Window & Door Replacement Cost Estimate — 10 windows + 2 doors
10 windows + 2 doors24 work items5 sectionsToronto, Canada
About This Project
Detailed estimate for replacing 10 windows and 2 exterior doors in a residential property. Includes removal and disposal of existing units, supply and installation of triple-glazed PVC windows (various sizes), insulated composite front door, back door, foam insulation around frames, vapour and weather tapes, interior and exterior sills, reveal plastering, and roller shutter adjustment.
Data Source:DDC Pricing DB — English·55,719 items·CWICR
City Adjustment
🏛 Toronto, Canada
Your city matches the base — coefficients ×1.00
PPP Coefficients
Labor Factor
×
click to adjust
Material Factor
×
click to adjust
Equipment Factor
×
click to adjust
Prices from a professional construction database (55,719 items), adjusted to your city using construction-specific Purchasing Power Parity (PPP). Coefficients can be manually adjusted.
Detection Confidence
50%
Cost Breakdown
iHow the total cost is distributed: labor, materials, equipment, overhead, and profit margins
C$28,468.84Direct Cost
Labor (31%)C$11,003.87
Materials (47%)C$17,037.09
Equipment (1%)C$427.88
Overhead (12%)C$4,270.33
Profit (9%)C$3,273.92
Cost / m²
Labor
C$110.04
Materials
C$170.37
Equipment
C$4.28
Overhead
C$42.70
Profit
C$32.74
Grand Total
C$360.13
Materials / Labor
1.55
Direct Cost %
79.1%
24 work items across 5 categories, 44 resources
Cost Flow
5iVisual flow of the total budget through work categories, showing proportional cost distribution
Complete BOQ: 24 work items for Window & Door Replacement
Categories
5iCost distribution by work category — earthwork, structure, facade, MEP, finishes, etc.
Category
Cost
Cost / m²
Share
Removal
C$11,530.98
C$115.31
32.0%
New Doors
C$5,589.95
C$55.90
15.5%
New Windows
C$120.23
C$1.20
0.3%
Sills & Finishing
C$5,444.21
C$54.44
15.1%
Installation & Sealing
C$13,327.75
C$133.28
37.0%
Top Items
Description
Total
Repair of wide composite window frames with removal of …
C$7,299.46
Insulation around the perimeter of skylight cups: made …
C$6,156.41
Installation of composite flange outdoor lighting suppo…
C$5,182.36
Installation of aluminum and bimetallic radiators with …
C$4,638.02
Repairing the front surface of exterior brick walls wit…
C$3,245.31
What-If Scenarios
iExplore how changes in material, labor, or equipment costs affect the total project budget
Optimistic (-10%)
C$32,411.78
↓ C$3,601.31 savings
Labor -10% · Materials -10% · Equipment -10%
Base Estimate
C$36,013.09
Deterministic
Labor ×1.00 · Materials ×1.00 · Equipment ×1.00
Pessimistic (+15%)
C$41,415.05
↑ C$5,401.96 increase
Labor +15% · Materials +15% · Equipment +15%
Custom Scenario: Adjust cost components
Labor0%
Materials0%
Equipment0%
Custom Scenario Total Cost
C$36,013.09
Clicking Apply will update PPP coefficients and recalculate all line items
Project Schedule
≈4 monthsiProject timeline with critical path method (CPM), Gantt chart, and resource allocation
Construction PhasesAI
Site PreparationSite clearing, temporary facilities setup, access roads8d
MEP FinishFinal electrical, plumbing, and HVAC connections8d
Painting and FinishesInterior and exterior painting, final trim work8d
Final Cleanup and HandoverFinal cleaning, inspections, punch list completion8d
4
months
121
days
16
phases
12
Critical Path
4
Peak workers
452
