Water Supply Network Cost Estimate — 300 m pipeline
300 m pipeline27 work items6 sectionsToronto, Canada
About This Project
Professional estimate for installing a 500-metre water supply network. Includes trench excavation, ductile iron and PVC pipe laying, valve chambers, fire hydrants, thrust blocks, service connections, pressure testing, disinfection, backfill, and surface reinstatement. Based on Canadian municipal water infrastructure standards.
Data Source:DDC Pricing DB — English·55,719 items·CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%
Cost Breakdown
iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$668,667.51Direct Cost
Labor (28%)C$48,528.35
Materials (44%)C$77,027.68
Equipment (7%)C$13,063.06
Overhead (57%)C$100,300.13
Profit (44%)C$76,896.74
Cost / m²
Labor
C$161.76
Materials
C$256.76
Equipment
C$43.54
Overhead
C$334.33
Profit
C$256.32
Grand Total
C$584.51
Materials / Labor
1.59
Direct Cost %
381.3%
20 work items across 6 categories, 87 resources
Cost Flow
6iVisual flow of the total budget through work categories, showing proportional cost distribution
Complete BOQ: 27 work items for Water Supply Network
3 work item(s) not found in pricing DB for language 'en'.
Categories
6iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
Category
Cost
Cost / m²
Share
Chambers
C$626,726.33
C$2,089.09
357.4%
Excavation
C$65,714.09
C$219.05
37.5%
Preparation
C$611.36
C$2.04
0.3%
Pipe Installation
C$109,436.26
C$364.79
62.4%
Testing & Commissioning
C$19,103.98
C$63.68
10.9%
Backfill & Reinstatement
C$24,272.32
C$80.91
13.8%
Top Items
Description
Total
Laying water supply pipelines from pressure polyethylen…
C$47,019.20
Installation of external adhesive waterproofing of gutt…
C$24,071.90
Air release valve, diameter: 1500 mm
C$21,848.10
Laying chrysotile cement pipes in horizontal tunnels: w…
C$17,843.24
Installation of steel gate valves or check valves with …
C$14,898.54
What-If Scenarios
iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$157,817.78
↓ C$17,535.31 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$175,353.09
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$201,656.05
↑ C$26,302.96 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor0%
Materials0%
Equipment0%
Custom Scenario Total Cost
C$175,353.09
Clicking Apply will update PPP coefficients and recalculate all line items
Project Schedule
≈2 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
2
months
63
days
7
phases
2
Critical Path
9
Peak workers
1,961
Labor Hours
Site PreparationEarthworksStructural FrameworkRoofing SystemMEP Rough-inLandscaping and Site WorkTesting and CommissioningCumulative Cost
Labor Hours by Phase
Structural Framework
696 hours
MEP Rough-in
424 hours
Earthworks
302 hours
Testing and Commissi
230 hours
Roofing System
186 hours
Landscaping and Site
124 hours
Site Preparation
50 hours
Monthly Cash Flow
3 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
56%
M1
98%
M2
100%
M3
Month
days
Monthly Cost
%
Cumulative
%
M1
1–30
C$97,719.25
55.7%
C$97,719.25
56%
M2
31–60
C$73,621.85
42.0%
C$171,341.11
98%
M3
61–63
C$4,011.98
2.3%
C$175,353.09
100%
Daily Cash Flow
9 weeks
1%
D1
8%
D7
19%
D13
31%
D19
44%
D25
58%
D31
70%
D37
77%
D43
85%
D49
94%
D55
98%
D61
100%
D63
Week
days
Weekly Cost
%
Cumulative
%
W1
D1–D7
C$14,129.40
8.1%
C$14,129.40
8%
W2
D8–D14
C$21,047.36
12.0%
C$35,176.76
20%
W3
D15–D21
C$26,641.88
15.2%
C$61,818.64
35%
W4
D22–D28
C$27,922.70
15.9%
C$89,741.34
51%
W5
D29–D35
C$27,922.70
15.9%
C$117,664.04
67%
W6
D36–D42
C$14,981.66
8.5%
C$132,645.70
76%
W7
D43–D49
C$16,299.88
9.3%
C$148,945.58
85%
W8
D50–D56
C$17,046.22
9.7%
C$165,991.80
95%
W9
D57–D63
C$9,361.29
5.3%
C$175,353.09
100%
Line Items
20 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
▼Preparation3 itemsC$611.36
#
Code
Description
Qty
Unit
Unit Price
Total
1
KALI_KASA_KATOLI_KAME
Installation of utility service starter blocks
1.0
1 set(Preparation)
pcs
C$17.90
C$22.65
