7%)Internal Walls: C$50,961.82 (32.9%)Doors2.1%Heating2.4%Roofing2.5%Windows5.7%Bathroom0.2%Flooring3.4%Painting0.9%Plumbing4.3%Earthwork0.2%Structure5.2%Electrical1.9%Foundation2.7%Insulation8.5%Plastering9.5%External Walls17.7%Internal Walls32.9%

Categories

16iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
CategoryCostCost / m²Share
DoorsC$3,307.17C$18.372.1%
HeatingC$3,767.59C$20.932.4%
RoofingC$3,847.90C$21.382.5%
WindowsC$8,814.35C$48.975.7%
BathroomC$376.21C$2.090.2%
FlooringC$5,248.03C$29.163.4%
PaintingC$1,433.43C$7.960.9%
PlumbingC$6,668.93C$37.054.3%
EarthworkC$317.01C$1.760.2%
StructureC$8,013.85C$44.525.2%
ElectricalC$2,892.89C$16.071.9%
FoundationC$4,172.07C$23.182.7%
InsulationC$13,192.72C$73.298.5%
PlasteringC$14,658.42C$81.449.5%
External WallsC$27,369.22C$152.0517.7%
Internal WallsC$50,961.82C$283.1232.9%

Top Items

DescriptionTotal
Limestone partition wall masonry: unreinforced with a f…C$50,961.82
Masonry of external and internal brick walls with an ai…C$27,369.22
Continuous leveling of interior surfaces (single-layer …C$14,658.42
Insulation of interior walls on wood with spray guns us…C$13,192.72
Installation of PVC profile window blocks in residentia…C$8,814.35

What-If Scenarios

iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$139,537.44
↓ C$15,504.16 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$155,041.60
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$178,297.84
↑ C$23,256.24 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor 0%
Materials 0%
Equipment 0%
Custom Scenario Total Cost
C$155,041.60

Project Schedule

≈5 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
Construction PhasesAI
Site PreparationSite clearing, temporary facilities setup, access roads12d
EarthworksExcavation, grading, soil compaction, utility trenches8d
FoundationFoundation excavation, formwork, concrete pouring and curing8d
Structural FrameworkFraming, structural elements, load-bearing walls30d
RoofingRoof framing, sheathing, weatherproofing, finish roofing8d
External WallsExterior wall construction, sheathing, weather barrier8d
Windows and Exterior DoorsInstallation of windows and exterior door frames8d
MEP Rough-inElectrical wiring, plumbing, HVAC rough installation33d
InsulationWall and ceiling insulation installation8d
Drywall and PlasteringDrywall installation, taping, mudding, plastering11d
Interior DoorsInterior door frame and door installation8d
FlooringSubfloor preparation, finish flooring installation8d
Bathroom FixturesBathroom fixture installation, tiling, waterproofing8d
MEP FinishFinal electrical, plumbing, and HVAC connections8d
Painting and FinishesInterior and exterior painting, final trim work8d
Final Cleanup and HandoverFinal cleaning, inspections, punch list completion8d
5
months
138
days
16
phases
12
Critical Path
6
Peak workers
1,166
Labor Hours
M1 M2 M3 M4 M5 Crew/Float Site Preparation Site Preparation: 12d, Crew 2, Float 0d 12d 2 / - Earthworks Earthworks: 8d, Crew 2, Float 0d 2 / - Foundation Foundation: 8d, Crew 2, Float 0d 2 / - Structural Framework Structural Framework: 30d, Crew 2, Float 0d 30d 2 / - Roofing Roofing: 8d, Crew 2, Float 13d 2 / 13d External Walls External Walls: 8d, Crew 2, Float 64d 2 / 64d Windows and Exterior … Windows and Exterior Doors: 8d, Crew 2, Float 64d 2 / 64d MEP Rough-in MEP Rough-in: 33d, Crew 2, Float 0d 33d 2 / - Insulation Insulation: 8d, Crew 2, Float 0d 2 / - Drywall and Plastering Drywall and Plastering: 11d, Crew 2, Float 0d 11d 2 / - Interior Doors Interior Doors: 8d, Crew 2, Float 32d 2 / 32d Flooring Flooring: 8d, Crew 2, Float 0d 2 / - Bathroom Fixtures Bathroom Fixtures: 8d, Crew 2, Float 0d 2 / - MEP Finish MEP Finish: 8d, Crew 2, Float 0d 2 / - Painting and Finishes Painting and Finishes: 8d, Crew 2, Float 0d 2 / - Final Cleanup and Han… Final Cleanup and Handover: 8d, Crew 2, Float 0d 2 / - Workers 155K 50% (46d)
Site PreparationEarthworksFoundationStructural FrameworkRoofingExternal WallsWindows and Exterior DoorsMEP Rough-inInsulationDrywall and PlasteringInterior DoorsFlooringBathroom FixturesMEP FinishPainting and FinishesFinal Cleanup and HandoverCumulative Cost
Labor Hours by Phase
MEP Rough-in
336 hours
Structural Framework
305 hours
Site Preparation
120 hours
Drywall and Plasteri
106 hours
Roofing
71 hours
Flooring
71 hours
External Walls
50 hours
MEP Finish
50 hours
Final Cleanup and Ha
50 hours
Painting and Finishe
39 hours
Windows and Exterior
37 hours
Foundation
33 hours
Insulation
18 hours
Interior Doors
16 hours
Bathroom Fixtures
13 hours
Earthworks
0 hours

