{"query":"private villa with pool 320 m2 in London","status":"success","context":{"city":"London","area_m2":320.0,"country":"UK","currency":"GBP","language":"en","profit_rate":0.1,"display_lang":"en","pricing_lang":"en","building_type":"residential","location_code":"UK-LON","overhead_rate":0.15},"currency":"GBP","warnings":[],"breakdown":{"labor":75945.3,"total":147428.57,"profit":13402.59,"material":37655.2,"overhead":17481.64,"equipment":2943.84,"direct_cost":116544.34},"line_items":[{"unit":"1000 m3","total":268.98,"source":"pricing_db","category":"Earthwork","quantity":38.4,"rate_code":"KAME_KAME_KAKAME_KAMECON","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":0.0591,"total_cost":1.09,"unit_price":18.4164},{"name":"Bulldozers, power 79 kW (108 hp)","type":"equipment","unit":"Machine hours","quantity":0.0614,"total_cost":2.24,"unit_price":36.4035},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.0614,"total_cost":0.83,"unit_price":13.4298},{"name":"Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3","type":"equipment","unit":"Machine hours","quantity":0.0614,"total_cost":209.31,"unit_price":3406.6678},{"name":"Personnel: 3 man-hours/machine-hours","type":"labor","unit":"Machine hours","quantity":0.0614,"total_cost":3.09,"unit_price":50.3066}],"labor_cost":7.78,"unit_price":5.54,"description":"Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: 15 m3, soil group 1","labor_share":0.0366,"profit_cost":24.45,"material_cost":0.0,"overhead_cost":31.89,"equipment_cost":204.85,"material_share":0.0,"equipment_share":0.9634},{"unit":"100 m3","total":4478.49,"source":"pricing_db","category":"Foundation","quantity":19.2,"rate_code":"KANE_KAME_KAKAME_KAMECON","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":25.92,"total_cost":397.18,"unit_price":15.3231},{"name":"Water","type":"material","unit":"m3","quantity":0.336,"total_cost":0.43,"unit_price":1.2769},{"name":"Polyethylene film, thickness KA.MESA mm","type":"material","unit":"m2","quantity":48.0,"total_cost":20.61,"unit_price":0.4293},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":3.456,"total_cost":100.66,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":3.456,"total_cost":46.41,"unit_price":13.4298},{"name":"Surface vibrators","type":"equipment","unit":"Machine hours","quantity":1.1386,"total_cost":0.44,"unit_price":0.3853},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.023,"total_cost":0.42,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.023,"total_cost":0.23,"unit_price":9.9953}],"labor_cost":399.63,"unit_price":184.39,"description":"Concrete preparation device","labor_share":0.1129,"profit_cost":407.14,"material_cost":3038.57,"overhead_cost":531.05,"equipment_cost":102.11,"material_share":0.8583,"equipment_share":0.0288},{"unit":"100 m3","total":7093.85,"source":"pricing_db","category":"Structure","quantity":16.0,"rate_code":"KANE_KAME_KAKAME_KASA","resources":[{"name":"Average workload TO.KA","type":"labor","unit":"hrs","quantity":101.44,"total_cost":1697.31,"unit_price":16.7322},{"name":"Water","type":"material","unit":"m3","quantity":0.0704,"total_cost":0.09,"unit_price":1.2769},{"name":"Electricity","type":"material","unit":"kWh","quantity":0.3344,"total_cost":0.07,"unit_price":0.2092},{"name":"Polyethylene film, thickness KA.MESA mm","type":"material","unit":"m2","quantity":24.48,"total_cost":10.51,"unit_price":0.4293},{"name":"Construction nails","type":"material","unit":"t","quantity":0.0032,"total_cost":8.29,"unit_price":2590.7548},{"name":"Quicklime, grade I","type":"material","unit":"t","quantity":0.0048,"total_cost":1.19,"unit_price":247.713},{"name":"Light wire, diameter ME.ME mm","type":"material","unit":"t","quantity":0.0016,"total_cost":4.22,"unit_price":2638.7937},{"name":"Hot-rolled wire in coils, diameter NE.TO-NE.SA mm","type":"material","unit":"t","quantity":0.0064,"total_cost":11.46,"unit_price":1790.9686},{"name":"Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III","type":"material","unit":"m3","quantity":0.1184,"total_cost":48.48,"unit_price":409.4756},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":4.856,"total_cost":141.44,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":4.856,"total_cost":65.21,"unit_price":13.4298},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":0.0992,"total_cost":4.6,"unit_price":46.3987},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.0992,"total_cost":1.33,"unit_price":13.4298},{"name":"Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t","type":"equipment","unit":"Machine