C$17.90 +15% C$2.69+10% C$2.06
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
2nd grade worker
0.37
hrs
C$17.38
C$6.44
Grade 3 worker
0.08
hrs
C$18.98
C$1.56
Mobile cranes, lifting capacity 16 t
0.09
Machine hours
C$66.77
C$5.87
Personnel: 1 person-hour/machine-hour
0.09
Machine hours
C$15.24
C$1.34
Flatbed trucks, load capacity up to 5 tons
0.07
Machine hours
C$25.93
C$1.87
Personnel: 1 person-hour/machine-hour
0.07
Machine hours
C$11.34
C$0.82
2
KADX_KAVO_KAKATO_KAME
Installation of an automatic road barrier for traffic control with a width of up to: 4 m
1.0
1 set(Preparation)
set
C$317.73
C$401.93
C$317.74 +15% C$47.66+10% C$36.54
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
5.67
hrs
C$35.54
C$201.53
Natural sand for construction works, class II, medium
0.05
m3
C$55.12
C$2.76
Hot-rolled reinforcing steel with periodic profile, class A-II, diameter 10 mm
0.01
t
C$3,917.27
C$39.18
Edged softwood board, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 25 mm, grade III
0.08
m3
C$901.59
C$72.13
Mobile gravity concrete mixers, drum capacity 350 l
0.12
Machine hours
C$0.55
C$0.07
Personnel: 1 person-hour/machine-hour
0.12
Machine hours
C$17.34
C$2.08
3
MEKA_MEKA_KAKADX_KATOm
Setting up and adjusting the traffic intensity measurement point
1.0
1 set(Preparation)
set
C$147.66
C$186.78
C$147.65 +15% C$22.15+10% C$16.98
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Grade 5 worker
1.97
hrs
C$20.59
C$40.57
Auto hydraulic lifts, lifting height 22 m
1.88
Machine hours
C$46.03
C$86.53
Personnel: 1 person-hour/machine-hour
1.88
Machine hours
C$10.93
C$20.55
▼Excavation2 itemsC$24,520.47
#
Code
Description
Qty
Unit
Unit Price
Total
4
RINE_KAME_KASALI_KARI
Waterproofing of underground and engineering structures: vertical surfaces up to 3 m high
5.0
5 days(Excavation)
m2
C$70.92
C$448.57
C$354.61 +15% C$53.19+10% C$40.78
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
1.92
hrs
C$25.56
C$49.06
Propane-butane technical mixture
0.01
kg
C$31,393.80
C$302.99
Cranes on crawler tracks, load capacity 50 t
0.01
Machine hours
C$110.11
C$1.54
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$20.35
C$0.29
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.00
Machine hours
C$69.06
C$0.07
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$16.32
C$0.02
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$25.85
C$0.13
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$14.19
C$0.07
Gas injection burners
1.00
Machine hours
C$0.39
C$0.39
Construction and installation guns
0.40
Machine hours
C$0.11
C$0.05
5
RIDX_KARI_KASASA_KARI
Installation of external adhesive waterproofing of gutters in excavations: in 4 layers of waterproofing material
80.0
80 m³(Excavation)
m2
C$237.86
C$24,071.90
C$19,029.17 +15% C$2,854.38+10% C$2,188.35
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
183.99
hrs
C$30.47
C$5,606.32
Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V
1.53
t
C$7,518.27
C$11,487.93
Gravel M 400-1000, fraction 5(3)-10 mm
1.84
m3
C$685.18
C$1,260.71
Heavy concrete wall blocks, dimensions 390x190x188 mm, grade 200
0.02
m3
C$1,609.41
C$38.62
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III
0.07
m3
C$3,668.31
C$264.11
Mobile cranes, lifting capacity 16 t
0.35
Machine hours
C$74.27
C$26.14
Personnel: 1 person-hour/machine-hour
0.35
Machine hours
C$21.40
C$7.54
Mobile electric bitumen boilers with centrifugal agitator, loading capacity 1000 l
32.11
Machine hours
C$8.11
C$260.28
Flatbed trucks, load capacity up to 10 tons
1.35
Machine hours
C$41.41
C$55.98
Personnel: 1 person-hour/machine-hour
1.35
Machine hours
C$15.93
C$21.54
▼Pipe Installation9 itemsC$109,436.26
#
Code
Description
Qty
Unit
Unit Price
Total
6
KALI_KAME_KASAPU_MEPU
Installation of sand cushions 30 cm thick
300.0
300 m(Pipe Installation)
m
C$12.87
C$4,884.59
C$3,861.34 +15% C$579.20+10% C$444.05
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
133.80
hrs
C$20.34
C$2,721.33