Monthly Cash Flow

5 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
37%
M1
63%
M2
86%
M3
99%
M4
100%
M5
MonthdaysMonthly Cost%Cumulative%
M11–30C$57,809.7737.3%C$57,809.7737%
M231–60C$39,641.0725.6%C$97,450.8563%
M361–90C$36,565.2523.6%C$134,016.1086%
M491–120C$19,592.0812.6%C$153,608.1899%
M5121–138C$1,433.430.9%C$155,041.61100%

Daily Cash Flow

19 weeks
3%
D1
33%
D13
35%
D25
43%
D37
53%
D49
63%
D61
73%
D73
82%
D85
92%
D97
99%
D109
99%
D121
100%
D129
WeekdaysWeekly Cost%Cumulative%
W1D1–D7C$29,727.7319.2%C$29,727.7319%
W2D8–D14C$21,313.3413.7%C$51,041.0733%
W3D15–D21C$759.270.5%C$51,800.3433%
W4D22–D28C$3,650.562.4%C$55,450.9036%
W5D29–D35C$8,256.055.3%C$63,706.9541%
W6D36–D42C$8,256.055.3%C$71,962.0046%
W7D43–D49C$9,467.816.1%C$81,430.8153%
W8D50–D56C$11,083.507.1%C$92,514.3160%
W9D57–D63C$7,591.264.9%C$100,105.5765%
W10D64–D70C$8,677.595.6%C$108,783.1670%
W11D71–D77C$7,234.634.7%C$116,017.7975%
W12D78–D84C$9,053.295.8%C$125,071.0881%
W13D85–D91C$10,277.606.6%C$135,348.6887%
W14D92–D98C$9,328.096.0%C$144,676.7793%
W15D99–D105C$7,485.804.8%C$152,162.5798%
W16D106–D112C$1,351.560.9%C$153,514.1399%
W17D113–D119C$94.050.1%C$153,608.1899%
W18D120–D126C$716.720.5%C$154,324.90100%
W19D127–D130C$716.720.5%C$155,041.61100%