Labor Hours
Site PreparationEarthworksFoundationStructural FrameworkRoofingExternal WallsWindows and Exterior DoorsMEP Rough-inInsulationDrywall and PlasteringInterior DoorsFlooringBathroom FixturesMEP FinishPainting and FinishesFinal Cleanup and HandoverCumulative Cost
Labor Hours by Phase
Structural Framework
349 hours
Site Preparation
73 hours
Earthworks
50 hours
Foundation
50 hours
Roofing
50 hours
External Walls
50 hours
Windows and Exterior
50 hours
MEP Rough-in
50 hours
Insulation
50 hours
Drywall and Plasteri
50 hours
Interior Doors
50 hours
Flooring
50 hours
Bathroom Fixtures
50 hours
Final Cleanup and Ha
50 hours
MEP Finish
28 hours
Painting and Finishe
3 hours
Monthly Cash Flow
4 monthsiMonthly cost distribution and cumulative S-curve showing how project spending builds over time
32%
M1
70%
M2
70%
M3
100%
M4
Month
days
Monthly Cost
%
Cumulative
%
M1
1–30
C$11,632.42
32.3%
C$11,632.42
32%
M2
31–60
C$13,543.33
37.6%
C$25,175.75
70%
M3
61–90
C$0.00
0.0%
C$25,175.75
70%
M4
91–120
C$10,837.37
30.1%
C$36,013.12
100%
Daily Cash Flow
17 weeks
3%
D1
24%
D12
24%
D23
38%
D34
53%
D45
69%
D56
70%
D67
70%
D78
70%
D89
81%
D100
100%
D111
100%
D113
Week
days
Weekly Cost
%
Cumulative
%
W1
D1–D7
C$7,544.94
21.0%
C$7,544.94
21%
W2
D8–D14
C$1,077.85
3.0%
C$8,622.79
24%
W3
D15–D21
C$0.00
0.0%
C$8,622.79
24%
W4
D22–D28
C$2,006.42
5.6%
C$10,629.21
30%
W5
D29–D35
C$3,511.23
9.7%
C$14,140.44
39%
W6
D36–D42
C$3,511.23
9.7%
C$17,651.68
49%
W7
D43–D49
C$3,511.23
9.7%
C$21,162.91
59%
W8
D50–D56
C$3,511.23
9.7%
C$24,674.15
69%
W9
D57–D63
C$501.60
1.4%
C$25,175.75
70%
W10
D64–D70
C$0.00
0.0%
C$25,175.75
70%
W11
D71–D77
C$0.00
0.0%
C$25,175.75
70%
W12
D78–D84
C$0.00
0.0%
C$25,175.75
70%
W13
D85–D91
C$0.00
0.0%
C$25,175.75
70%
W14
D92–D98
C$1,329.45
3.7%
C$26,505.19
74%
W15
D99–D105
C$9,306.12
25.8%
C$35,811.31
99%
W16
D106–D112
C$176.58
0.5%
C$35,987.89
100%
W17
D113–D113
C$25.23
0.1%
C$36,013.12
100%
Line Items
24 itemsiDetailed work items grouped by category with quantities, unit prices, and resource breakdown
▼Removal6 itemsC$11,530.98
#
Code
Description
Qty
Unit
Unit Price
Total
1
SAVO_KAME_KAKARI_KAME
Dismantling dormer windows: rectangular gable
10.0
10 pcs(Removal)
pcs
C$76.01
C$961.59
C$760.15 +15% C$114.02+10% C$87.42
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload RI.RI
34.13
hrs
C$22.26
C$759.90
Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t)
0.61
Machine hours
C$0.40
C$0.25
2
SANE_KAME_KAKADX_KATO
Removing door frames: in wooden walls
1.0
1 pcs(Removal)
pcs
C$29.86
C$37.77
C$29.86 +15% C$4.48+10% C$3.43
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload RI.RI
1.34
hrs
C$22.27
C$29.86
3
KAVO_KAME_KARINE_KATOm
6-10 kV outdoor switchgear cabinet with service corridor: with high-frequency communication equipment or backup
1.0
1 pcs(Removal)
pcs
C$322.21
C$407.59
C$322.21 +15% C$48.33+10% C$37.05
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
9.27
hrs
C$25.79
C$239.10
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm
0.80
kg
C$5.89
C$4.71
MA-0115 oil paint, mummy, iron minium
0.20
kg
C$4.94
C$0.99
Mobile cranes, lifting capacity 16 t
0.78
Machine hours
C$63.50
C$49.53
Personnel: 1 person-hour/machine-hour
0.78
Machine hours
C$18.38
C$14.34
Flatbed trucks, load capacity up to 5 tons
0.29
Machine hours
C$24.66
C$7.15
Personnel: 1 person-hour/machine-hour
0.29
Machine hours
C$13.68
C$3.96