hours","quantity":0.04,"total_cost":1.93,"unit_price":48.149},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.04,"total_cost":0.46,"unit_price":11.4924},{"name":"Deep vibrators","type":"equipment","unit":"Machine hours","quantity":4.4576,"total_cost":1.72,"unit_price":0.3853},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.144,"total_cost":2.59,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.144,"total_cost":1.44,"unit_price":9.9953}],"labor_cost":1723.0,"unit_price":350.49,"description":"Construction of reinforced concrete foundations for general use under columns with a volume of: up to 3 m3","labor_share":0.3073,"profit_cost":644.9,"material_cost":3730.21,"overhead_cost":841.17,"equipment_cost":154.58,"material_share":0.6652,"equipment_share":0.0276},{"unit":"m3","total":33207.6,"source":"pricing_db","category":"External Walls","quantity":67.2,"rate_code":"KAVO_KARI_KAKAME_KAMECON","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":305.088,"total_cost":4977.16,"unit_price":16.3139},{"name":"Water","type":"material","unit":"m3","quantity":29.568,"total_cost":37.76,"unit_price":1.2769},{"name":"Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade IV","type":"material","unit":"m3","quantity":0.0,"total_cost":0.0,"unit_price":354.8539},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":26.88,"total_cost":782.94,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":26.88,"total_cost":360.99,"unit_price":13.4298}],"labor_cost":19184.6,"unit_price":390.64,"description":"Laying of external brick walls: simple with a floor height of up to 4 m","labor_share":0.7308,"profit_cost":3018.87,"material_cost":6805.91,"overhead_cost":3937.66,"equipment_cost":260.56,"material_share":0.2593,"equipment_share":0.0099},{"unit":"m3","total":6464.6,"source":"pricing_db","category":"Internal Walls","quantity":22.4,"rate_code":"KAVO_KAME_KAKAME_KANE","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":124.768,"total_cost":2035.45,"unit_price":16.3139},{"name":"Hot bitumen roofing mastic MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":920.1477},{"name":"Water","type":"material","unit":"m3","quantity":0.224,"total_cost":0.29,"unit_price":1.2769},{"name":"Ready-mixed masonry mortar, cement, M50","type":"material","unit":"m3","quantity":8.512,"total_cost":1146.8,"unit_price":134.7269},{"name":"RKK-350 roofing felt","type":"material","unit":"m2","quantity":12.768,"total_cost":24.88,"unit_price":1.9484},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":3.136,"total_cost":145.51,"unit_price":46.3987},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":3.136,"total_cost":42.12,"unit_price":13.4298},{"name":"Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l","type":"equipment","unit":"Machine hours","quantity":0.224,"total_cost":0.9,"unit_price":4.0179},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":2.688,"total_cost":48.44,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":2.688,"total_cost":26.87,"unit_price":9.9953}],"labor_cost":2654.57,"unit_price":228.14,"description":"Masonry of rubble stone walls with brick facing using hot mastic: only openings with a floor height of up to 4 m","labor_share":0.5194,"profit_cost":587.69,"material_cost":2201.69,"overhead_cost":766.55,"equipment_cost":254.1,"material_share":0.4308,"equipment_share":0.0497},{"unit":"100 m2","total":4795.43,"source":"pricing_db","category":"Roofing","quantity":128.0,"rate_code":"MERI_KAME_KAKALI_KASA","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":123.648,"total_cost":2199.57,"unit_price":17.7889},{"name":"Steel roofing nails, diameter 2-3 mm, length 20-40 mm","type":"material","unit":"kg","quantity":9.984,"total_cost":26.82,"unit_price":2.686},{"name":"Galvanized steel washers, round, hole diameter M16-24","type":"material","unit":"kg","quantity":4.5696,"total_cost":29.83,"unit_price":6.5277},{"name":"Self-tapping steel screws with a semi-circular head and a straight slot, pointed, diameter 4 mm, length 40 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":3655.6577},{"name":"Ready-mixed masonry mortar, cement, M100","type":"material","unit":"m3","quantity":0.3456,"total_cost":50.46,"unit_price":145.9991},{"name":"Forgings