Line Items

16 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
Earthwork 1 items C$317.01
#CodeDescriptionQtyUnitUnit PriceTotal
1KAME_KAME_KAKAME_KATOCON
Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: 15 m3, soil group 3
21.6
180 m² × 0.12 = 21.6 m3(Earthwork)
m3C$11.60C$317.01
C$250.60 +15% C$37.59 +10% C$28.82
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 10.05hrsC$41.19C$2.02
Bulldozers, power 79 kW (108 hp)0.05Machine hoursC$50.27C$2.55
Personnel: 1 person-hour/machine-hour0.05Machine hoursC$30.03C$1.52
Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m30.05Machine hoursC$4,704.31C$238.79
Personnel: 3 man-hours/machine-hours0.05Machine hoursC$112.51C$5.71
Foundation 1 items C$4,172.07
#CodeDescriptionQtyUnitUnit PriceTotal
2KANE_KAME_KAKAME_RIKAConstruction of strip foundations: concrete10.8
180 m² × 0.06 = 10.8 m3(Foundation)
m3C$305.38C$4,172.07
C$3,298.08 +15% C$494.71 +10% C$379.28
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 130.46hrsC$22.99C$700.25
Water0.03m3C$121.12C$3.73
Electricity0.19kWhC$19.84C$3.73
Polyethylene film, thickness KA.MESA mm9.53m2C$40.72C$387.77
Construction nails0.00tC$245,736.51C$530.69
Quicklime, grade I0.00tC$23,495.91C$50.96
Hot-rolled wire in coils, diameter NE.TO-NE.SA mm0.00tC$169,875.74C$550.58
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III0.02m3C$38,839.30C$922.81
Tower cranes, lifting capacity 8 t2.30Machine hoursC$42.01C$96.63
Personnel: 1 person-hour/machine-hour2.30Machine hoursC$18.23C$41.93
Mobile cranes, lifting capacity 16 t0.04Machine hoursC$66.91C$2.60
Personnel: 1 person-hour/machine-hour0.04Machine hoursC$18.23C$0.71
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t0.03Machine hoursC$69.44C$1.87
Personnel: 1 person-hour/machine-hour0.03Machine hoursC$15.60C$0.42
Deep vibrators1.52Machine hoursC$0.56C$0.85
Flatbed trucks, load capacity up to 5 tons0.06Machine hoursC$25.99C$1.68
Personnel: 1 person-hour/machine-hour0.06Machine hoursC$13.57C$0.88
Structure 1 items C$8,013.85
#CodeDescriptionQtyUnitUnit PriceTotal
3KANE_MEDX_KAKAPU_KAME
Construction of reinforced concrete floors and slabs up to 200 mm thick in permanent formwork (concrete supplied in buck
9.0
180 m² × 0.05 = 9 m3(Structure)
m3C$703.90C$8,013.85
C$6,335.06 +15% C$950.26 +10% C$728.53
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 175.02hrsC$23.00C$1,800.33
Anthracene oil0.02tC$33,386.97C$540.85
Water0.02m3C$54.42C$1.40
Electricity0.35kWhC$8.91C$3.07
Polyethylene film, thickness KA.MESA mm3.86m2C$18.30C$70.64
Construction nails0.00tC$110,416.63C$99.40
Light wire, diameter ME.ME mm0.00tC$112,464.03C$202.44
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III0.11m3C$21,104.95C$2,355.24
Edged softwood board, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade III0.01m3C$17,451.64C$251.30
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III0.05m3C$17,451.64C$816.73
Tower cranes, lifting capacity 8 t2.43Machine hoursC$42.52C$103.33
Personnel: 1 person-hour/machine-hour2.43Machine hoursC$19.02C$46.22
Mobile cranes, lifting capacity 16 t0.13Machine hoursC$67.74C$8.84
Personnel: 1 person-hour/machine-hour0.13Machine hoursC$19.02C$2.49
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t0.24Machine hoursC$70.30C$16.82
Personnel: 1 person-hour/machine-hour0.24Machine hoursC$16.28C$3.90
Deep vibrators3.63Machine hoursC$0.56C$2.04
Trucks, load capacity up to 8 tons0.20Machine hoursC$37.19C$7.26
Personnel: 1 person-hour/machine-hour0.20Machine hoursC$14.16C$2.77
External Walls 1 items C$27,369.22
#CodeDescriptionQtyUnitUnit PriceTotal
4KAVO_KARI_KAMESA_KAMECON
Masonry of external and internal brick walls with an air gap: with a floor height of up to 4 m