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
2.16
Machine hours
C$68.67
C$148.32
Personnel: 1 person-hour/machine-hour
2.16
Machine hours
C$16.18
C$34.96
Pneumatic rammers powered by mobile compressor units
2.40
Machine hours
C$0.13
C$0.30
Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 5 m3/min
2.40
Machine hours
C$7.05
C$16.92
Installation of sand cushions 30 cm thick
300.00
m
C$3.13
C$939.51
7
MENE_KAPU_KAKARI_KADX
Laying water supply pipelines from pressure polyethylene pipes with an outer diameter: 110 mm
300.0
300 m(Pipe Installation)
m
C$123.90
C$47,019.20
C$37,169.33 +15% C$5,575.40+10% C$4,274.47
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
333.00
hrs
C$26.57
C$8,849.21
Water
42.75
m3
C$492.07
C$21,034.96
Cartridges for construction and installation gun, red tip, length 10-18 mm
0.12
1000 pcs
C$57,613.28
C$6,912.35
Unslaked chlorinated lime for construction, grade A
0.15
kg
C$1,073.21
C$161.57
Tower cranes, lifting capacity 8 t
0.33
Machine hours
C$41.65
C$13.74
Personnel: 1 person-hour/machine-hour
0.33
Machine hours
C$19.15
C$6.32
Mobile cranes, lifting capacity 16 t
0.21
Machine hours
C$66.35
C$13.93
Personnel: 1 person-hour/machine-hour
0.21
Machine hours
C$19.15
C$4.02
Flatbed trucks, load capacity up to 5 tons
1.44
Machine hours
C$25.77
C$37.11
Personnel: 1 person-hour/machine-hour
1.44
Machine hours
C$14.25
C$20.52
Semi-automatic butt welding machines for plastic pipes with a diameter of up to 160 mm
36.90
Machine hours
C$3.13
C$115.59
8
RIRI_KATO_KAKARI_KARI
Installation of polyethylene fittings: tees
15.0
15 pcs(Pipe Installation)
pcs
C$42.34
C$803.34
C$635.05 +15% C$95.26+10% C$73.03
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
9.16
hrs
C$25.30
C$231.83
Mobile cranes, lifting capacity 16 t
0.01
Machine hours
C$66.23
C$0.99
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$19.10
C$0.29
Flatbed trucks, load capacity up to 5 tons
0.03
Machine hours
C$25.72
C$0.78
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$14.21
C$0.43
Semi-automatic butt welding machines for plastic pipes with a diameter of over 160 to 315 mm
4.95
Machine hours
C$5.09
C$25.20
Installation of polyethylene fittings: tees
15.00
pcs
C$25.04
C$375.53
9
MENE_KALI_KAKATO_KAPU
Connection to existing internal heating and water supply pipe networks with a diameter of: 32 mm
20.0
20 pcs(Pipe Installation)
pcs
C$166.55
C$4,213.61
C$3,330.92 +15% C$499.64+10% C$383.06
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
89.20
hrs
C$28.57
C$2,548.22
Acetylene gas, technical grade
0.20
m3
C$174.29
C$34.84
Technical gaseous oxygen
0.80
m3
C$46.52
C$37.20
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm
3.00
kg
C$43.10
C$129.32
Galvanized welded steel pipes for water and gas pipelines with threaded ends, standard, nominal diameter 32 mm, wall thickness TO.RI mm
8.00
m
C$69.78
C$558.28
Flatbed trucks, load capacity up to 5 tons
0.20
Machine hours
C$26.40
C$5.28
Personnel: 1 person-hour/machine-hour
0.20
Machine hours
C$14.71
C$2.94
Gas welding and cutting equipment
9.80
Machine hours
C$0.23
C$2.22
Welding machines for manual arc welding, welding current up to 350 A
8.60
Machine hours
C$1.47
C$12.62
10
RIRI_KATO_KAKALI_KADX
Installation of steel gate valves or check valves with a diameter of: 600 mm
4.0
4 pcs(Pipe Installation)
pcs
C$2,944.38
C$14,898.54
C$11,777.50 +15% C$1,766.63+10% C$1,354.41
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
78.40
hrs
C$28.33
C$2,221.45
Steel bolts with hexagonal head, complete with hexagonal nut and flat round washer, thread diameter M36, bolt length 60-300 mm
0.28
t
C$28,943.75
C$8,104.25
Rubber gaskets (pressed technical plate)
2.24
kg
C$35.69
C$79.95
Mobile cranes, lifting capacity 16 t
1.12
Machine hours
C$80.55
C$90.21
Personnel: 1 person-hour/machine-hour
1.12
Machine hours
C$21.14
C$23.68
Pipe layers, nominal load capacity MERI.SA t
6.72
Machine hours
C$141.12
C$948.35
Personnel: 1 person-hour/machine-hour