from square billets, weight ME.SA-PU.SA kg","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":2359.1685},{"name":"Galvanized sheet steel, thickness KA.LI mm","type":"material","unit":"t","quantity":0.064,"total_cost":141.67,"unit_price":2213.6428},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":1.7408,"total_cost":50.7,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":1.7408,"total_cost":23.38,"unit_price":13.4298},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":0.4608,"total_cost":21.38,"unit_price":46.3987},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.4608,"total_cost":6.19,"unit_price":13.4298},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.7296,"total_cost":13.15,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.7296,"total_cost":7.29,"unit_price":9.9953}],"labor_cost":2374.07,"unit_price":29.62,"description":"Installation of tile roofs: grooved stamped or pressed (ceramic and cement-sand (concrete))","labor_share":0.6263,"profit_cost":435.95,"material_cost":1324.79,"overhead_cost":568.63,"equipment_cost":91.99,"material_share":0.3495,"equipment_share":0.0243},{"unit":"100 m2","total":14803.5,"source":"pricing_db","category":"Windows","quantity":38.4,"rate_code":"MEKA_KAME_KARILI_KAME","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":62.8339,"total_cost":1104.61,"unit_price":17.5798},{"name":"Electricity","type":"material","unit":"kWh","quantity":3.5942,"total_cost":0.75,"unit_price":0.2092},{"name":"Polyurethane foam sealant (assembly foam), universal, volume 1000 ml","type":"material","unit":"pcs","quantity":19.9296,"total_cost":168.71,"unit_price":8.4652},{"name":"Construction nails","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":2590.7548},{"name":"Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm","type":"material","unit":"t","quantity":0.0038,"total_cost":14.83,"unit_price":3862.421},{"name":"Plaster mortar, lime, M200","type":"material","unit":"m3","quantity":0.0538,"total_cost":8.06,"unit_price":149.8409},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":2.039,"total_cost":59.39,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":2.039,"total_cost":27.38,"unit_price":13.4298},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.8525,"total_cost":15.36,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.8525,"total_cost":8.52,"unit_price":9.9953}],"labor_cost":1123.35,"unit_price":304.75,"description":"Installation of window blocks with frames in residential and public buildings: paired in stone walls with an opening are","labor_share":0.096,"profit_cost":1345.77,"material_cost":10503.0,"overhead_cost":1755.36,"equipment_cost":76.02,"material_share":0.8975,"equipment_share":0.0065},{"unit":"100 m2","total":2632.32,"source":"pricing_db","category":"Doors","quantity":9.6,"rate_code":"MEKA_KAME_KAMENE_KARI","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":11.9837,"total_cost":205.53,"unit_price":17.1505},{"name":"Electricity","type":"material","unit":"kWh","quantity":0.5779,"total_cost":0.12,"unit_price":0.2092},{"name":"Polyurethane foam sealant (assembly foam), universal, volume 1000 ml","type":"material","unit":"pcs","quantity":0.096,"total_cost":0.81,"unit_price":8.4652},{"name":"Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm","type":"material","unit":"10 pcs","quantity":3.3984,"total_cost":11.6,"unit_price":3.4125},{"name":"Self-tapping steel screws with countersunk head and cross-shaped slot, drill tip, diameter PU.VO mm, length 80 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":11760.4739},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":0.0634,"total_cost":2.94,"unit_price":46.3987},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.0634,"total_cost":0.85,"unit_price":13.4298},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.0518,"total_cost":0.93,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.0518,"total_cost":0.52,"unit_price":9.9953}],"labor_cost":207.02,"unit_price":216.76,"description":"Installation of partitions made of PVC profiles: with door block","labor_share":0.0995,"profit_cost":239.3,"material_cost":1869.97,"overhead_cost":312.13,"equipment_cost":3.9,"material_share":0.8986,"equipment_share":0.0019},{"unit":"100 