37.8
180 m² × 0.21 = 37.8 m3(External Walls)
m3C$572.37C$27,369.22
C$21,635.75 +15% C$3,245.36 +10% C$2,488.11
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1214.33hrsC$52.98C$11,355.22
Water9.45m3C$1,000.90C$9,458.99
Tower cranes, lifting capacity 8 t12.47Machine hoursC$24.90C$310.59
Personnel: 1 person-hour/machine-hour12.47Machine hoursC$40.96C$510.95
Internal Walls 1 items C$50,961.82
#CodeDescriptionQtyUnitUnit PriceTotal
5KAVO_KATO_KAKATO_KALI
Limestone partition wall masonry: unreinforced with a floor height of up to 4 m
12.6
180 m² × 0.07 = 12.6 m3(Internal Walls)
m3C$3,197.30C$50,961.82
C$40,286.03 +15% C$6,042.90 +10% C$4,632.89
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1116.55hrsC$23.08C$2,689.95
Water1.26m3C$98.58C$124.42
Masonry mortar, cement-lime, M250.76m3C$11,042.04C$8,347.99
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III0.76m3C$38,227.34C$28,899.84
Tower cranes, lifting capacity 8 t3.65Machine hoursC$42.26C$154.42
Personnel: 1 person-hour/machine-hour3.65Machine hoursC$18.00C$69.42
Roofing 1 items C$3,847.90
#CodeDescriptionQtyUnitUnit PriceTotal
6MERI_KAME_KAKALI_KASA
Installation of tile roofs: grooved stamped or pressed (ceramic and cement-sand (concrete))
72.0
180 m² × 0.4 = 72 m2(Roofing)
m2C$42.25C$3,847.90
C$3,041.82 +15% C$456.27 +10% C$349.81
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 169.55hrsC$26.94C$1,873.59
Steel roofing nails, diameter 2-3 mm, length 20-40 mm5.62kgC$20.40C$114.57
Galvanized steel washers, round, hole diameter M16-242.57kgC$49.59C$127.46
Ready-mixed masonry mortar, cement, M1000.19m3C$1,109.11C$215.60
Galvanized sheet steel, thickness KA.LI mm0.04tC$16,816.29C$605.40
Tower cranes, lifting capacity 8 t0.98Machine hoursC$44.84C$43.90
Personnel: 1 person-hour/machine-hour0.98Machine hoursC$20.34C$19.91
Mobile cranes, lifting capacity 16 t0.26Machine hoursC$71.43C$18.52
Personnel: 1 person-hour/machine-hour0.26Machine hoursC$20.34C$5.27
Flatbed trucks, load capacity up to 5 tons0.41Machine hoursC$27.74C$11.39
Personnel: 1 person-hour/machine-hour0.41Machine hoursC$15.14C$6.21
Windows 1 items C$8,814.35
#CodeDescriptionQtyUnitUnit PriceTotal
7MEKA_KAME_KATOPU_KAME
Installation of PVC profile window blocks in residential and public buildings: deaf with an opening area of up to 2 m2
21.6
180 m² × 0.12 = 21.6 m2(Windows)
m2C$322.59C$8,814.35
C$6,967.86 +15% C$1,045.18 +10% C$801.30
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 136.15hrsC$25.69C$928.65
Electricity2.47kWhC$4.07C$10.08
Waterproofing tapes, vapor-permeable butyl rubber, made of non-woven membrane-type material, with adhesive coating on the inner edges and anti-adhesive coating, beige color, width 80 mm90.29mC$22.29C$2,012.23
Pre-compressed self-expanding polyurethane foam sealing strips with adhesive layer on one side, width 10 mm, thickness when compressed 4 mm, thickness when expanded 20 mm4.6210 mC$145.29C$671.64
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml14.90pcsC$164.80C$2,456.08
Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm6.6110 pcsC$66.43C$439.13
Plastic mounting wedges1.73100 pcsC$239.59C$414.00
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.38Machine hoursC$2.53C$0.96
Personnel: 1 person-hour/machine-hour0.38Machine hoursC$13.31C$5.05
Flatbed trucks, load capacity up to 5 tons0.71Machine hoursC$27.44C$19.44
Personnel: 1 person-hour/machine-hour0.71Machine hoursC$14.97C$10.61
Doors 1 items C$3,307.17
#CodeDescriptionQtyUnitUnit PriceTotal
8MEKA_KAME_KAPURI_KARI
Filling balcony openings in wooden log walls with caulking door blocks with door leaves: paired, opening area over 3 m2
5.4