6.72
Machine hours
C$22.56
C$151.63
Flatbed trucks, load capacity up to 5 tons
3.36
Machine hours
C$31.28
C$105.11
Personnel: 1 person-hour/machine-hour
3.36
Machine hours
C$15.74
C$52.87
11
MENE_KALI_KAKAME_KAME
Installation of 50 mm diameter fire hydrants
2.0
2 pcs(Pipe Installation)
pcs
C$132.47
C$335.15
C$264.94 +15% C$39.74+10% C$30.47
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
1.80
hrs
C$26.80
C$48.25
Electricity
0.20
kWh
C$0.30
C$0.06
Linen thread
0.02
kg
C$7.70
C$0.16
MA-0115 oil paint, mummy, iron minium
0.06
kg
C$5.14
C$0.31
Fire valve 50-10 for water, nominal pressure ME.KA MPa, nominal diameter 50 mm
2.00
pcs
C$55.67
C$111.35
Fire hose connection head, pressure hose GR, pressure ME.RI MPa, diameter 50 mm
6.00
pcs
C$4.68
C$28.09
Pressure fire hose with chemical or natural fiber reinforcement for fire hydrants without RPK-SAKA-ME.KA heads
20.00
m
C$2.69
C$53.86
Hand-held fire hose nozzle, diameter 50 mm
2.00
pcs
C$10.04
C$20.07
Tower cranes, lifting capacity 8 t
0.02
Machine hours
C$41.33
C$0.83
Personnel: 1 person-hour/machine-hour
0.02
Machine hours
C$19.10
C$0.38
Flatbed trucks, load capacity up to 5 tons
0.04
Machine hours
C$25.57
C$1.02
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$14.22
C$0.57
12
MENE_KARI_KARIKA_RIKAm
Air release valve, diameter: 1500 mm
2.0
2 pcs(Pipe Installation)
pcs
C$8,635.61
C$21,848.10
C$17,271.23 +15% C$2,590.68+10% C$1,986.19
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
456.00
hrs
C$25.93
C$11,824.96
General-purpose asbestos cord, diameter 18-25 mm
0.02
t
C$15,891.49
C$317.83
General-purpose asbestos cardboard, grade KAON-1, thickness 4 and 6 mm
0.02
t
C$2,265.61
C$45.31
Acetylene gas, technical grade
3.80
m3
C$22.93
C$87.13
Technical gaseous oxygen
12.60
m3
C$6.12
C$77.12
Electricity
6.40
kWh
C$0.28
C$1.76
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm
60.20
kg
C$5.67
C$341.38
Roofing sheet steel, grade STK-1, thickness KA.SA mm
0.48
t
C$2,406.54
C$1,155.14
Electric bridge cranes, lifting capacity 10 t
52.36
Machine hours
C$13.36
C$699.40
Personnel: 1 person-hour/machine-hour
52.36
Machine hours
C$13.17
C$689.53
Mobile cranes, lifting capacity 16 t
7.84
Machine hours
C$61.13
C$479.27
Personnel: 1 person-hour/machine-hour
7.84
Machine hours
C$17.69
C$138.72
Railway cranes, lifting capacity 16 t
8.32
Machine hours
C$90.88
C$756.10
Personnel: 2 man-hours/machine-hour
8.32
Machine hours
C$32.84
C$273.19
Wide gauge platforms, load capacity 73 t
8.32
Machine hours
C$8.30
C$69.02
Gas welding and cutting equipment
4.04
Machine hours
C$0.20
C$0.82
Welding machines for manual arc welding, welding current up to 350 A
60.92
Machine hours
C$1.32
C$80.41
Mobile screw compressors with internal combustion engines, pressure up to KA.LI MPa (7 atm), capacity up to SA.PU m3/min
8.22
Machine hours
C$15.32
C$125.89
Personnel: 1 person-hour/machine-hour
8.22
Machine hours
C$13.17
C$108.25
13
NENE_KAME_KARINE_MEKA
Dismantling of gate valves with a diameter of: up to 800 mm
2.0
2 pcs(Pipe Installation)
pcs
C$547.03
C$1,383.99
C$1,094.06 +15% C$164.11+10% C$125.82
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
27.80
hrs
C$20.42
C$567.58
Mobile cranes, lifting capacity 16 t
6.30
Machine hours
C$66.19
C$416.97
Personnel: 1 person-hour/machine-hour
6.30
Machine hours
C$16.18
C$101.96
Flatbed trucks, load capacity up to 5 tons
0.20
Machine hours
C$25.71
C$5.14
Personnel: 1 person-hour/machine-hour
0.20
Machine hours
C$12.05
C$2.41
14
RISA_KALI_KAMENE_KARI
Reinforced anti-corrosion insulation with domestic polymer tapes by hand and laying pipelines in a trench: Du 350 mm
300.0
300 m(Pipe Installation)
m
C$37.02
C$14,049.74
C$11,106.51 +15% C$1,665.98+10% C$1,277.25
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
103.65
hrs
C$20.29
C$2,102.69
Bitumen-polymer waterproofing primer, anti-corrosion, for protecting metal structures, consumption KA.TO kg/m2
0.06
t
C$114,120.47
C$6,847.23