m2","total":8567.66,"source":"pricing_db","category":"Flooring","quantity":272.0,"rate_code":"MEME_KAME_KATOPU_KAPU","resources":[{"name":"Average workload TO.KA","type":"labor","unit":"hrs","quantity":61.336,"total_cost":1026.28,"unit_price":16.7322},{"name":"Electricity","type":"material","unit":"kWh","quantity":1.5776,"total_cost":0.33,"unit_price":0.2092},{"name":"Foamed polyethylene underlay for parquet and laminate flooring, thickness 2 mm","type":"material","unit":"10 m","quantity":28.56,"total_cost":117.58,"unit_price":4.117},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.272,"total_cost":4.9,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.272,"total_cost":2.72,"unit_price":9.9953}],"labor_cost":1044.55,"unit_price":24.9,"description":"Installation of coverings: made of laminated boards with a lock joint","labor_share":0.1542,"profit_cost":778.88,"material_cost":5723.31,"overhead_cost":1015.93,"equipment_cost":5.0,"material_share":0.845,"equipment_share":0.0007},{"unit":"100 m2","total":468.85,"source":"pricing_db","category":"Bathroom","quantity":32.0,"rate_code":"NETO_KATO_KAKAME_KASA","resources":[{"name":"Average work load RI.ME","type":"labor","unit":"hrs","quantity":23.776,"total_cost":367.73,"unit_price":15.4662},{"name":"Single-mast hoists, load capacity up to 500 kg, lifting height 45 m","type":"equipment","unit":"Machine hours","quantity":0.112,"total_cost":0.19,"unit_price":1.6622},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.112,"total_cost":0.99,"unit_price":8.8835},{"name":"Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 5 m3/min","type":"equipment","unit":"Machine hours","quantity":0.5248,"total_cost":2.59,"unit_price":4.9426},{"name":"Pneumatic jackhammers powered by mobile compressors","type":"equipment","unit":"Machine hours","quantity":1.0496,"total_cost":0.1,"unit_price":0.0991}],"labor_cost":367.76,"unit_price":11.58,"description":"Removing wall coverings: made of glazed ceramic tiles","labor_share":0.9922,"profit_cost":42.62,"material_cost":0.0,"overhead_cost":55.59,"equipment_cost":2.88,"material_share":0.0,"equipment_share":0.0078},{"unit":"100 m2","total":3581.23,"source":"pricing_db","category":"Plastering","quantity":512.0,"rate_code":"NEME_KAME_KAKAME_KAME","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":151.4496,"total_cost":2470.73,"unit_price":16.3139},{"name":"Water","type":"material","unit":"m3","quantity":1.792,"total_cost":2.29,"unit_price":1.2769},{"name":"Plaster mortar, lime, M100","type":"material","unit":"m3","quantity":2.7136,"total_cost":355.68,"unit_price":131.0723},{"name":"Single-mast hoists, load capacity up to 500 kg, lifting height 45 m","type":"equipment","unit":"Machine hours","quantity":1.6384,"total_cost":2.72,"unit_price":1.6622},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":1.6384,"total_cost":14.55,"unit_price":8.8835}],"labor_cost":2827.91,"unit_price":5.53,"description":"Continuous leveling of wall plaster with cement-lime mortar with a thickness of: up to 5 mm","labor_share":0.9989,"profit_cost":325.57,"material_cost":0.0,"overhead_cost":424.65,"equipment_cost":3.1,"material_share":0.0,"equipment_share":0.0011},{"unit":"100 m2","total":1740.56,"source":"pricing_db","category":"Painting","quantity":512.0,"rate_code":"NERI_KAME_KAKAME_KAME","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":70.144,"total_cost":1134.28,"unit_price":16.1708},{"name":"Copper sulfate, grade A","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":7086.444},{"name":"Water","type":"material","unit":"m3","quantity":0.6144,"total_cost":0.78,"unit_price":1.2769},{"name":"Hard laundry soap 72%","type":"material","unit":"pcs","quantity":8.704,"total_cost":6.8,"unit_price":0.7816},{"name":"Natural ground chalk","type":"material","unit":"t","quantity":0.1024,"total_cost":15.63,"unit_price":152.6479},{"name":"Pumice","type":"material","unit":"kg","quantity":1.2288,"total_cost":130.05,"unit_price":105.8309},{"name":"Two-layer sanding paper with a grain size of 40-25","type":"material","unit":"m2","quantity":0.4096,"total_cost":9.19,"unit_price":22.4343},{"name":"Colored cotton rags","type":"material","unit":"kg","quantity":0.0512,"total_cost":0.13,"unit_price":2.6309},{"name":"Glue for glass wallpaper","type":"material","unit":"kg","quantity":4.4544,"total_cost":9.41,"unit_price":2.1135},{"name":"Single-mast hoists, load capacity up to 500 