180 m² × 0.03 = 5.4 m2(Doors)
m2C$484.14C$3,307.17
C$2,614.37 +15% C$392.15 +10% C$300.65
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 115.98hrsC$27.56C$440.52
Water0.04m3C$89.18C$3.20
Electricity0.42kWhC$14.60C$5.95
Resin-impregnated tow5.78kgC$273.67C$1,581.20
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm0.00tC$269,731.24C$145.49
Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade III0.01m3C$34,581.82C$429.61
Flatbed trucks, load capacity up to 5 tons0.21Machine hoursC$26.15C$5.41
Personnel: 1 person-hour/machine-hour0.21Machine hoursC$14.41C$2.98
Flooring 1 items C$5,248.03
#CodeDescriptionQtyUnitUnit PriceTotal
9SALI_KAME_KAMEME_KASA
Installation of bases for floor covering: from chipboard with an area of up to 20 m2
153.0
180 m² × 0.85 = 153 m2(Flooring)
m2C$27.12C$5,248.03
C$4,148.64 +15% C$622.30 +10% C$477.09
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 170.47hrsC$23.24C$1,638.08
Plywood boards type P1, standard unpolished, formaldehyde emission class E1, without facing, grade II, thickness 15-17 mm1.56100 m2C$514.05C$802.22
KN-2 rubber adhesive mastic203.49kgC$8.36C$1,701.15
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.15Machine hoursC$2.37C$0.36
Personnel: 1 person-hour/machine-hour0.15Machine hoursC$12.66C$1.93
Flatbed trucks, load capacity up to 5 tons0.12Machine hoursC$25.68C$3.15
Personnel: 1 person-hour/machine-hour0.12Machine hoursC$14.24C$1.75
Bathroom 1 items C$376.21
#CodeDescriptionQtyUnitUnit PriceTotal
10NETO_KATO_KAKAME_KASARemoving wall coverings: made of glazed ceramic tiles18.0
180 m² × 0.1 = 18 m2(Bathroom)
m2C$16.52C$376.21
C$297.40 +15% C$44.61 +10% C$34.20
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average work load RI.ME13.37hrsC$22.01C$294.30
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.06Machine hoursC$2.36C$0.15
Personnel: 1 person-hour/machine-hour0.06Machine hoursC$12.64C$0.79
Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 5 m3/min0.30Machine hoursC$7.03C$2.08
Pneumatic jackhammers powered by mobile compressors0.59Machine hoursC$0.14C$0.08
Plastering 1 items C$14,658.42
#CodeDescriptionQtyUnitUnit PriceTotal
11NEME_KAME_KAKAME_KADX
Continuous leveling of interior surfaces (single-layer plastering) with dry mortar mixtures up to 10 mm thick for subseq
288.0
180 m² × 1.6 = 288 m2(Plastering)
m2C$40.23C$14,658.42
C$11,587.68 +15% C$1,738.15 +10% C$1,332.58
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Average work load RI.DX103.19hrsC$23.34C$2,408.96
Water1.47m3C$6,228.23C$9,138.96
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t0.06Machine hoursC$68.67C$3.95
Personnel: 1 person-hour/machine-hour0.06Machine hoursC$16.17C$0.93
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.60Machine hoursC$2.37C$1.43
Personnel: 1 person-hour/machine-hour0.60Machine hoursC$12.50C$7.56
Mobile mortar mixers, drum capacity 65 l2.04Machine hoursC$0.16C$0.32
Personnel: 1 person-hour/machine-hour2.04Machine hoursC$12.50C$25.57
Painting 1 items C$1,433.43
#CodeDescriptionQtyUnitUnit PriceTotal
12NERI_KAME_KAKARI_KAME
Simple oil painting of previously painted walls: without preparation, with removal of old paint up to 10%
288.0
180 m² × 1.6 = 288 m2(Painting)
m2C$3.93C$1,433.43
C$1,133.15 +15% C$169.97 +10% C$130.31
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 138.88hrsC$24.44C$950.30
Colored cotton rags0.46kgC$372.18C$171.46
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m0.29Machine hoursC$2.41C$0.69
Personnel: 1 person-hour/machine-hour0.29Machine hoursC$12.82C$3.70
Flatbed trucks, load capacity up to 5 tons0.17Machine hoursC$26.10C$4.51
Personnel: 1 person-hour/machine-hour0.17Machine hoursC$14.42C$2.50