Welding machines for manual arc welding, welding current up to 350 A
1.77
Machine hours
C$1.37
C$2.43
4
SANE_KAME_KAKAPU_MEME
Repair of wide composite window frames with removal of window sills and frames: in wooden log walls
10.0
10 pcs(Removal)
pcs
C$577.03
C$7,299.46
C$5,770.32 +15% C$865.55+10% C$663.59
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
148.97
hrs
C$25.13
C$3,742.99
Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter TO.SA mm, length 35 mm
13.33
100 pcs
C$1.56
C$20.76
Coarse technical felt for insulation, dark, thickness 8-10 mm
136.00
kg
C$12.00
C$1,767.40
Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II
0.33
m3
C$707.76
C$233.56
Flatbed trucks, load capacity up to 5 tons
0.14
Machine hours
C$25.79
C$3.61
Personnel: 1 person-hour/machine-hour
0.14
Machine hours
C$14.29
C$2.00
5
SANE_KAME_KAKAPU_KATO
Repair of narrow single window frames without removing window sills and frames: in wooden frame walls
10.0
10 pcs(Removal)
pcs
C$215.68
C$2,728.41
C$2,156.84 +15% C$323.53+10% C$248.04
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
33.83
hrs
C$25.07
C$848.16
Coarse technical felt for insulation, dark, thickness 8-10 mm
92.00
kg
C$12.97
C$1,192.99
Edged softwood beams (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade II
0.16
m3
C$706.22
C$113.00
Dry wood glue
0.20
kg
C$5.45
C$1.09
Flatbed trucks, load capacity up to 5 tons
0.04
Machine hours
C$25.75
C$1.03
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$14.25
C$0.57
6
SAVO_KAME_KAKARI_KAME
Dismantling dormer windows: rectangular gable
1.0
1 set(Removal)
pcs
C$76.01
C$96.16
C$76.01 +15% C$11.40+10% C$8.74
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload RI.RI
3.41
hrs
C$22.26
C$75.99
Electric winches with a pulling force of up to SA.LIDX kN (KA.SADX t)
0.06
Machine hours
C$0.29
C$0.02
▼New Windows4 itemsC$120.23
#
Code
Description
Qty
Unit
Unit Price
Total
7
MEKA_KAME_KATOSA_KARI
Installation of PVC window sills: in panel walls
4.0
4 pcs(New Windows)
m
C$9.50
C$48.09
C$38.02 +15% C$5.70+10% C$4.37
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
0.78
hrs
C$23.78
C$18.55
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
1.36
pcs
C$12.04
C$16.36
Plastic mounting wedges
0.16
100 pcs
C$17.50
C$2.80
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.00
Machine hours
C$2.41
C$0.01
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$12.63
C$0.03
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$26.13
C$0.18
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$14.21
C$0.09
8
MEKA_KAME_KATOSA_KARI
Installation of PVC window sills: in panel walls
3.0
3 pcs(New Windows)
m
C$9.50
C$36.07
C$28.51 +15% C$4.28+10% C$3.28
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
0.58
hrs
C$23.79
C$13.92
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
1.02
pcs
C$12.04
C$12.27
Plastic mounting wedges
0.12
100 pcs
C$17.51
C$2.10
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$12.63
C$0.02
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$25.54
C$0.13
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$14.21
C$0.07
9
MEKA_KAME_KATOSA_KARI
Installation of PVC window sills: in panel walls
2.0
2 pcs(New Windows)
m
C$9.50
C$24.05
C$19.01 +15% C$2.85+10% C$2.19
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
0.39
hrs
C$23.83
C$9.29
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
0.68
pcs
C$12.04
C$8.18