kg, lifting height 45 m","type":"equipment","unit":"Machine hours","quantity":0.512,"total_cost":0.85,"unit_price":1.6622},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.512,"total_cost":4.55,"unit_price":8.8835},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.256,"total_cost":4.61,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.256,"total_cost":2.56,"unit_price":9.9953}],"labor_cost":1314.48,"unit_price":2.69,"description":"Painting with adhesive compounds: simple","labor_share":0.9553,"profit_cost":158.23,"material_cost":55.13,"overhead_cost":206.39,"equipment_cost":6.34,"material_share":0.0401,"equipment_share":0.0046},{"unit":"100 m","total":3770.74,"source":"pricing_db","category":"Electrical","quantity":960.0,"rate_code":"KAVO_KARI_TODXKA_KAMEm","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":156.384,"total_cost":2914.46,"unit_price":18.6365},{"name":"Electricity","type":"material","unit":"kWh","quantity":63.072,"total_cost":13.19,"unit_price":0.2092},{"name":"Polyethylene expansion dowels, diameter 6 mm, length 40 mm","type":"material","unit":"1000 pcs","quantity":1.92,"total_cost":18.47,"unit_price":9.621},{"name":"Self-tapping steel screws with a semi-circular head and a straight slot, pointed, diameter 4 mm, length 40 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":3655.6577},{"name":"Single-mast hoists, load capacity up to 500 kg, lifting height 45 m","type":"equipment","unit":"Machine hours","quantity":0.096,"total_cost":0.16,"unit_price":1.6622},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.096,"total_cost":0.85,"unit_price":8.8835}],"labor_cost":2980.61,"unit_price":3.1,"description":"Plastic boxes: up to 40 mm wide","labor_share":0.9999,"profit_cost":342.79,"material_cost":0.0,"overhead_cost":447.12,"equipment_cost":0.22,"material_share":0.0,"equipment_share":0.0001},{"unit":"100 m","total":2130.27,"source":"pricing_db","category":"Plumbing","quantity":256.0,"rate_code":"MENE_KARI_KAKARI_KAME","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":86.272,"total_cost":1625.86,"unit_price":18.8457},{"name":"Dissolved technical acetylene, grade B","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":21269.7567},{"name":"Technical gaseous oxygen","type":"material","unit":"m3","quantity":0.8704,"total_cost":4.04,"unit_price":4.6454},{"name":"Water","type":"material","unit":"m3","quantity":0.64,"total_cost":0.82,"unit_price":1.2769},{"name":"Linen thread","type":"material","unit":"kg","quantity":0.128,"total_cost":0.69,"unit_price":5.4159},{"name":"Uncoated welding wire SV-08G2S, diameter 4 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":3382.9455},{"name":"Unslaked chlorinated lime for construction, grade A","type":"material","unit":"kg","quantity":0.0,"total_cost":0.0,"unit_price":2.785},{"name":"MA-0115 oil paint, mummy, iron minium","type":"material","unit":"kg","quantity":1.1264,"total_cost":4.07,"unit_price":3.6106},{"name":"Combined drying oil for diluting thick oil paints and for exterior work on wooden surfaces","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":2200.9065},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":0.2048,"total_cost":5.97,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.2048,"total_cost":2.75,"unit_price":13.4298},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":0.1536,"total_cost":7.13,"unit_price":46.3987},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.1536,"total_cost":2.06,"unit_price":13.4298},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":1.024,"total_cost":18.45,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":1.024,"total_cost":10.24,"unit_price":9.9953},{"name":"Gas welding and cutting equipment","type":"equipment","unit":"Machine hours","quantity":3.0464,"total_cost":0.47,"unit_price":0.1541}],"labor_cost":1651.49,"unit_price":6.58,"description":"Laying water supply pipelines made of galvanized steel water and gas pipes with a diameter of: 15 mm","labor_share":0.9807,"profit_cost":193.66,"material_cost":0.0,"overhead_cost":252.6,"equipment_cost":32.52,"material_share":0.0,"equipment_share":0.0193},{"unit":"100 m","total":49730.19,"source":"pricing_db","category":"Heating","quantity":640.0,"rate_code":"MEVO_KATO_KAKAPU_KAME","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":95.36,"total_cost":1696.35,"unit_price":17.7889},{"name":"Electricity","type":"material","unit":"kWh","quantity":2.24,"total_cost":0.47,"unit_price":0.2092},{"name":"Linen