Electrical 1 items C$2,892.89
#CodeDescriptionQtyUnitUnit PriceTotal
13KAVO_KASA_KAPUME_KAMEm
Electrical wiring in chambers: cable or wire with band fasteners
540.0
180 m² × 3 = 540 m(Electrical)
mC$4.23C$2,892.89
C$2,286.87 +15% C$343.03 +10% C$262.99
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 175.92hrsC$26.69C$2,026.56
Electricity5.18kWhC$0.30C$1.53
Plastic mounting tapes for wire bundling, fastened with plastic buttons, width 10 mm1.6210 mC$2.51C$4.06
Polypropylene expansion anchors5.51100 pcsC$2.18C$12.03
Copper cable lugs for electrical installations0.11100 pcsC$540.09C$58.33
Mobile cranes, lifting capacity 16 t1.35Machine hoursC$65.72C$88.72
Personnel: 1 person-hour/machine-hour1.35Machine hoursC$19.02C$25.68
Non-tipping wagons, capacity TO.TO m31.67Machine hoursC$0.83C$1.38
Flatbed trucks, load capacity up to 10 tons1.35Machine hoursC$36.64C$49.47
Personnel: 1 person-hour/machine-hour1.35Machine hoursC$14.16C$19.12
Plumbing 1 items C$6,668.93
#CodeDescriptionQtyUnitUnit PriceTotal
14MENE_KATO_KAKARI_KARI
Laying water supply pipelines using multilayer metal-polymer pipes with a diameter of: 20 mm
144.0
180 m² × 0.8 = 144 m(Plumbing)
mC$36.61C$6,668.93
C$5,271.89 +15% C$790.78 +10% C$606.27
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1148.32hrsC$27.31C$4,051.08
Water0.68m3C$114.81C$77.75
Electricity3.41kWhC$18.80C$64.21
Corrugated protective pipes15.84mC$66.31C$1,050.28
Tower cranes, lifting capacity 8 t0.06Machine hoursC$41.72C$2.40
Personnel: 1 person-hour/machine-hour0.06Machine hoursC$19.18C$1.10
Mobile cranes, lifting capacity 16 t0.04Machine hoursC$66.45C$2.87
Personnel: 1 person-hour/machine-hour0.04Machine hoursC$19.18C$0.83
Flatbed trucks, load capacity up to 5 tons0.53Machine hoursC$25.81C$13.75
Personnel: 1 person-hour/machine-hour0.53Machine hoursC$14.28C$7.61
Heating 1 items C$3,767.59
#CodeDescriptionQtyUnitUnit PriceTotal
15MENE_KARI_KAKAME_KARI
Laying heating pipelines made of steel water and gas pipes, non-galvanized, with a diameter of: 20 mm
360.0
180 m² × 2 = 360 m(Heating)
mC$8.27C$3,767.59
C$2,978.33 +15% C$446.75 +10% C$342.51
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 1106.92hrsC$26.83C$2,868.89
Technical gaseous oxygen1.01m3C$6.61C$6.67
Water1.58m3C$1.82C$2.88
Linen thread0.22kgC$7.71C$1.67
MA-0115 oil paint, mummy, iron minium1.58kgC$5.14C$8.14
Tower cranes, lifting capacity 8 t0.29Machine hoursC$41.47C$11.94
Personnel: 1 person-hour/machine-hour0.29Machine hoursC$19.12C$5.50
Mobile cranes, lifting capacity 16 t0.25Machine hoursC$66.07C$16.65
Personnel: 1 person-hour/machine-hour0.25Machine hoursC$19.12C$4.82
Flatbed trucks, load capacity up to 5 tons1.26Machine hoursC$25.66C$32.33
Personnel: 1 person-hour/machine-hour1.26Machine hoursC$14.23C$17.93
Gas welding and cutting equipment4.14Machine hoursC$0.22C$0.90
Insulation 1 items C$13,192.72
#CodeDescriptionQtyUnitUnit PriceTotal
16RINE_KAME_KANETO_KAME
Insulation of interior walls on wood with spray guns using liquid thermal insulation coating 1 mm thick
99.0
180 m² × 0.55 = 99 m2(Insulation)
m2C$105.34C$13,192.72
C$10,429.03 +15% C$1,564.35 +10% C$1,199.34
Labor Materials Equipment
TypeResourceQtyUnitUnit PriceCost
Worker Category 117.93hrsC$25.73C$461.28
Water0.02m3C$484.88C$9.95
Electricity7.37kWhC$79.41C$584.61
Antiseptic for protecting wooden building structures from biological decay0.01tC$946,571.79C$9,371.20
Flatbed trucks, load capacity up to 5 tons0.05Machine hoursC$25.89C$1.28
Personnel: 1 person-hour/machine-hour0.05Machine hoursC$14.29C$0.71
Cost Summary
Direct Cost79%C$122,562.56
Overhead+15%C$18,384.36
Profit+10%C$14,094.68
Grand TotalC$155,041.60