Pipe layers, nominal load capacity NE.TO t
32.58
Machine hours
C$52.26
C$1,702.64
Personnel: 1 person-hour/machine-hour
32.58
Machine hours
C$13.93
C$453.95
▼Chambers1 itemsC$1,289.83
#
Code
Description
Qty
Unit
Unit Price
Total
15
NEDX_KAME_KARIDX_KARI
Installation of a waste chute receiving valve
6.0
6 pcs(Chambers)
pcs
C$169.94
C$1,289.83
C$1,019.63 +15% C$152.94+10% C$117.26
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
6.00
hrs
C$24.02
C$144.15
Flatbed trucks, load capacity up to 5 tons
0.06
Machine hours
C$25.17
C$1.51
Personnel: 1 person-hour/machine-hour
0.06
Machine hours
C$14.17
C$0.85
Installation of a waste chute receiving valve
6.00
pcs
C$145.52
C$873.12
▼Backfill & Reinstatement2 itemsC$24,272.32
#
Code
Description
Qty
Unit
Unit Price
Total
16
RIDX_KAME_RIMEDX_KARI
Laying chrysotile cement pipes in horizontal tunnels: with concrete filling
300.0
300 m(Backfill & Reinstatement)
m
C$47.02
C$17,843.24
C$14,105.34 +15% C$2,115.80+10% C$1,622.11
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
146.40
hrs
C$28.73
C$4,205.71
Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V
0.06
t
C$13,229.74
C$793.80
Water
2.40
m3
C$20.13
C$48.33
Electricity
1.65
kWh
C$3.30
C$5.47
Portland cement without additives for general construction CEM 0 32.5N
0.03
t
C$3,756.45
C$112.68
Ready-mixed masonry mortar, cement, M100
0.30
m3
C$2,301.56
C$690.42
Mine props made of coniferous wood (pine, fir), length KA.DX-PU m, diameter 7-24 cm
0.78
m3
C$1,622.00
C$1,265.17
Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III
1.08
m3
C$6,455.04
C$6,971.46
Auxiliary mine winches with a pulling force of METO.LITO kN (ME.PU t)
2.01
Machine hours
C$2.47
C$4.95
Mobile electric bitumen boilers, loading capacity 1000 l
1.11
Machine hours
C$6.61
C$7.34
17
RILI_KADX_KARIRI_KATO
Installation of colored anti-skid road surface: on a curved section of road without removing existing markings
50.0
50 m²(Backfill & Reinstatement)
m2
C$101.65
C$6,429.08
C$5,082.28 +15% C$762.34+10% C$584.46
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
11.00
hrs
C$26.64
C$293.07
Polymer primer containing organic solvents and adhesive additives for preparing metal, cement-sand, concrete, and reinforced concrete surfaces before applying bitumen-polymer waterproofing materials, consumption KA.ME-KA.TO kg/m2
40.00
kg
C$17.02
C$680.99
Propane-butane technical mixture
6.00
kg
C$2.88
C$17.27
Heat-resistant paper tape for painting work with an adhesive layer on one side, beige color, width 100 mm
175.00
m
C$0.48
C$84.42
Bauxite chips, fraction 1-3 mm
500.00
kg
C$3.49
C$1,742.95
Modified epoxy resin, mass fraction of epoxy groups not less than RIME.SA%, mass fraction of volatile substances not more than ME.SA%, dynamic viscosity at 25 °C not more than PU.SA Pa*s, mass fraction of saponifiable chlorine not more than KA.NE%
50.00
kg
C$10.94
C$547.01
Coloring pigment for epoxy resin
1.00
kg
C$172.37
C$172.36
Modified amine epoxy resin hardener
50.00
kg
C$26.58
C$1,329.00
Special-purpose all-terrain vehicles, load capacity up to ME.SA tons
2.50
Machine hours
C$23.23
C$58.08
Personnel: 1 person-hour/machine-hour
2.50
Machine hours
C$16.25
C$40.61
Flatbed trucks, load capacity up to 5 tons
2.50
Machine hours
C$25.48
C$63.69
Personnel: 1 person-hour/machine-hour
2.50
Machine hours
C$14.13
C$35.33
Mobile power stations, power 2 kW
1.00
Machine hours
C$3.36
C$3.36
Personnel: 1 person-hour/machine-hour
1.00
Machine hours
C$14.13
C$14.13
▼Testing & Commissioning3 itemsC$15,222.85
#
Code
Description
Qty
Unit
Unit Price
Total
18
RISA_MERI_KAKASA_KARI
Installation and dismantling of a temporary connection unit for filling and pressure testing units during flushing and t
1.0
1 set(Testing & Commissioning)
unit
C$11,058.88
C$13,989.48
C$11,058.88 +15% C$1,658.83+10% C$1,271.77
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
103.75
hrs
C$22.43
C$2,327.55
Technical gaseous oxygen
1.11
m3
C$5.79
C$6.43