thread","type":"material","unit":"kg","quantity":0.704,"total_cost":3.81,"unit_price":5.4159},{"name":"Galvanized steel dowel nails with washers, diameter PU.SA mm, length 30-60 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":8119.743},{"name":"Ready-mixed masonry mortar, cement, M50","type":"material","unit":"m3","quantity":0.0,"total_cost":0.0,"unit_price":134.7269},{"name":"MA-0115 oil paint, mummy, iron minium","type":"material","unit":"kg","quantity":1.408,"total_cost":5.08,"unit_price":3.6106},{"name":"Combined drying oil for diluting thick oil paints and for exterior work on wooden surfaces","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":2200.9065},{"name":"Single reinforced steel brackets for mounting radiators, bracket length 130 mm","type":"material","unit":"100 pcs","quantity":1.408,"total_cost":183.02,"unit_price":129.9825},{"name":"Steel anchor brackets with dowels, painted, for mounting radiators, diameter 7 mm, bracket length 300 mm, plastic dowel diameter 10 mm, length 60 mm","type":"material","unit":"100 pcs","quantity":1.408,"total_cost":177.71,"unit_price":126.2177},{"name":"Heating registers made of steel water and gas pipes, non-galvanized, thread diameter 20 mm","type":"material","unit":"m","quantity":640.0,"total_cost":37022.11,"unit_price":57.847},{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":0.064,"total_cost":1.86,"unit_price":29.1272},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.064,"total_cost":0.86,"unit_price":13.4298},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":0.64,"total_cost":29.7,"unit_price":46.3987},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.64,"total_cost":8.6,"unit_price":13.4298},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":2.56,"total_cost":46.13,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":2.56,"total_cost":25.59,"unit_price":9.9953}],"labor_cost":37590.27,"unit_price":61.43,"description":"Installation of steel registers: water and gas pipes with a thread diameter of 20 mm","labor_share":0.9562,"profit_cost":4520.93,"material_cost":0.0,"overhead_cost":5896.86,"equipment_cost":1722.13,"material_share":0.0,"equipment_share":0.0438},{"unit":"100 m2","total":3694.27,"source":"pricing_db","category":"Insulation","quantity":176.0,"rate_code":"RINE_KAME_KATOSA_KAME","resources":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":28.4592,"total_cost":494.35,"unit_price":17.3706},{"name":"Self-lifting two-seater cradles, load capacity 300 kg","type":"equipment","unit":"Machine hours","quantity":11.7744,"total_cost":7.65,"unit_price":0.6495},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":0.88,"total_cost":15.86,"unit_price":18.0201},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":0.88,"total_cost":8.8,"unit_price":9.9953}],"labor_cost":494.21,"unit_price":16.59,"description":"Insulation of walls with glass fiber-based mineral wool slabs fastened with dowels when working from a cradle: in a sing","labor_share":0.1692,"profit_cost":335.84,"material_cost":2402.62,"overhead_cost":438.06,"equipment_cost":23.54,"material_share":0.8227,"equipment_share":0.0081}],"total_cost":147428.57,"generated_at":"2026-02-23T14:54:43.659137","input_source":"text_query","report_paths":{},"currency_symbol":"£","location_factor":1.28,"line_items_count":16,"resource_summary":{"labor":[{"name":"Worker Category 1","type":"labor","unit":"hrs","quantity":1242.3695,"total_cost":21256.62,"unit_price":17.1097},{"name":"Average workload TO.KA","type":"labor","unit":"hrs","quantity":162.776,"total_cost":2723.59,"unit_price":16.7321},{"name":"Personnel: 1 person-hour/machine-hour","type":"labor","unit":"Machine hours","quantity":55.7343,"total_cost":705.14,"unit_price":12.6518},{"name":"Average work load RI.ME","type":"labor","unit":"hrs","quantity":23.776,"total_cost":367.73,"unit_price":15.4664},{"name":"Personnel: 3 man-hours/machine-hours","type":"labor","unit":"Machine hours","quantity":0.0614,"total_cost":3.09,"unit_price":50.3257}],"equipment":[{"name":"Tower cranes, lifting capacity 8 t","type":"equipment","unit":"Machine hours","quantity":39.2406,"total_cost":1142.96,"unit_price":29.127},{"name":"Mobile cranes, lifting capacity 16 