Resource Summary

54 resourcesiAggregated materials, labor, and equipment needed for the entire project
Materials to Order (34)
ResourceUnitQtyUnit PriceCost
Edged coniferous timber (spruce, pine), natural moisture content, lengm30.88C$36,005.33C$31,684.69
Waterm314.55C$1,293.49C$18,821.28
Antiseptic for protecting wooden building structures from biological dt0.01C$946,585.86C$9,371.20
Masonry mortar, cement-lime, M25m30.76C$11,042.31C$8,347.99
Polyurethane foam sealant (assembly foam), universal, volume 1000 mlpcs14.90C$164.79C$2,456.08
Waterproofing tapes, vapor-permeable butyl rubber, made of non-woven mm90.29C$22.29C$2,012.23
Edged softwood boards, natural moisture content, length RI-NE.SA m, wim30.07C$24,639.38C$1,739.54
KN-2 rubber adhesive mastickg203.49C$8.36C$1,701.15
Resin-impregnated towkg5.78C$273.66C$1,581.20
Corrugated protective pipesm15.84C$66.31C$1,050.28
Plywood boards type P1, standard unpolished, formaldehyde emission cla100 m21.56C$514.05C$802.22
ElectricitykWh19.39C$34.72C$673.18
Pre-compressed self-expanding polyurethane foam sealing strips with ad10 m4.62C$145.30C$671.64
Construction nailst0.00C$203,254.84C$630.09
Galvanized sheet steel, thickness KA.LI mmt0.04C$16,816.67C$605.40
Hot-rolled wire in coils, diameter NE.TO-NE.SA mmt0.00C$172,056.25C$550.58
Anthracene oilt0.02C$33,385.80C$540.85
Polyethylene film, thickness KA.MESA mmm213.39C$34.24C$458.41
Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm10 pcs6.61C$66.44C$439.13
Plastic mounting wedges100 pcs1.73C$239.58C$414.00
Edged softwood board, natural moisture content, length RI-NE.SA m, widm30.01C$17,451.39C$251.30
Ready-mixed masonry mortar, cement, M100m30.19C$1,109.05C$215.60
Light wire, diameter ME.ME mmt0.00C$112,466.67C$202.44
Colored cotton ragskg0.46C$372.09C$171.46
Self-tapping steel screws, oxidized, with countersunk head and cross-st0.00C$290,980.00C$145.49
Galvanized steel washers, round, hole diameter M16-24kg2.57C$49.59C$127.46
Steel roofing nails, diameter 2-3 mm, length 20-40 mmkg5.62C$20.40C$114.57
Copper cable lugs for electrical installations100 pcs0.11C$540.09C$58.33
Quicklime, grade It0.00C$23,163.64C$50.96
Polypropylene expansion anchors100 pcs5.51C$2.18C$12.03
Grand TotalC$85,921.32
Labor Requirements (5)
ResourceUnitQtyUnit PriceCost
Worker Category 1hrs1,016.54C$31.27C$31,786.72
Average work load RI.DXhrs103.19C$23.34C$2,408.96
Personnel: 1 person-hour/machine-hourMachine hours33.24C$25.85C$859.27
Average work load RI.MEhrs13.37C$22.01C$294.30
Personnel: 3 man-hours/machine-hoursMachine hours0.05C$112.40C$5.71
Grand TotalC$35,354.96
Equipment Requirements (15)
ResourceUnitQtyUnit PriceCost
Tower cranes, lifting capacity 8 tMachine hours22.18C$32.60C$723.21
Single-bucket electric walking excavators with dragline working equipmMachine hours0.05C$4,700.59C$238.79
Mobile cranes, lifting capacity 16 tMachine hours2.07C$66.64C$138.20
Flatbed trucks, load capacity up to 5 tonsMachine hours3.53C$26.34C$92.94
Flatbed trucks, load capacity up to 10 tonsMachine hours1.35C$36.64C$49.47
Universal front-end pneumatic wheeled single-bucket loaders, nominal cMachine hours0.32C$69.88C$22.64
Trucks, load capacity up to 8 tonsMachine hours0.20C$37.17C$7.26
Single-mast hoists, load capacity up to 500 kg, lifting height 45 mMachine hours1.49C$2.41C$3.59
Deep vibratorsMachine hours5.15C$0.56C$2.89
Bulldozers, power 79 kW (108 hp)Machine hours0.05C$50.20C$2.55
Mobile screw compressors with electric motor, pressure up to 1 MPa (10Machine hours0.30C$7.05C$2.08
Non-tipping wagons, capacity TO.TO m3Machine hours1.67C$0.82C$1.38
Gas welding and cutting equipmentMachine hours4.14C$0.22C$0.90
Mobile mortar mixers, drum capacity 65 lMachine hours2.04C$0.16C$0.32
Pneumatic jackhammers powered by mobile compressorsMachine hours0.59C$0.14C$0.08
Grand TotalC$1,286.30

Material Alternatives

iAlternative materials with approximate price difference. Percentages show material cost change relative to the current specification.
Insulation of interior walls on wood with spray guns usC$9,965.76
XPS foam board+30%Cellulose fiber-15%Spray foam+50%
Installation of PVC profile window blocks in residentiaC$6,003.15
Triple-glazed PVC+35%Aluminum frame+25%Timber frame+45%
Construction of reinforced concrete floors and slabs upC$4,341.07
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Installation of bases for floor covering: from chipboarC$2,503.37
Vinyl/LVT-35%Natural stone+100%Polished concrete-30%
Construction of strip foundations: concreteC$2,450.26
High-strength concrete+20%Lightweight concrete+15%Recycled aggregate-10%
Laying water supply pipelines using multilayer metal-poC$1,192.24
Copper pipe+120%PEX pipe-15%Stainless steel+200%