Propane-butane technical mixture
0.26
kg
C$2.54
C$0.66
Water
0.31
m3
C$1.59
C$0.49
Electricity
2.91
kWh
C$0.26
C$0.76
Steel ball valve, equal diameter, nominal diameter 50 mm
0.40
pcs
C$103.61
C$41.44
Seamless hot-rolled steel pipes with chamfered edges, steel grades 10, 20, 35, outer diameter 57 mm, wall thickness 4 mm
16.16
m
C$25.51
C$412.20
Seamless hot-rolled steel pipes with chamfered edges, steel grades 10, 20, 35, outer diameter 89 mm, wall thickness 4 mm
5.05
m
C$46.73
C$236.01
Seamless hot-formed steel pipes with chamfered edges, steel grades 10, 20, 35, outer diameter 159 mm, wall thickness 8 mm
0.08
m
C$125.56
C$10.04
90° elbow with a radius of curvature R=ME.SA Du for pressures up to 16 MPa, nominal diameter 50 mm, outer diameter 57 mm, wall thickness 4 mm
0.80
pcs
C$6.93
C$5.54
Seamless welded equal tee, nominal pressure up to 16 MPa, nominal diameter 50 mm, outer diameter and wall thickness 57.0x4.0 mm
0.30
pcs
C$14.52
C$4.35
Mobile cranes, lifting capacity 16 t
18.67
Machine hours
C$57.84
C$1,079.78
Personnel: 1 person-hour/machine-hour
18.67
Machine hours
C$16.74
C$312.53
Filling and pressure testing units, flow rate up to 70 m3/h
22.02
Machine hours
C$65.07
C$1,432.76
Personnel: 1 person-hour/machine-hour
22.02
Machine hours
C$12.46
C$274.35
Pipe layers, nominal load capacity MERI.SA t
28.85
Machine hours
C$101.33
C$2,923.41
Personnel: 1 person-hour/machine-hour
28.85
Machine hours
C$17.86
C$515.41
Welding units for manual arc welding on a tractor, welding current up to 250 A, number of stations 2, tractor power 79 kW (108 hp)
22.14
Machine hours
C$52.28
C$1,157.43
Personnel: 1 person-hour/machine-hour
22.14
Machine hours
C$14.32
C$317.16
Gas welding and cutting equipment
3.06
Machine hours
C$0.19
C$0.59
19
TOPU_KAME_RINERI_KAMEm
Installation for disinfection of sealed radioactive sources
1.0
1 set(Testing & Commissioning)
pcs
C$861.23
C$1,089.45
C$861.23 +15% C$129.18+10% C$99.04
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
32.00
hrs
C$26.88
C$860.13
Electricity
3.70
kWh
C$0.30
C$1.10
20
KALI_KAPU_KAPUME_KAME
Chemical analysis
3.0
3 pcs(Testing & Commissioning)
pcs
C$37.92
C$143.92
C$113.78 +15% C$17.07+10% C$13.08
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Category I engineer
1.41
person-hour
C$17.48
C$24.64
Category II Engineer
0.69
person-hour
C$15.94
C$11.00
Category III Engineer
0.69
person-hour
C$14.31
C$9.87
Chemical analysis
3.00
pcs
C$17.07
C$51.20
Chemical analysis
3.00
pcs
C$5.69
C$17.07
Cost Summary
Direct Cost
381%
C$668,667.51
Overhead
+15%
C$100,300.13
Profit
+10%
C$76,896.74
Grand Total
C$175,353.09
Resource Summary
87 resourcesiAggregated materials, labor, and equipment needed for the entire project
Materials to Order (47)
Resource
Unit
Qty
Unit Price
Cost
Water
m3
45.46
C$463.79
C$21,083.78
Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V
t
1.59
C$7,734.09
C$12,281.73
Steel bolts with hexagonal head, complete with hexagonal nut and flat
t
0.28
C$28,943.75
C$8,104.25
Edged softwood boards, natural moisture content, length RI-NE.SA m, wi
m3
1.15
C$6,280.88
C$7,235.57
Cartridges for construction and installation gun, red tip, length 10-1
1000 pcs
0.12
C$57,602.92
C$6,912.35
Bitumen-polymer waterproofing primer, anti-corrosion, for protecting m
t
0.06
C$114,120.50
C$6,847.23
Bauxite chips, fraction 1-3 mm
kg
500.00
C$3.49
C$1,742.95
Modified amine epoxy resin hardener
kg
50.00
C$26.58
C$1,329.00
Mine props made of coniferous wood (pine, fir), length KA.DX-PU m, dia
m3
0.78
C$1,622.01
C$1,265.17
Gravel M 400-1000, fraction 5(3)-10 mm
m3
1.84
C$685.17
C$1,260.71
Roofing sheet steel, grade STK-1, thickness KA.SA mm
t
0.48
C$2,406.54
C$1,155.14
Installation of sand cushions 30 cm thick
m
300.00
C$3.13
C$939.51
Installation of a waste chute receiving valve
pcs
6.00
C$145.52
C$873.12
Ready-mixed masonry mortar, cement, M100
m3
0.30
C$2,301.40
C$690.42
Polymer primer containing organic solvents and adhesive additives for
kg