t","type":"equipment","unit":"Machine hours","quantity":4.553,"total_cost":211.26,"unit_price":46.4002},{"name":"Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3","type":"equipment","unit":"Machine hours","quantity":0.0614,"total_cost":209.31,"unit_price":3408.9577},{"name":"Flatbed trucks, load capacity up to 5 tons","type":"equipment","unit":"Machine hours","quantity":9.4809,"total_cost":170.84,"unit_price":18.0194},{"name":"Self-lifting two-seater cradles, load capacity 300 kg","type":"equipment","unit":"Machine hours","quantity":11.7744,"total_cost":7.65,"unit_price":0.6497},{"name":"Single-mast hoists, load capacity up to 500 kg, lifting height 45 m","type":"equipment","unit":"Machine hours","quantity":2.3584,"total_cost":3.92,"unit_price":1.6621},{"name":"Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 5 m3/min","type":"equipment","unit":"Machine hours","quantity":0.5248,"total_cost":2.59,"unit_price":4.9352},{"name":"Bulldozers, power 79 kW (108 hp)","type":"equipment","unit":"Machine hours","quantity":0.0614,"total_cost":2.24,"unit_price":36.4821},{"name":"Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket RI.NE m3, load capacity 5 t","type":"equipment","unit":"Machine hours","quantity":0.04,"total_cost":1.93,"unit_price":48.25},{"name":"Deep vibrators","type":"equipment","unit":"Machine hours","quantity":4.4576,"total_cost":1.72,"unit_price":0.3859},{"name":"Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l","type":"equipment","unit":"Machine hours","quantity":0.224,"total_cost":0.9,"unit_price":4.0179},{"name":"Gas welding and cutting equipment","type":"equipment","unit":"Machine hours","quantity":3.0464,"total_cost":0.47,"unit_price":0.1543},{"name":"Surface vibrators","type":"equipment","unit":"Machine hours","quantity":1.1386,"total_cost":0.44,"unit_price":0.3864},{"name":"Pneumatic jackhammers powered by mobile compressors","type":"equipment","unit":"Machine hours","quantity":1.0496,"total_cost":0.1,"unit_price":0.0953}],"materials":[{"name":"Heating registers made of steel water and gas pipes, non-galvanized, thread diameter 20 mm","type":"material","unit":"m","quantity":640.0,"total_cost":37022.11,"unit_price":57.847},{"name":"Ready-mixed masonry mortar, cement, M50","type":"material","unit":"m3","quantity":8.512,"total_cost":1146.8,"unit_price":134.7274},{"name":"Plaster mortar, lime, M100","type":"material","unit":"m3","quantity":2.7136,"total_cost":355.68,"unit_price":131.0731},{"name":"Single reinforced steel brackets for mounting radiators, bracket length 130 mm","type":"material","unit":"100 pcs","quantity":1.408,"total_cost":183.02,"unit_price":129.9858},{"name":"Steel anchor brackets with dowels, painted, for mounting radiators, diameter 7 mm, bracket length 300 mm, plastic dowel diameter 10 mm, length 60 mm","type":"material","unit":"100 pcs","quantity":1.408,"total_cost":177.71,"unit_price":126.2145},{"name":"Polyurethane foam sealant (assembly foam), universal, volume 1000 ml","type":"material","unit":"pcs","quantity":20.0256,"total_cost":169.52,"unit_price":8.4652},{"name":"Galvanized sheet steel, thickness KA.LI mm","type":"material","unit":"t","quantity":0.064,"total_cost":141.67,"unit_price":2213.5937},{"name":"Pumice","type":"material","unit":"kg","quantity":1.2288,"total_cost":130.05,"unit_price":105.835},{"name":"Foamed polyethylene underlay for parquet and laminate flooring, thickness 2 mm","type":"material","unit":"10 m","quantity":28.56,"total_cost":117.58,"unit_price":4.1169},{"name":"Ready-mixed masonry mortar, cement, M100","type":"material","unit":"m3","quantity":0.3456,"total_cost":50.46,"unit_price":146.0069},{"name":"Edged softwood boards, natural moisture content, length RI-NE.SA m, width 100-250 mm, thickness 44-50 mm, grade III","type":"material","unit":"m3","quantity":0.1184,"total_cost":48.48,"unit_price":409.4595},{"name":"Water","type":"material","unit":"m3","quantity":33.2448,"total_cost":42.46,"unit_price":1.2772},{"name":"Polyethylene film, thickness KA.MESA mm","type":"material","unit":"m2","quantity":72.48,"total_cost":31.12,"unit_price":0.4294},{"name":"Galvanized steel washers, round, hole diameter M16-24","type":"material","unit":"kg","quantity":4.5696,"total_cost":29.83,"unit_price":6.5279},{"name":"Steel roofing nails, diameter 2-3 mm, length 20-40 