Plastic mounting wedges
0.08
100 pcs
C$17.51
C$1.40
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$12.65
C$0.01
Flatbed trucks, load capacity up to 5 tons
0.00
Machine hours
C$24.45
C$0.08
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$14.24
C$0.05
10
MEKA_KAME_KATOSA_KARI
Installation of PVC window sills: in panel walls
1.0
1 pcs(New Windows)
m
C$9.50
C$12.02
C$9.50 +15% C$1.43+10% C$1.09
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
0.20
hrs
C$23.71
C$4.62
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
0.34
pcs
C$12.04
C$4.09
Plastic mounting wedges
0.04
100 pcs
C$17.51
C$0.70
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$12.59
C$0.01
Flatbed trucks, load capacity up to 5 tons
0.00
Machine hours
C$27.51
C$0.05
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$14.16
C$0.03
▼New Doors2 itemsC$5,589.95
#
Code
Description
Qty
Unit
Unit Price
Total
11
TOTO_KASA_KAKAVO_KAME
Installation of composite flange outdoor lighting supports
1.0
1 pcs(New Doors)
pcs
C$4,096.72
C$5,182.36
C$4,096.73 +15% C$614.51+10% C$471.12
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
1.42
hrs
C$18.50
C$26.28
Drilling and crane machines on a truck chassis, drilling diameter up to 800 mm, drilling depth up to 5 m
0.60
Machine hours
C$112.47
C$67.48
Personnel: 1 person-hour/machine-hour
0.60
Machine hours
C$12.71
C$7.62
Installation of composite flange outdoor lighting supports
1.00
pcs
C$3,995.35
C$3,995.35
12
KAVO_KAME_KARINE_KATOm
6-10 kV outdoor switchgear cabinet with service corridor: with high-frequency communication equipment or backup
1.0
1 pcs(New Doors)
pcs
C$322.21
C$407.59
C$322.21 +15% C$48.33+10% C$37.05
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
9.27
hrs
C$25.79
C$239.10
Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm
0.80
kg
C$5.89
C$4.71
MA-0115 oil paint, mummy, iron minium
0.20
kg
C$4.94
C$0.99
Mobile cranes, lifting capacity 16 t
0.78
Machine hours
C$63.50
C$49.53
Personnel: 1 person-hour/machine-hour
0.78
Machine hours
C$18.38
C$14.34
Flatbed trucks, load capacity up to 5 tons
0.29
Machine hours
C$24.66
C$7.15
Personnel: 1 person-hour/machine-hour
0.29
Machine hours
C$13.68
C$3.96
Welding machines for manual arc welding, welding current up to 350 A
1.77
Machine hours
C$1.37
C$2.43
▼Installation & Sealing6 itemsC$13,327.75
#
Code
Description
Qty
Unit
Unit Price
Total
13
MEVO_KATO_KAKANE_KAME
Installation of aluminum and bimetallic radiators with wall mounting with the number of sections: up to 4
10.0
10 pcs(Installation & Sealing)
pcs
C$366.64
C$4,638.02
C$3,666.41 +15% C$549.96+10% C$421.64
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
4.81
hrs
C$24.68
C$118.62
Electricity
0.27
kWh
C$8,707.48
C$2,455.12
Drill bit with carbide tip, SDS-plus shank for hammer drilling holes in hard materials, total length 160 mm, diameter 10 mm
0.01
pcs
C$101,753.68
C$1,091.16
Mobile cranes, lifting capacity 16 t
0.01
Machine hours
C$65.81
C$0.72
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$19.08
C$0.21
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.01
Machine hours
C$2.36
C$0.02
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$12.62
C$0.07
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$25.56
C$0.31
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$14.20
C$0.17
14
TOLI_KAME_KAMEPU_KARIm
Installation of machines and mechanisms indoors, weight of machines and mechanisms: KA.KASA t