40.00
C$17.02
C$680.99
Galvanized welded steel pipes for water and gas pipelines with threade
m
8.00
C$69.78
C$558.28
Modified epoxy resin, mass fraction of epoxy groups not less than RIME
kg
50.00
C$10.94
C$547.01
Welding electrodes for welding low-alloy and carbon steels UONI 13/45,
kg
63.20
C$7.45
C$470.70
Seamless hot-rolled steel pipes with chamfered edges, steel grades 10,
m
16.16
C$25.51
C$412.20
Installation of polyethylene fittings: tees
pcs
15.00
C$25.04
C$375.53
Propane-butane technical mixture
kg
6.27
C$51.18
C$320.92
General-purpose asbestos cord, diameter 18-25 mm
t
0.02
C$15,891.50
C$317.83
Seamless hot-rolled steel pipes with chamfered edges, steel grades 10,
m
5.05
C$46.73
C$236.01
Coloring pigment for epoxy resin
kg
1.00
C$172.36
C$172.36
Unslaked chlorinated lime for construction, grade A
kg
0.15
C$1,077.13
C$161.57
Acetylene gas, technical grade
m3
4.00
C$30.49
C$121.97
Technical gaseous oxygen
m3
14.51
C$8.32
C$120.75
Portland cement without additives for general construction CEM 0 32.5N
t
0.03
C$3,756.00
C$112.68
Fire valve 50-10 for water, nominal pressure ME.KA MPa, nominal diamet
pcs
2.00
C$55.67
C$111.35
Heat-resistant paper tape for painting work with an adhesive layer on
m
175.00
C$0.48
C$84.42
Grand Total
C$77,027.66
Labor Requirements (10)
Resource
Unit
Qty
Unit Price
Cost
Worker Category 1
hrs
1,619.90
C$26.36
C$42,700.35
Personnel: 1 person-hour/machine-hour
Machine hours
224.77
C$14.94
C$3,358.05
Average workload TO.KA
hrs
103.65
C$20.29
C$2,102.69
Personnel: 2 man-hours/machine-hour
Machine hours
8.32
C$32.84
C$273.19
Grade 5 worker
hrs
1.97
C$20.59
C$40.57
Category I engineer
person-hour
1.41
C$17.48
C$24.64
Category II Engineer
person-hour
0.69
C$15.94
C$11.00
Category III Engineer
person-hour
0.69
C$14.30
C$9.87
2nd grade worker
hrs
0.37
C$17.37
C$6.44
Grade 3 worker
hrs
0.08
C$18.93
C$1.56
Grand Total
C$48,528.36
Equipment Requirements (30)
Resource
Unit
Qty
Unit Price
Cost
Pipe layers, nominal load capacity MERI.SA t
Machine hours
35.57
C$108.85
C$3,871.76
Mobile cranes, lifting capacity 16 t
Machine hours
34.59
C$61.08
C$2,113.16
Pipe layers, nominal load capacity NE.TO t
Machine hours
32.58
C$52.26
C$1,702.64
Filling and pressure testing units, flow rate up to 70 m3/h
Machine hours
22.02
C$65.07
C$1,432.76
Welding units for manual arc welding on a tractor, welding current up
Machine hours
22.14
C$52.28
C$1,157.43
Railway cranes, lifting capacity 16 t
Machine hours
8.32
C$90.88
C$756.10
Electric bridge cranes, lifting capacity 10 t
Machine hours
52.36
C$13.36
C$699.40
Mobile electric bitumen boilers with centrifugal agitator, loading cap
Machine hours
32.11
C$8.11
C$260.28
Flatbed trucks, load capacity up to 5 tons
Machine hours
7.91
C$28.03
C$221.64
Universal front-end pneumatic wheeled single-bucket loaders, nominal c
Machine hours
2.16
C$68.67
C$148.39
Mobile screw compressors with internal combustion engines, pressure up
Machine hours
8.22
C$15.32
C$125.89
Semi-automatic butt welding machines for plastic pipes with a diameter
Machine hours
36.90
C$3.13
C$115.59
Welding machines for manual arc welding, welding current up to 350 A
Machine hours
69.52
C$1.34
C$93.03
Auto hydraulic lifts, lifting height 22 m
Machine hours
1.88
C$46.03
C$86.53
Wide gauge platforms, load capacity 73 t
Machine hours
8.32
C$8.30
C$69.02
Special-purpose all-terrain vehicles, load capacity up to ME.SA tons
Machine hours
2.50
C$23.23
C$58.08
Flatbed trucks, load capacity up to 10 tons
Machine hours
1.35
C$41.41
C$55.98
Semi-automatic butt welding machines for plastic pipes with a diameter
Machine hours
4.95
C$5.09
C$25.20
Chemical analysis
pcs
3.00
C$5.69
C$17.07
Mobile screw compressors with electric motor, pressure up to 1 MPa (10
Machine hours
2.40
C$7.05
C$16.92
Grand Total
C$13,063.07
Material Alternatives
iAlternative materials with approximate price difference. Percentages show material cost change relative to the current specification.