mm","type":"material","unit":"kg","quantity":9.984,"total_cost":26.82,"unit_price":2.6863},{"name":"RKK-350 roofing felt","type":"material","unit":"m2","quantity":12.768,"total_cost":24.88,"unit_price":1.9486},{"name":"Polyethylene expansion dowels, diameter 6 mm, length 40 mm","type":"material","unit":"1000 pcs","quantity":1.92,"total_cost":18.47,"unit_price":9.6198},{"name":"Natural ground chalk","type":"material","unit":"t","quantity":0.1024,"total_cost":15.63,"unit_price":152.6367},{"name":"Electricity","type":"material","unit":"kWh","quantity":71.3961,"total_cost":14.93,"unit_price":0.2091},{"name":"Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 8 mm, length 100 mm","type":"material","unit":"t","quantity":0.0038,"total_cost":14.83,"unit_price":3902.6316},{"name":"Steel frame mounting dowels, diameter 10 mm, length 130 (132) mm","type":"material","unit":"10 pcs","quantity":3.3984,"total_cost":11.6,"unit_price":3.4134},{"name":"Hot-rolled wire in coils, diameter NE.TO-NE.SA mm","type":"material","unit":"t","quantity":0.0064,"total_cost":11.46,"unit_price":1790.625},{"name":"Glue for glass wallpaper","type":"material","unit":"kg","quantity":4.4544,"total_cost":9.41,"unit_price":2.1125},{"name":"Two-layer sanding paper with a grain size of 40-25","type":"material","unit":"m2","quantity":0.4096,"total_cost":9.19,"unit_price":22.4365},{"name":"MA-0115 oil paint, mummy, iron minium","type":"material","unit":"kg","quantity":2.5344,"total_cost":9.15,"unit_price":3.6103},{"name":"Construction nails","type":"material","unit":"t","quantity":0.0032,"total_cost":8.29,"unit_price":2590.625},{"name":"Plaster mortar, lime, M200","type":"material","unit":"m3","quantity":0.0538,"total_cost":8.06,"unit_price":149.8141},{"name":"Hard laundry soap 72%","type":"material","unit":"pcs","quantity":8.704,"total_cost":6.8,"unit_price":0.7812},{"name":"Linen thread","type":"material","unit":"kg","quantity":0.832,"total_cost":4.5,"unit_price":5.4087},{"name":"Light wire, diameter ME.ME mm","type":"material","unit":"t","quantity":0.0016,"total_cost":4.22,"unit_price":2637.5},{"name":"Technical gaseous oxygen","type":"material","unit":"m3","quantity":0.8704,"total_cost":4.04,"unit_price":4.6415},{"name":"Quicklime, grade I","type":"material","unit":"t","quantity":0.0048,"total_cost":1.19,"unit_price":247.9167},{"name":"Colored cotton rags","type":"material","unit":"kg","quantity":0.0512,"total_cost":0.13,"unit_price":2.5391},{"name":"Edged coniferous timber (spruce, pine), natural moisture content, length RI-NE.SA m, width 20-90 mm, thickness 20-90 mm, grade IV","type":"material","unit":"m3","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Hot bitumen roofing mastic MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Self-tapping steel screws with a semi-circular head and a straight slot, pointed, diameter 4 mm, length 40 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Forgings from square billets, weight ME.SA-PU.SA kg","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Self-tapping steel screws with countersunk head and cross-shaped slot, drill tip, diameter PU.VO mm, length 80 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Copper sulfate, grade A","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Dissolved technical acetylene, grade B","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Uncoated welding wire SV-08G2S, diameter 4 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Unslaked chlorinated lime for construction, grade A","type":"material","unit":"kg","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Combined drying oil for diluting thick oil paints and for exterior work on wooden surfaces","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0},{"name":"Galvanized steel dowel nails with washers, diameter PU.SA mm, length 30-60 mm","type":"material","unit":"t","quantity":0.0,"total_cost":0.0,"unit_price":0}],"unique_labor":5,"total_labor_cost":25056.17,"unique_equipment":14,"unique_materials":44,"total_material_cost":39850.09,"total_equipment_cost":1756.33},"breakdown_by_category":{"Doors":2632.32,"Heating":49730.19,"Roofing":4795.43,"Windows":14803.5,"Bathroom":468.85,"Flooring":8567.66,"Painting":1740.56,"Plumbing":2130.27,"Earthwork":268.98,"Structure":7093.85,"Electrical":3770.74,"Foundation":4478.49,"Insulation":3694.27,"Plastering":3581.23,"External Walls":33207.6,"Internal Walls":6464.6}}