2.0
2 pcs(Installation & Sealing)
pcs
C$720.17
C$1,822.03
C$1,440.34 +15% C$216.05+10% C$165.64
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
51.20
hrs
C$24.97
C$1,278.27
Technical gaseous oxygen
2.88
m3
C$6.30
C$18.14
Propane-butane technical mixture
0.48
kg
C$2.76
C$1.32
Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 4-5 mm
7.20
kg
C$5.58
C$40.18
Electric winches with a pulling force of MESANE.DXNE kN (16 t)
5.80
Machine hours
C$3.24
C$18.78
Personnel: 1 person-hour/machine-hour
5.80
Machine hours
C$12.04
C$69.84
Flatbed trucks, load capacity up to 5 tons
0.14
Machine hours
C$24.43
C$3.42
Personnel: 1 person-hour/machine-hour
0.14
Machine hours
C$13.55
C$1.90
Gas welding and cutting equipment
0.34
Machine hours
C$0.21
C$0.07
Welding machines for manual arc welding, welding current up to 350 A
6.20
Machine hours
C$1.36
C$8.42
15
MERI_KAME_KAMEVO_KATO
Insulation around the perimeter of skylight cups: made of organic glass in buildings with profiled flooring
65.0
65 m(Installation & Sealing)
m
C$74.87
C$6,156.41
C$4,866.72 +15% C$730.01+10% C$559.67
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
29.25
hrs
C$26.25
C$767.79
Ready-mixed masonry mortar, cement, M100
0.33
m3
C$12,185.76
C$4,039.36
Tower cranes, lifting capacity 8 t
0.37
Machine hours
C$42.15
C$15.62
Personnel: 1 person-hour/machine-hour
0.37
Machine hours
C$19.14
C$7.09
Mobile cranes, lifting capacity 16 t
0.12
Machine hours
C$67.15
C$8.30
Personnel: 1 person-hour/machine-hour
0.12
Machine hours
C$19.14
C$2.36
Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l
3.33
Machine hours
C$5.81
C$19.39
Flatbed trucks, load capacity up to 5 tons
0.17
Machine hours
C$26.08
C$4.41
Personnel: 1 person-hour/machine-hour
0.17
Machine hours
C$14.25
C$2.41
16
KALI_KASA_KATODX_RIPU
Sealing device for horizontal and vertical joints of exterior wall panels with self-adhesive air-tight waterproofing tap
65.0
65 m(Installation & Sealing)
m
C$2.86
C$234.92
C$185.70 +15% C$27.86+10% C$21.36
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
5.22
hrs
C$25.37
C$132.44
Sealing device for horizontal and vertical joints of exterior wall panels with s
65.00
m
C$0.82
C$53.26
17
KALI_KASA_KATODX_RIPU
Sealing device for horizontal and vertical joints of exterior wall panels with self-adhesive air-tight waterproofing tap
65.0
65 m(Installation & Sealing)
m
C$2.86
C$234.92
C$185.70 +15% C$27.86+10% C$21.36
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
5.22
hrs
C$25.37
C$132.44
Sealing device for horizontal and vertical joints of exterior wall panels with s
65.00
m
C$0.82
C$53.26
18
MESA_KALI_KAMEVO_KAME
Sealing joints with silicone sealant
65.0
65 m(Installation & Sealing)
m
C$2.94
C$241.45
C$190.87 +15% C$28.63+10% C$21.95
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
2nd grade worker
0.01
hrs
C$22.03
C$0.28
Grade 3 worker
7.03
hrs
C$24.06
C$169.18
Paper-based adhesive tapes, width 50 mm
131.95
m
C$0.14
C$18.79
Colored cotton rags
0.13
kg
C$3.78
C$0.49
White spirit
0.49
kg
C$3.81
C$1.86
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$25.98
C$0.17
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$14.37
C$0.09
▼Sills & Finishing6 itemsC$5,444.21
#
Code
Description
Qty
Unit
Unit Price
Total
19
KALI_KASA_KARIME_RIME
Installation of interior wall blocks using dry mix mortar with a mass of: over 1 to RI.SA tons