Laying water supply pipelines from pressure polyethylenC$28,108.89
Copper pipe+120%PEX pipe-15%Stainless steel+200%
Installation of external adhesive waterproofing of guttC$13,051.37
Monte Carlo · 10KiMonte Carlo simulation (10,000 iterations) showing completion probability at different confidence levels
70days
P50
50% probability the project finishes within this timeframe. Median scenario based on Monte Carlo simulation.
77days
P80
80% probability — recommended planning basis. Accounts for common delays and uncertainties.
84days
P95
95% probability — conservative estimate. Covers nearly all risk scenarios including severe delays.
+14days
Buffer
Recommended time buffer to add to the deterministic schedule. Covers typical construction uncertainties.
Base Cost (P50)
C$175,353.09
Budget (P80)
C$193,823.62
Maximum (P95)
C$211,524.54
Contingency
+10.5%
Recommended cost reserve based on schedule risk analysis — C$18,470.53 Recommended Budget: C$193,823.62
Deterministic 63 days
P50 70 days
P80 77 days
P95 84 days
P50 P80 P95
Based on Monte Carlo simulation with 10,000 iterations using PERT distribution for each phase duration.
Peak: 9
1,962 man-hours
2 crit. phases
Cost Risk Analysis
Monte Carlo · 10,000 iterations
Monte Carlo simulation of construction cost uncertainty
Cost Percentiles
C$1,040,681.40
P10
C$1,060,974.60
P25
C$1,085,823.64
P50
C$1,117,606.88
P80
C$1,133,845.61
P90
Cumulative Probability (S-Curve)
+2.9%
Recommended Contingency (P80 − P50)
Reserve to cover likely cost overruns with 80% confidence — C$31,783.24
Top Risk Drivers
Category
Work Item
Risk Share
Chambers
Filter press with cast iron frames, hydraulic or e
72.0%
Chambers
Installation of water meter units with piping manu
23.4%
Pipe Installation
Laying water supply pipelines from pressure polyet
1.9%
Excavation
Laying pipelines in an underwater trench in sectio
1.2%
Excavation
Installation of external adhesive waterproofing of
0.4%
Pipe Installation
Air release valve, diameter: 1500 mm
0.4%
Pipe Installation
Installation of steel gate valves or check valves
0.2%
Pipe Installation
Reinforced anti-corrosion insulation with domestic
0.2%
Sensitivity Analysis
±10%iImpact of ±10% change in each cost component on the total project cost
This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.
Decrease ← → IncreaseImpact
Overhead57% of total
±C$10,030.01±5.7%
Materials44% of total
±C$7,702.77±4.4%
Profit44% of total
±C$7,689.67±4.4%
Labor28% of total
±C$4,852.84±2.8%
Equipment7% of total
±C$1,306.31±0.7%
Cost Summary
iFinal cost breakdown with direct costs, overhead, profit, and grand total
Labor
C$48,528.35
28%
Materials
C$77,027.68
44%
Equipment
C$13,063.06
7%
Direct Cost
C$668,667.51
Overhead
C$100,300.13
57%
Profit
C$76,896.74
44%
Grand Total
C$175,353.09
100%
EUR equivalent
€109.390,57
USD equivalent
$126,072.64
GBP equivalent
£95,446.56
Estimate Classification
AACE 18R-97
AACE International Recommended Practice 18R-97
2
ClassClass 2
Typical PurposeCost Control
Expected Accuracy Range:-15% / +20%
Project Definition Level:30–75%
Cost Benchmark
Office · North America
Comparison of estimated cost/m² against market reference ranges
Low 1,800
▲ Typical 2,500
High 3,800
▼ Your Estimate 1,796 EUR/m²
Below typical range · 0.72x ratio to typical
Methodology & Assumptions
iCalculation methodology, data sources, and key assumptions underlying this estimate
Data Source
DDC Pricing DB — English
Confidence Level
50%
Overhead Rate
15%
Profit Rate
10%
Items Matched
20
Assumptions
Costs adjusted by location-specific labor, material, and equipment factors
Exchange rates are offline reference rates and may differ from market rates
All amounts exclude VAT / sales tax
This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
All labor, materials, and equipment per defined scope
Overhead and profit margins as specified
Location-adjusted pricing factors applied
Excluded from Estimate
VAT / sales tax
Permits, licenses, and legal fees
Temporary works and site facilities
Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 27 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 27 work items covering Preparation, Excavation, Pipe Installation, Chambers, Backfill & Reinstatement, Testing & Commissioning. Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Water Supply Network take?
Duration depends on project size and complexity. A typical 300 m pipeline project takes approximately 4 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a water supply network include?
Professional estimate for installing a 500-metre water supply network. Includes trench excavation, ductile iron and PVC pipe laying, valve chambers, fire hydrants, thrust blocks, service connections, pressure testing, disinfection, backfill, and surface reinstatement. Based on Canadian municipal water infrastructure standards.