Risk Analysis

Monte Carlo · 10KiMonte Carlo simulation (10,000 iterations) showing completion probability at different confidence levels
150days
P50
50% probability the project finishes within this timeframe. Median scenario based on Monte Carlo simulation.
157days
P80
80% probability — recommended planning basis. Accounts for common delays and uncertainties.
164days
P95
95% probability — conservative estimate. Covers nearly all risk scenarios including severe delays.
+19days
Buffer
Recommended time buffer to add to the deterministic schedule. Covers typical construction uncertainties.
Base Cost (P50)
C$155,041.60
Budget (P80)
C$162,780.20
Maximum (P95)
C$170,196.35
Contingency
+5.0%
Recommended cost reserve based on schedule risk analysis — C$7,738.60
Recommended Budget: C$162,780.20
Deterministic 138 days
P50 150 days
P80 157 days
P95 164 days
P50 P80 P95
Based on Monte Carlo simulation with 10,000 iterations using PERT distribution for each phase duration.
Peak: 6
1,166 man-hours
12 crit. phases

Cost Risk Analysis

Monte Carlo · 10,000 iterations

Monte Carlo simulation of construction cost uncertainty

Cost Percentiles

C$192,798.88
P10
C$195,536.03
P25
C$198,832.62
P50
C$203,169.83
P80
C$205,396.99
P90

Cumulative Probability (S-Curve)

+2.2%
Recommended Contingency (P80 − P50)
Reserve to cover likely cost overruns with 80% confidence — C$4,337.21

Top Risk Drivers

CategoryWork ItemRisk Share
Internal WallsLimestone partition wall masonry: unreinforced wit
64.5%
External WallsMasonry of external and internal brick walls with
18.8%
InsulationInsulation of interior walls on wood with spray gu
4.9%
PlasteringContinuous leveling of interior surfaces (single-l
3.4%
PlumbingLaying water supply pipelines using multilayer met
2.1%
WindowsInstallation of PVC profile window blocks in resid
2.0%
StructureConstruction of reinforced concrete floors and sla
1.4%
FoundationConstruction of strip foundations: concrete
0.7%

Sensitivity Analysis

±10%iImpact of ±10% change in each cost component on the total project cost

This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.

Decrease ← → IncreaseImpact
Materials55% of total
±C$8,592.13±5.5%
Labor23% of total
±C$3,535.49±2.3%
Overhead12% of total
±C$1,838.44±1.2%
Profit9% of total
±C$1,409.47±0.9%
Equipment1% of total
±C$128.63±0.1%

Cost Summary

iFinal cost breakdown with direct costs, overhead, profit, and grand total
LaborC$35,354.9523%
MaterialsC$85,921.3055%
EquipmentC$1,286.311%
Direct CostC$122,562.56
OverheadC$18,384.3612%
ProfitC$14,094.689%
Grand TotalC$155,041.60100%
EUR equivalent€96.719,65
USD equivalent$111,469.40
GBP equivalent£84,390.80

Estimate Classification

AACE 18R-97

AACE International Recommended Practice 18R-97

3
ClassClass 3
Typical PurposeBudget Authorization
Expected Accuracy Range: -20% / +30%
Project Definition Level: 10–40%

Cost Benchmark

Residential · North America

Comparison of estimated cost/m² against market reference ranges

Low
1,500
▲ Typical
2,200
High
3,500
▼ Your Estimate
549 EUR/m²
Significantly below range · 0.25x ratio to typical

Methodology & Assumptions

iCalculation methodology, data sources, and key assumptions underlying this estimate
Data SourceDDC Pricing DB — English
Confidence Level50%
Overhead Rate15%
Profit Rate10%
Items Matched16
Assumptions
  • Costs adjusted by location-specific labor, material, and equipment factors
  • Exchange rates are offline reference rates and may differ from market rates
  • All amounts exclude VAT / sales tax
  • This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
  • All labor, materials, and equipment per defined scope
  • Overhead and profit margins as specified
  • Location-adjusted pricing factors applied
Excluded from Estimate
  • VAT / sales tax
  • Permits, licenses, and legal fees
  • Temporary works and site facilities
  • Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied

Frequently Asked Questions

How much does Two-Storey House Construction cost?
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 78 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 78 work items covering Site & Earthworks, Foundations & Ground Floor, Superstructure, Roof, Openings, External Finishes. Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Two-Storey House Construction take?
Duration depends on project size and complexity. A typical 180 m² GFA (90+90) project takes approximately 13 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a two-storey house construction include?
Complete construction estimate for a 200 m² two-storey house. Includes foundations, ground and first floor structure, load-bearing walls, staircase, roof framing and covering, full MEP installations, insulation and vapour barrier, interior and exterior finishes, two bathrooms, kitchen, and landscaping.

Get a Personalized Estimate for Your Project

Enter your area, city, and specific requirements to get a detailed cost estimate with local pricing, project timeline, and cost breakdown.

Calculate Cost for My Project →