10.0
10 pcs(Sills & Finishing)
pcs
C$85.41
C$1,080.39
C$854.06 +15% C$128.11+10% C$98.22
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
22.20
hrs
C$23.41
C$519.72
Water
0.09
m3
C$1.68
C$0.15
Dry cement-sand mixtures for installation and masonry, aggregate size no more than TO.SA mm, class B7.5 (M100), F50
0.60
t
C$211.40
C$126.20
Tower cranes, lifting capacity 8 t
3.63
Machine hours
C$38.34
C$139.16
Personnel: 1 person-hour/machine-hour
3.63
Machine hours
C$17.68
C$64.16
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.04
Machine hours
C$63.37
C$2.79
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$15.13
C$0.66
Mobile mortar mixers, drum capacity 150 l
0.10
Machine hours
C$0.22
C$0.03
Personnel: 1 person-hour/machine-hour
0.10
Machine hours
C$11.69
C$1.19
20
MEKA_KAME_KATOSA_KATO
Installation of PVC window sills: in stone walls thicker than KA.SAME m
10.0
10 pcs(Sills & Finishing)
m
C$13.67
C$172.94
C$136.71 +15% C$20.51+10% C$15.72
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average workload TO.KA
1.96
hrs
C$23.78
C$46.64
Polyurethane foam sealant (assembly foam), universal, volume 1000 ml
6.80
pcs
C$12.03
C$81.86
Plastic mounting wedges
0.40
100 pcs
C$17.49
C$6.99
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.01
Machine hours
C$2.38
C$0.02
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$12.63
C$0.08
Flatbed trucks, load capacity up to 5 tons
0.03
Machine hours
C$25.76
C$0.72
Personnel: 1 person-hour/machine-hour
0.03
Machine hours
C$14.21
C$0.40
21
NEME_KAME_KAKAME_KADX
Continuous leveling of interior surfaces (single-layer plastering) with dry mortar mixtures up to 10 mm thick for subseq
18.0
18 m²(Sills & Finishing)
m2
C$40.23
C$916.15
C$724.24 +15% C$108.63+10% C$83.29
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Average work load RI.DX
6.45
hrs
C$23.35
C$150.57
Water
0.09
m3
C$6,185.04
C$571.19
Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t
0.00
Machine hours
C$69.62
C$0.25
Personnel: 1 person-hour/machine-hour
0.00
Machine hours
C$16.17
C$0.06
Single-mast hoists, load capacity up to 500 kg, lifting height 45 m
0.04
Machine hours
C$2.40
C$0.09
Personnel: 1 person-hour/machine-hour
0.04
Machine hours
C$12.50
C$0.47
Mobile mortar mixers, drum capacity 65 l
0.13
Machine hours
C$0.16
C$0.02
Personnel: 1 person-hour/machine-hour
0.13
Machine hours
C$12.50
C$1.60
22
SATO_KAME_KAMEPU_KATO
Repairing the front surface of exterior brick walls with a filling depth of: 1 brick with an area of up to 1 m2 in one p
10.0
10 m²(Sills & Finishing)
m2
C$256.55
C$3,245.31
C$2,565.46 +15% C$384.82+10% C$295.03
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
60.69
hrs
C$23.96
C$1,453.99
Water
0.12
m3
C$16.12
C$1.82
Masonry mortar, cement-lime, M50
0.58
m3
C$1,882.27
C$1,091.72
Mobile cranes, lifting capacity 16 t
0.20
Machine hours
C$69.57
C$13.91
Personnel: 1 person-hour/machine-hour
0.20
Machine hours
C$20.07
C$4.02
23
MESA_KALI_KARITO_KAME
Installation of roller blinds, blinds
6.0
6 pcs(Sills & Finishing)
pcs
C$3.81
C$28.87
C$22.83 +15% C$3.42+10% C$2.62
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
2nd grade worker
0.03
hrs
C$21.00
C$0.65
Grade 4 worker
0.78
hrs
C$27.06
C$21.07
Electricity
0.09
kWh
C$0.30
C$0.03
Plastic dowels with screws, diameter 6 mm, length 35 mm, screw diameter TO.SA mm, screw length 50 mm
0.24
100 pcs
C$3.06
C$0.74
Flatbed trucks, load capacity up to 5 tons
0.01
Machine hours
C$26.31
C$0.22
Personnel: 1 person-hour/machine-hour
0.01
Machine hours
C$14.35
C$0.12
24
NEDX_KAME_KARINE_KAME
Cleaning after dismantling structures: boards
1.0
1 set(Sills & Finishing)
pcs
C$0.43
C$0.55
C$0.43 +15% C$0.06+10% C$0.05
Labor Materials Equipment
Type
Resource
Qty
Unit
Unit Price
Cost
Worker Category 1
0.02
hrs
C$22.87
C$0.43
Cost Summary
Direct Cost
79%
C$28,468.84
Overhead
+15%
C$4,270.33
Profit
+10%
C$3,273.92
Grand Total
C$36,013.09
Resource Summary
44 resourcesiAggregated materials, labor, and equipment needed for the entire project
Materials to Order (23)
Resource
Unit
Qty
Unit Price
Cost
Ready-mixed masonry mortar, cement, M100
m3
0.33
C$12,185.10
C$4,039.36
Installation of composite flange outdoor lighting supports
pcs
1.00
C$3,995.35
C$3,995.35
Coarse technical felt for insulation, dark, thickness 8-10 mm
kg
228.00
C$12.98
C$2,960.39
Electricity
kWh
0.36
C$6,797.20
C$2,455.15
Masonry mortar, cement-lime, M50
m3
0.58
C$1,882.28
C$1,091.72
Drill bit with carbide tip, SDS-plus shank for hammer drilling holes i
Monte Carlo · 10KiMonte Carlo simulation (10,000 iterations) showing completion probability at different confidence levels
131days
P50
50% probability the project finishes within this timeframe. Median scenario based on Monte Carlo simulation.
138days
P80
80% probability — recommended planning basis. Accounts for common delays and uncertainties.
144days
P95
95% probability — conservative estimate. Covers nearly all risk scenarios including severe delays.
+17days
Buffer
Recommended time buffer to add to the deterministic schedule. Covers typical construction uncertainties.
Base Cost (P50)
C$36,013.09
Budget (P80)
C$37,813.15
Maximum (P95)
C$39,538.21
Contingency
+5.0%
Recommended cost reserve based on schedule risk analysis — C$1,800.06 Recommended Budget: C$37,813.15
Deterministic 121 days
P50 131 days
P80 138 days
P95 144 days
P50 P80 P95
Based on Monte Carlo simulation with 10,000 iterations using PERT distribution for each phase duration.
Peak: 4
452 man-hours
12 crit. phases
Cost Risk Analysis
Monte Carlo · 10,000 iterations
Monte Carlo simulation of construction cost uncertainty
Cost Percentiles
C$44,923.78
P10
C$45,460.07
P25
C$46,109.47
P50
C$46,925.46
P80
C$47,385.14
P90
Cumulative Probability (S-Curve)
+1.8%
Recommended Contingency (P80 − P50)
Reserve to cover likely cost overruns with 80% confidence — C$815.00
Top Risk Drivers
Category
Work Item
Risk Share
Removal
Repair of wide composite window frames with remova
33.1%
Installation & Sealing
Insulation around the perimeter of skylight cups:
23.9%
New Doors
Installation of composite flange outdoor lighting
16.9%
Installation & Sealing
Installation of aluminum and bimetallic radiators
13.7%
Removal
Repair of narrow single window frames without remo
4.7%
Sills & Finishing
Repairing the front surface of exterior brick wall
4.0%
Installation & Sealing
Installation of machines and mechanisms indoors, w
2.1%
Removal
Dismantling dormer windows: rectangular gable
0.6%
Sensitivity Analysis
±10%iImpact of ±10% change in each cost component on the total project cost
This tornado chart shows how a ±10% change in each cost category affects the total estimate. The wider the bar, the greater the cost impact — helping identify which cost drivers carry the most risk and where tighter cost control may be needed.
Decrease ← → IncreaseImpact
Materials47% of total
±C$1,703.71±4.7%
Labor31% of total
±C$1,100.39±3.1%
Overhead12% of total
±C$427.03±1.2%
Profit9% of total
±C$327.39±0.9%
Equipment1% of total
±C$42.79±0.1%
Cost Summary
iFinal cost breakdown with direct costs, overhead, profit, and grand total
Labor
C$11,003.87
31%
Materials
C$17,037.09
47%
Equipment
C$427.88
1%
Direct Cost
C$28,468.84
Overhead
C$4,270.33
12%
Profit
C$3,273.92
9%
Grand Total
C$36,013.09
100%
EUR equivalent
€22.466,06
USD equivalent
$25,892.13
GBP equivalent
£19,602.31
Estimate Classification
AACE 18R-97
AACE International Recommended Practice 18R-97
2
ClassClass 2
Typical PurposeCost Control
Expected Accuracy Range:-15% / +20%
Project Definition Level:30–75%
Cost Benchmark
Residential · North America
Comparison of estimated cost/m² against market reference ranges
Low 1,500
▲ Typical 2,200
High 3,500
▼ Your Estimate 229 EUR/m²
Significantly below range · 0.10x ratio to typical
Methodology & Assumptions
iCalculation methodology, data sources, and key assumptions underlying this estimate
Data Source
DDC Pricing DB — English
Confidence Level
50%
Overhead Rate
15%
Profit Rate
10%
Items Matched
24
Assumptions
Costs adjusted by location-specific labor, material, and equipment factors
Exchange rates are offline reference rates and may differ from market rates
All amounts exclude VAT / sales tax
This estimate is for preliminary budgeting only — not a binding quotation
Included in Estimate
All labor, materials, and equipment per defined scope
Overhead and profit margins as specified
Location-adjusted pricing factors applied
Excluded from Estimate
VAT / sales tax
Permits, licenses, and legal fees
Temporary works and site facilities
Design and engineering fees
Prices current as of 2026-03-16 · No cost escalation or inflation adjustment applied
The cost depends on your location, materials chosen, and project scope. Use our calculator with your specific city to get an instant estimate based on 24 verified work items from our database of 55,719 construction prices.
What work items are included in this estimate?
This BOQ includes 24 work items covering Removal, New Windows, New Doors, Installation & Sealing, Sills & Finishing. Each item is matched to unit rates from our verified pricing database spanning 9 languages and 36 locations worldwide.
How long does Window & Door Replacement take?
Duration depends on project size and complexity. A typical 10 windows + 2 doors project takes approximately 4 weeks. Our calculator generates a detailed Gantt chart with phase-by-phase scheduling.
How accurate is this estimate?
Our estimates use verified construction pricing data with location-specific adjustments (PPP factors). The Monte Carlo simulation provides P10-P90 confidence intervals. For formal budgeting, we recommend a Class 3 AACE estimate with local contractor quotes.
What does a window & door replacement include?
Detailed estimate for replacing 10 windows and 2 exterior doors in a residential property. Includes removal and disposal of existing units, supply and installation of triple-glazed PVC windows (various sizes), insulated composite front door, back door, foam insulation around frames, vapour and weather tapes, interior and exterior sills, reveal plastering, and roller shutter adjustment.